Skip to main content
ISO 9001:2015 · ISO 45001:2018

HT/LT cable route survey — Rajkot, Gujarat

HT/LT Cable Route GPR Survey in Rajkot

Ring Road feeders, estate cabling and old-city LT runs in Rajkot: we trace what already lies on your cable alignment, scan every crossing on its own and paint each find with its depth.

₹24/m standard₹32/m L-sectionMin 4 km · GST extra

How it works · Clearing a Rajkot cable alignment
LT cableWater mainHT cableOFC ductDrainL-SECTION · DEPTH ALONG THE ROUTERoute startRoute end
  1. STEP 1Alignment and crossings listed
  2. STEP 2Radar cart along route
  3. STEP 3EM confirms live lines
  4. STEP 4Depths painted, report signed
1.5 LAKH+ KMGPR Survey Completed
58Company-Owned GPR Systems
23 YEARSUnderground Since 2003
₹24/MStandard GPR Rate · Min 4 km
Quick answer

Planning HT or LT cabling? Our electric cable route GPR survey in Rajkot traces existing cables, pipes and ducts on your alignment, scans each road, rail and river crossing separately and paints every find with its depth. Rates: ₹24 per metre standard, ₹32 per metre including an L-section; at least 4 km and ₹1,00,000 are billed per project, plus GST.

Rates and page checked:

GPR cart being pushed along a road edge during a cable route scan
The cart runs the full length of a Rajkot cable alignment, then across it at intervals.
Technician holding an electromagnetic locator over a buried power cable
Energised feeders under Rajkot roads are confirmed by EM before anything is painted.
Diagram of a new cable crossing beneath a road with existing services below
Ring Road and highway crossings get closer scan lines than the straight runs between them.
Workers hand-digging a shallow trench beside marked utility lines
Painted marks tell the trenching gang where to switch from machine to hand digging.

What does an electric cable route GPR survey in Rajkot record?

An electric cable route GPR survey in Rajkot answers one practical question for the cabling team: what is already in the strip of ground the new HT or LT cable will take? We scan along the proposed alignment and across it at regular gaps, so services running beside your cable and those cutting across its path are both captured.

For every section, the record gives:

  • the position of each detected service against the proposed alignment;
  • its approximate depth wherever it was measured;
  • its likely type – power, water, drainage, telecom or gas – where signal and surface clues allow;
  • each road, rail, river or nala crossing as a separate entry;
  • stretches that could not be scanned, with the reason, so nobody mistakes them for clear ground.

Radar is paired with electromagnetic locating wherever conductive lines are present. That combination is what makes underground electrical line tracing in Rajkot dependable: when two independent methods agree on the same cable, the trenching or boring crew can work with more confidence. Our wider approach is described on the HT/LT cable route GPR survey page, and the physics behind it in how GPR traces HT and LT cables.

Which Rajkot corridors and crossings need the closest scanning?

Cable routes in Rajkot rarely run far without meeting a point where buried services crowd together. These are the places we plan extra passes for:

  • Ring Road and the main radial roads – long feeder routes often follow them, and junctions gather water, drainage and fibre from several directions.
  • Railway lines around Rajkot Junction – any bore or casing under the track needs railway cables and nearby pipes recorded first, and access depends on railway permission obtained by the project owner.
  • The Aji river and its bridges and culverts – crossings here are often planned as HDD bores, so the bore path and both pit areas are scanned.
  • Industrial estate roads such as Aji GIDC, Metoda and Shapar-Veraval – narrow verges already carry private feeders, process water and drains laid unit by unit.
  • Old-city lanes – LT routes squeeze past house connections and older drains in very little width.

Where a crossing will be drilled, our HDD route survey covers the bore corridor in more detail.

Whose lines will a new cable meet under Rajkot roads?

Rajkot is where PGVCL, the state distribution company for Saurashtra and Kutch, has its head office, and most existing power cables under city roads are part of that distribution network. A new route also has to work around:

  • water mains and drainage laid by Rajkot Municipal Corporation;
  • OFC ducts belonging to telecom operators, especially along main roads;
  • street-lighting circuits plus private supply tails running into shops, homes and sheds;
  • feeders and process lines inside estates that never appeared on any public drawing.

Clients looking for a power cable mapping company in Rajkot usually hold only part of this picture. We collect whatever drawings the owners can share, then let the radar confirm, correct or add to them. Mezux Touch has no affiliation with PGVCL or with any other DISCOM; we act only for the contractor, consultant or owner who orders the survey.

How does HT cable route mapping in Rajkot differ from LT work?

The method is the same, but the two kinds of route behave differently on the ground.

HT routes are longer and usually follow main roads between substations or into large industrial consumers. They cross more roads, drains and rail lines, so HT cable route mapping in Rajkot spends a larger share of time on crossings and on bore paths for trenchless sections. Keeping safe separation from other cables matters, so parallel services along the same verge are recorded with care.

LT routes are shorter but busier. They run through residential lanes and market streets with a service connection every few metres, older drains close to the surface and very little room to shift the alignment. Scan lines are spaced closer, and surface clues such as chambers, poles and meter boxes are logged to help identify what the radar sees.

Many orders combine both, and the quote shows each type of stretch separately so the programme is realistic.

What will a Rajkot cable route survey cost?

Charges follow the route length. The standard survey costs ₹24 per metre; with an L-section depth profile it costs ₹32 per metre. Jobs shorter than 4 km are charged as 4 km, and since Rajkot lies outside Delhi NCR, a project total never falls below ₹1,00,000. GST is billed in addition.

RouteSurveyBefore GST
6 km LT reconductoring in lanesStandard₹1,44,000
18 km HT feeder along main roadsStandard₹4,32,000
18 km HT feeder along main roadsL-section₹5,76,000
250 km Saurashtra cabling packageL-section, 25% slab₹60,00,000

Order-size discounts work on the entire order: a quarter off once it passes 100 km, 40% past 500 km and half past 1,000 km. Mobilisation, night-shift work, traffic management or permissions, and CAD/GIS drawing sets are quoted on separate lines. The full slab table sits on our price list page, and quantity planning for tenders is covered in our note on GPR survey quantities in DISCOM BOQs.

When should a Rajkot cable route be surveyed?

The most useful moment is after the route walk and before the alignment is frozen. At that stage a crowded stretch can still be shifted to the other side of the road, and crossings can be moved to where fewer services sit. Surveying only after trenching has begun limits the result to damage control.

Other points to plan for:

  1. Tender stage. An electric grid underground survey in Rajkot is often a BOQ item; fixing its length and type early avoids variation claims later.
  2. Season. Monsoon rain lowers radar depth reach and leaves some verges waterlogged, so deep crossings are better scanned in dry weather where the programme allows.
  3. Excavation soon after. Paint marks fade under traffic, so trenching should follow within days; the signed report stays as the permanent record.

If the contract asks for a depth profile, see the Rajkot L-section survey. Other work in the city is listed on our GPR survey in Rajkot page.

STEP 1

Share the cable alignment

Send the KML or route drawing, total length, voltage class and every crossing the design already shows on it.

STEP 2

Gather owner records

Whatever drawings the distribution network, corporation or telecom owners provide are reviewed before the crew reaches Rajkot.

STEP 3

Scan along and across

Radar runs the length of the route with cross-lines at intervals and extra passes wherever a crossing or junction appears.

STEP 4

Paint lines with depths

Every detected service is marked in its utility colour beside an approximate depth, ready for the trenching or boring crew.

STEP 5

Issue the signed report

Positions, depths, crossings and unscanned stretches are written up and signed by the same crew that worked the route.

Insights

Rajkot cable route survey in numbers

Rate per metre by order size

Standard vs L-section GPR survey, ₹ per metre

StandardL-Section
₹0₹20₹40₹60₹80₹24₹32Up to 100 km₹18₹24100+ km₹14.4₹19.2500+ km₹12₹161,000+ km

Source: Mezux rate card, October 2026.

Standard survey cost for typical orders

Standard ₹24/m, ₹ lakh before GST, slab applied

₹0 L₹30 L₹60 L₹90 L₹120 L₹2.4 L10 km₹12 L50 km₹27 L150 km₹86.4 L600 km

Source: Mezux rate card – amounts before GST.

Our recorded output

Route surveyed, km

0 km300 km600 km900 km1200 km100 kmPeak day700 kmFastest 30 days

Source: Mezux delivery records.

Fact table

FactValueSource
DISCOM head office in RajkotPGVCL (Saurashtra and Kutch)Public record
Cable route survey, standard₹24 per metreMezux rate card
Cable route survey with L-section₹32 per metreMezux rate card
Minimum billed length4 km per orderMezux rate card
Peak survey output on open corridors100 km a dayMezux records

PGVCL details are public; Mezux Touch is not affiliated with PGVCL or any other DISCOM.

Best prices

Get HT/LT Cable Route Survey in Rajkot at Best Prices

Metre rate for any voltage

HT feeders and LT distribution runs are both billed at ₹24 a metre, so a mixed route needs no separate price for each cable class.

L-section on chosen stretches

Pay ₹32 a metre only where the contract asks for a depth profile, keeping straight runs on the standard rate.

Club feeders into one order

Several Rajkot feeders ordered together count as one length for the 4 km minimum and for every discount slab.

Long packages cost less per metre

A cabling package above 100 km drops the rate by 25% on every metre, with deeper cuts beyond 500 and 1,000 km.

No equipment hire passed on

We scan with our own systems and our own crews, so the price carries no rental or sub-letting margin.

Separate items listed openly

Travel from Faridabad, night working, traffic arrangements and drawing sets are each priced as their own line before you sign.

Latest price list

HT/LT Cable Route Survey Rates in Rajkot – October 2026

ServiceUp to 100 kmAbove 100 km
(25% off)
Above 500 km
(40% off)
Above 1,000 km
(50% off)
Standard GPR Survey
minimum 4 km
₹24/m₹18/m₹14.40/m₹12/m
L-Section GPR Survey
minimum 4 km
₹32/m₹24/m₹19.20/m₹16/m

Rates per running metre of route surveyed. GST extra. Discount applies to the whole order quantity once it crosses the slab. Outside Delhi NCR a ₹1,00,000 per-project minimum also applies. Mobilisation, night-shift working, traffic and permission arrangements and CAD/GIS drawing sets are quoted separately. Updated 23 October 2026.

Price range

Lowest rate₹12/mStandard, above 1,000 km
Highest rate₹32/mL-Section, up to 100 km
Minimum order4 km+ ₹1 lakh project minimum outside NCR
FAQ

Questions about cable route surveys in Rajkot

Can the survey tell an HT cable from an LT cable?

Radar by itself cannot be relied on for this, because the two classes return much the same echo. EM locating, cable size, depth, surface markers and owner records together often point to the voltage class, and the report says how each identification was made. Where it matters for design, a trial pit can confirm the cable on request.

Do you scan inside substation or RMU yards?

Only where the owner grants access and a permit to work is in place. Inside yards we scan the area the new cable will pass through, recording earthing runs and existing cable trenches. Work near live equipment follows the owner's safety rules in addition to our own procedures.

Will the survey find abandoned cables?

Radar responds to a dead cable just as it does to a live one, so abandoned lines are usually picked up. EM may miss them because no current flows. Where a cable's status cannot be confirmed, the report lists it as unverified so the excavation crew treats it as live.

Is the survey needed if the cable will go by HDD?

Yes, arguably more so. A drill head cannot see what it is approaching, and a strike deep under a road is harder to spot and repair. Scanning the bore corridor and both pit areas lets the drilling team set a path with clearance from existing services.

Can you survey a Rajkot route at night?

Yes, where traffic or access makes daytime work impractical. Night-shift working is quoted separately from the metre rate. Busy junctions and main roads are often easier to scan at night, though lighting and traffic arrangements must be organised with the project owner.

How soon after the survey should trenching start?

Ideally within a few days. Paint marks on busy roads fade under traffic and rain, and pegs can be moved. The signed report keeps the findings permanently, and if trenching is delayed, a stretch can be re-marked on a separate visit.

Get a quote

Send your Rajkot cable alignment

What to send for an exact quote

  • The alignment as KML, drawing or road list
  • Town and type of site – public road, estate or plant
  • Whether the scope needs an L-section
  • Preferred start date and any night-only stretches
Standard GPR₹24/m
L-Section GPR₹32/m

Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.

What happens next

  1. Scope check – we confirm route length, crossings and L-section need.
  2. Written quote – rate, slab, minimums, extras and a day-by-day programme.
  3. Mobilisation – our own crew and systems on the agreed date.

Get a Quote

Route length, location and survey type – we reply with a written quote.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks