Skip to main content
ISO 9001:2015 · ISO 45001:2018

Survey deliverables — CAD & GIS utility mapping

GIS Based Utility Mapping with CAD Deliverables

Buried cables, pipes and ducts handed over as DWG drawings, SHP layers, KML files and PDF sheets – each line tagged with depth, detection method, confidence and survey date.

₹24/m standard₹32/m L-sectionMin 4 km · GST extra

How it works · Field finds into layers
watergaspowerEACH LINE ON ITS OWN LAYER WITH DEPTH
  1. STEP 1Field finds logged
  2. STEP 2Layers set per utility
  3. STEP 3Attributes filled per line
  4. STEP 4Files checked and issued
1.5 LAKH+ KMGPR Survey Completed
58Company-Owned GPR Systems
23 YEARSUnderground Since 2003
₹24/MStandard GPR Rate · Min 4 km
Quick answer

GIS based utility mapping services turn a completed underground survey into files your team can work with: CAD drawings in DWG, GIS layers in SHP, KML for quick viewing and PDF sheets for circulation. Every mapped line carries its utility type, approximate depth, detection method, confidence and survey date. These sets are quoted separately from the per-metre survey rate.

Rates and page checked:

CAD plan of a road showing coloured buried cable and pipe lines
Each utility type sits on its own CAD layer with its own colour.
Separate map layers for power, water, sewer and telecom stacked together
GIS layers can be switched on or off by service, owner or confidence.
Printed survey report and drawing sheets laid out on a desk
PDF sheets travel with the report for site use and approvals.
Survey team reviewing field data beside radar equipment
The crew's field notes feed directly into the attribute table.

What do GIS based utility mapping services hand over?

A radar and EM survey ends with marks on the ground and a signed report. GIS based utility mapping services take the next step: they convert those findings into digital files that a designer, an asset owner or a drilling contractor can open, query and build on.

The fieldwork itself is described on our underground utility mapping page. This page covers only what you receive afterwards – the files, how they are organised and what information sits inside them. A typical deliverable set has four parts:

  • a CAD drawing for design and construction teams;
  • a GIS dataset for asset records and spatial analysis;
  • a KML file for quick review on a laptop or phone;
  • PDF sheets for printing, circulation and submissions.

Clients can order all four or only the formats they actually use.

Which file formats are supplied, and who uses each one?

FormatTypical userWhat it is good for
DWGDesign consultants, EPC engineering teamsPlacing a new cable, pipe or bore alignment between existing services
SHPUtility asset and GIS departmentsLoading into an asset register, filtering by attribute, joining with other network data
KMLProject managers, site supervisorsViewing lines over satellite imagery without CAD or GIS software
PDFApproving authorities, site crews, clients' managementFixed, printable sheets that cannot be altered by accident

The CAD release version and any other format a client's software needs are agreed when the order is placed, so files open first time.

How are the layers in a utility drawing organised?

Separating information into layers lets each user see only what matters to them. Our default structure is below; it is changed to the client's own layer standard whenever one is supplied.

  • Power – HT and Power – LT kept apart, with street-light cables on their own layer.
  • Telecom – copper cables and OFC ducts.
  • Water – mains and service connections.
  • Sewer and drainage – sewers, storm drains, culverts.
  • Gas and other pipelines.
  • Unidentified – reflections that show a buried object whose service type could not be confirmed.
  • Surface features – chambers, valve covers, poles, marker stones, kerbs.
  • Survey extent – the boundary actually scanned.
  • No-access areas – stretches that could not be covered, with the reason.
  • Verification points – trial pits or boreholes, where ordered.
  • Annotation – depth labels, notes and text, kept off the line layers so they can be hidden.

Keeping unidentified finds and no-access areas as layers of their own stops a blank space on the drawing from being read as empty ground.

What attribute fields does every mapped line carry?

In the GIS dataset, and as object data in the CAD file where the client wants it, each line or point holds a record. The core fields are:

FieldWhat it records
Utility typePower HT, power LT, telecom, water, sewer, gas or unidentified
OwnerThe service owner where known from records or markings; otherwise left as unknown
DepthApproximate depth to top of service at measured points, in metres
Detection methodGPR, EM, both, trial pit, or record only
ConfidenceHigh, medium or low, as judged by the surveyor
Survey dateThe date the line was scanned in the field
Size and materialFilled only where a trial pit exposed the service
RemarksAnything a later user should know, such as a line lost under a parked vehicle

Confidence and method can be mapped to a recognised grading scheme if your specification asks for it; see SUE quality levels explained.

How is an underground utility CAD drawing laid out?

An underground utility CAD drawing from us follows a predictable arrangement so a reader can find things quickly:

  1. Key plan showing the whole route or site and how the sheets divide it.
  2. Plan sheets with the detected services, surface features and depth labels.
  3. Crossing call-outs at road, rail, canal and drain crossings where services bunch together.
  4. Legend listing every layer colour and line style used.
  5. Notes and limitations – ground conditions, depth reach and the areas not covered.
  6. Title block with project name, survey date, revision number and the person responsible.

When an L-section survey has been ordered, the depth profile of detected services is supplied with the set; the L-section GPR survey page explains that service.

How are coordinates handled in the files?

A drawing is only reusable if its lines can be placed back on the ground later. The coordinate system – a project grid or a standard geographic system – is fixed with the client before drafting, and stated on every sheet and in the GIS metadata.

Surface features picked up during the survey, such as chambers and poles, are included so that a site crew can check the drawing against what they see. Positions of buried lines are survey estimates; the stated confidence on each line tells a designer how much clearance to allow.

How are CAD/GIS sets priced against the survey rate?

The survey and the drawing set are two separate items on our quotes. The survey follows the rate card: ₹24 a metre for a standard GPR survey and ₹32 a metre for an L-section survey, with a 4 km minimum order, a ₹1,00,000 project minimum outside Delhi NCR, whole-order discounts above 100, 500 and 1,000 km, and GST extra. Those per-metre rates do not cover drawings.

CAD/GIS work is then quoted on its own. The price depends on:

  • route length or site area to be drawn;
  • how many utility layers are present and how crowded the ground is;
  • how many formats are wanted;
  • whether the client's own template, layer names and attribute schema must be followed;
  • the number of review rounds expected.

Mobilisation, night working and traffic permissions are separate lines too. Full survey rates are on the GPR survey price list.

What should you send when ordering a drawing set?

  • Your CAD template or layer standard, if one exists.
  • The GIS attribute schema your asset system expects.
  • The coordinate system to be used.
  • Any base drawing, topographic survey or proposed alignment to overlay.
  • Software and version the end users will open the files in.
  • Who will review the draft and how comments will reach us.

For context on what a full survey handover contains beyond these files, read our guide to GPR survey deliverables. Larger city-scale datasets are discussed on the smart city underground mapping page.

How is a file set checked before it is issued?

Before handover, each set goes through a short checklist under our ISO 9001:2015 quality system:

  • every finding in the signed report appears on the drawing, and nothing appears that the report does not support;
  • attribute fields are filled for every line, with blanks only where the information genuinely does not exist;
  • files are opened in the target software to confirm layers, colours and coordinates load correctly;
  • KML lines are checked against imagery for obvious misplacement;
  • the revision number and date are updated on each sheet.

A draft goes to the client first. Comments are worked in and a final revision is issued.

STEP 1

Agree format and standard

Formats, CAD version, layer names, attribute schema and coordinate system are fixed before any drafting begins.

STEP 2

Survey on the ground

Radar and EM work is completed and marked, with field notes recording method and confidence for each line.

STEP 3

Build layers and attributes

Findings are drawn on separate utility layers, and each line is given its depth, method, confidence and date.

STEP 4

Issue a draft

Draft DWG, SHP, KML and PDF files go to your reviewer so comments arrive before the final revision.

STEP 5

Final set handed over

The revised files are issued with the signed report, revision number and survey date on every sheet.

Insights

CAD and GIS deliverables in numbers

Rate per metre by order size

Standard vs L-section GPR survey, ₹ per metre

StandardL-Section
₹0₹20₹40₹60₹80₹24₹32Up to 100 km₹18₹24100+ km₹14.4₹19.2500+ km₹12₹161,000+ km

Source: Mezux rate card, October 2026.

Cost of longer orders

Standard ₹24/m with whole-order slab, ₹ lakh before GST

₹0 L₹30 L₹60 L₹90 L₹120 L₹24 L100 km₹18.2 L101 km₹90 L500 km₹72.1 L501 km

Source: Mezux rate card – amounts before GST.

Our recorded output

Route surveyed, km

0 km300 km600 km900 km1200 km100 kmPeak day700 kmFastest 30 days

Source: Mezux delivery records.

Fact table

FactValueSource
Standard file formatsDWG, SHP, KML, PDFMezux records
Core attribute fields per line8, including depth, method, confidence, dateMezux records
Standard GPR survey rate₹24 per metre, drawings extraMezux rate card
L-section GPR survey rate₹32 per metreMezux rate card
Quality systemISO 9001:2015Mezux records

CAD/GIS drawing sets are always quoted as a separate item from the per-metre survey rate.

Best prices

Get GIS Based Utility Mapping at Best Prices

Pay only for formats used

If your team works only in CAD, order the DWG and PDF without paying for GIS layers you will never open.

One crew, one data chain

Our own crews survey and our own team drafts, so there is no second firm re-interpreting someone else's field notes.

Template set at the start

Agreeing your layer standard before drafting avoids paid rework once the files reach your design office.

Survey rate stays transparent

Metre rates of ₹24 standard or ₹32 L-section appear separately, so the drawing price is easy to compare.

Long routes, lower survey cost

Survey orders above 100 km earn 25% off every metre, rising to 40% beyond 500 km and 50% beyond 1,000 km.

Revisions agreed upfront

The quote states how many review rounds are covered, so late comments do not turn into surprise charges.

Latest price list

Survey rates behind a CAD/GIS set – October 2026

ServiceUp to 100 kmAbove 100 km
(25% off)
Above 500 km
(40% off)
Above 1,000 km
(50% off)
Standard GPR Survey
minimum 4 km
₹24/m₹18/m₹14.40/m₹12/m
L-Section GPR Survey
minimum 4 km
₹32/m₹24/m₹19.20/m₹16/m

Charged per running metre, before GST; the discount slab is decided by the total order and applies to all of it. Outside the Delhi NCR region the project minimum is ₹1,00,000. Separate from the per-metre rate: mobilisation, night shifts, traffic or permission arrangements and CAD/GIS drawings. Updated 23 October 2026.

Price range

Lowest rate₹12/mStandard, above 1,000 km
Highest rate₹32/mL-Section, up to 100 km
Minimum order4 km+ ₹1 lakh project minimum outside NCR
FAQ

Questions about CAD and GIS utility deliverables

Which AutoCAD version will the DWG be saved in?

Whichever version your team uses. We confirm it at the order stage and save the files to that release, so nobody in your office has to convert or upgrade before opening them. If several organisations will use the drawing, the oldest version among them is usually the safest choice.

Can the layers follow our company naming standard?

Yes. Send your layer list, colours and line types, or a template drawing, and the set is built to it from the start. Where a utility type in our survey has no matching layer in your standard, we propose a name and agree it with you before issue.

Will the SHP files load into our asset GIS?

Shapefiles are read by most GIS software, so loading itself is rarely a problem. Matching your attribute schema matters more. If you share the field names, types and allowed values your system expects, the dataset is prepared to that structure so it can be appended without manual clean-up.

How are unidentified finds shown?

They sit on a separate unidentified layer with their own symbol, depth estimate and remarks. Leaving them off would hide a possible service from the designer, while putting them on a power or water layer would claim more than the survey knows. A trial pit can resolve important ones on request.

Can a drawing set be prepared for a plot instead of a route?

Yes. Campus, yard and plot surveys are scanned on a grid, and the files show the site boundary, scanned extent and every detected service across the area. The layer structure and attribute fields stay the same, so plot data can later be combined with route data in one GIS.

What if new services are laid after our survey?

The files remain a record of the date they were surveyed. When new work is done, its as-built position can be added as a fresh layer or the area can be re-surveyed, and the survey date attribute keeps old and new information clearly separated. Any update is quoted as a separate job.

Get a quote

Ask for a CAD/GIS deliverable quote

What to send for an exact quote

  • The alignment as KML, drawing or road list
  • Town and type of site – public road, estate or plant
  • Whether the scope needs an L-section
  • Preferred start date and any night-only stretches
Standard GPR₹24/m
L-Section GPR₹32/m

Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.

What happens next

  1. Scope check – we confirm route length, crossings and L-section need.
  2. Written quote – rate, slab, minimums, extras and a day-by-day programme.
  3. Mobilisation – our own crew and systems on the agreed date.

Get a Quote

Route length, location and survey type – we reply with a written quote.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks