Article — GPR Survey Deliverables
GPR Survey Deliverables: CAD, GIS, L-Section, Report
Ground marks, a signed report, radargram extracts, an optional depth profile and CAD or GIS files: what each handover item is for, how to specify it, and how to keep it useful.
₹24/m standard₹32/m L-sectionMin 4 km · GST extra
- STEP 1Agree outputs before fieldwork
- STEP 2Scan and mark services
- STEP 3Compile report and profiles
- STEP 4Hand over, then archive
GPR survey deliverables are the outputs handed over after the radar and EM fieldwork: paint or peg marks on site, a signed survey report with positions, approximate depths and stated limits, selected radargram images, an L-section depth profile when ordered, and CAD drawings or GIS layers when the client asks for them as a separate item.
- GPR survey deliverables include ground marks, a signed report, radargram extracts, L-sections and optional CAD/GIS layers.
- Marks guide excavation for days; the signed report records positions, approximate depths, coverage and stated limits.
- An L-section depth profile is ordered at ₹32 per metre instead of the ₹24 standard rate.
- CAD drawings and GIS layers are a separate, quoted item, never part of the per-metre survey rate.
- A blank stretch in a report is not proof of empty ground; read coverage and depth reach notes.
Updated:

What are GPR survey deliverables?
When people talk about GPR survey deliverables, they mean everything the survey team hands over once scanning ends. The radar and electromagnetic (EM) passes themselves are only the means of utility detection; what the project team actually uses is the record of what was found, where, at roughly what depth, and how sure the surveyor is about it.
A complete handover usually has two halves:
- On site: marks on the ground that guide the excavation or drilling crew in the days that follow.
- On paper or screen: a report, and depending on the order, depth profiles, drawings or GIS data that designers, owners and future contractors can refer to long after the marks have faded.
The scope of these outputs should be fixed in the work order, not discussed for the first time after fieldwork. Agreeing it early decides how the crew records data while scanning.
Why do deliverables matter as much as the scan itself?
A well-run scan with a weak handover leaves the excavation crew guessing about the underground utilities in its path. Three practical reasons make the outputs important:
- Strike prevention. Marks and a findings table tell operators where to slow down, hand-dig or shift the alignment. Our note on utility mapping and strike prevention covers the cost side.
- Design decisions. A route designer cannot work from paint on a road. Positions referenced to the route, with depths, are what let an HDD bore or trench line be placed between existing services.
- Accountability. A signed report records what was surveyed, what was not, and the limits of the method. If something unexpected turns up later, that document shows what was known at the time.
Which types of deliverable can a GPR survey produce?
Ground marking
Paint lines, arrows or pegs in agreed utility colours, with approximate depth written alongside. Marks are short-lived by nature, so they suit work that starts soon after the survey.
Survey report
The core document. It lists each detected service with its position against the route or site, approximate depth at measured points, the detection method used, and notes on coverage and no-access stretches.
Radargram extracts
Selected radar profile images that show the radar signal reflections behind key findings. They help a reviewer see why a service was reported; our guide on reading a GPR radargram explains what those shapes mean.
L-section
A profile showing how deep each detected service lies over the length of the route. It is ordered as an L-section survey at ₹32 per metre instead of the ₹24 standard rate. The difference between the two is set out in L-section vs standard GPR survey.
CAD drawings and GIS layers
Findings drawn onto a route plan, or delivered as map layers with one layer per utility type. These are a separate, quoted item and never part of the per-metre survey rate.
Which terms should you understand before reading a deliverable?
- Approximate depth. Radar estimates depth from signal travel time, which depends on the soil's dielectric properties. Treat stated depths as estimates unless a trial pit has confirmed them; see how accurate GPR depth is.
- Depth reach. The penetration depth the radar actually achieved on a given stretch. Clay with high moisture content and salty soil raise signal attenuation and shorten it, whereas dry sand lets the signal travel further. A good report states it section by section.
- Confidence or quality level. A statement of how a service was identified – detected by radar only, traced with EM, or confirmed by exposure. The SUE quality levels explainer covers one widely used scheme.
- No-access area. A stretch the crew was unable to cover – parked vehicles, water, stored materials or a locked gate got in the way. Its absence from the findings means nothing was checked there, not that nothing exists.
- Unidentified anomaly. A reflection that looks like a buried object but cannot be tied to a known utility type.
How are survey deliverables produced, step by step?
- Scope agreed. The client confirms route length, whether an L-section is needed, and whether CAD or GIS output is wanted.
- Records gathered. Any existing utility plans, even partial ones, are collected so the crew knows where to look harder.
- Fieldwork. Radar lines run along the route with cross-lines at chambers, junctions and crossings; an EM cable locator follows metallic utilities.
- Marking. Findings are marked on the ground while the crew is still there.
- Processing. Radar data is reviewed, depths estimated and doubtful reflections flagged.
- Compilation. The report, any profiles and any drawings are prepared and checked against field notes.
- Handover. Signed documents and agreed files go to the client, who should check that every stretch is accounted for.
- Verification where needed. Trial pits or boreholes, on request, prove depth or identity at critical points.
What mistakes should you avoid when specifying deliverables?
- Leaving drawings unspecified. If the work order needs CAD or GIS output, say so in the enquiry. Adding it after fieldwork can mean re-checking field notes and delaying the handover.
- Assuming paint is the record. Marks fade under traffic and rain within days. Plan excavation close to the survey date and rely on the report afterwards.
- Ignoring stated limits. A blank stretch in a report is not proof of empty ground. Read the coverage and depth reach notes as carefully as the findings.
- Asking for an L-section everywhere. Depth profiles help where design depends on depth, such as crossings and crowded stretches. Elsewhere a standard survey may be enough.
- Mixing up route survey and fault locating. Finding a fault on a live cable is a different task, ordered separately.
How should GPR survey records be kept after handover?
Survey data loses value fast if it is filed and forgotten. Simple habits keep it useful:
- Store the signed report with the project's as-built records, not only in someone's email.
- Keep the original files alongside any PDF copy so a later designer can reuse the data.
- Note the survey date clearly; ground changes after every new excavation, so older findings need checking before reuse.
- Record which findings were later confirmed by excavation, which helps the next team judge confidence.
- Where GIS layers exist, keep each utility type as its own layer so updates can be made without redrawing the rest.
Where can you order these deliverables?
Mezux Touch runs route and site surveys with 58 company-owned GPR systems and in-house crews from Faridabad. Every survey comes with marking and a signed report; L-sections, CAD drawing sets and GIS layers are added when the order asks for them. Drawing and GIS work is described on our CAD and GIS utility mapping page, and all per-metre rates, minimums and discount slabs are listed in the GPR survey price list.
More guides on GPR survey methods
Questions about GPR survey deliverables
Is a CAD drawing included in the standard GPR survey rate?
No. The ₹24 per metre rate covers the scan, ground marking and the signed report. CAD drawing sets and GIS layers are prepared as a separate item and quoted on their own, so mention them in your enquiry if the client or consultant needs them.
Do I always need an L-section?
Not always. An L-section adds a depth profile of detected services along the route, which matters where a bore or trench must pass between existing lines. Many work orders specify it; where they do not, a standard survey with depths in the report may be enough. You can mix both on one order.
Why does the report say some stretches were not scanned?
Because something prevented access – parked vehicles, stacked material, standing water or a closed gate. An honest report lists these gaps so nobody assumes the ground there is clear. A return visit can be arranged once the obstruction is removed.
How reliable are the depths in a GPR report?
They are estimates based on how fast the signal travels in that soil. Accuracy varies with ground conditions and the size of the service. Where an exact depth is critical, a trial pit or borehole at that point gives a confirmed figure.
Can old survey data be reused for a new project?
It can guide planning, but treat it with care. Any excavation since the survey may have added, moved or removed services. Check the survey date and, for anything close to the new works, scan again before digging.
Who signs the survey report?
Our survey team signs the report for the work it carried out. The signature confirms what was scanned, the methods used and the limits stated, so the document can be relied on after the ground marks have gone.
GPR survey in cities across India
- Ground penetrating radar survey in Delhi
- Cable and pipe detection in Mumbai
- GPR survey in Bengaluru
- Chennai GPR survey
- GPR survey company in Hyderabad
- Underground utility survey in Kolkata
- Ground penetrating radar survey in Pune
- Cable and pipe detection in Ahmedabad
- GPR survey in Gurugram
- Noida GPR survey
- GPR survey company in Jaipur
- Underground utility survey in Lucknow
- Ground penetrating radar survey in Indore
- Cable and pipe detection in Bhopal
- GPR survey in Patna
- Chandigarh GPR survey
- GPR survey company in Nagpur
- Underground utility survey in Kochi
- Ground penetrating radar survey in Guwahati
- Cable and pipe detection in Bhubaneswar
Survey and mapping services
- Utility mapping & detection
- Buried cable locating
- GPR survey cost in India
- Pipe and cable locator services
- DISCOM cable network survey
- GPR scanning services
- Horizontal directional drilling
- Smart city utility survey
- GPR survey by sector
- HT/LT cable route GPR survey
- CGD utility survey
- Pre-excavation utility scanning
- Utility mapping for telecom operators
- Road-cutting permission support
- L-section GPR survey
- Cavity detection survey
- EPC utility survey support
- Subsurface utility engineering (SUE)
- Pre-drilling bore path scan
- Highway crossing survey
Tell us which deliverables you need
What to send for an exact quote
- The alignment as KML, drawing or road list
- Town and type of site – public road, estate or plant
- Whether the scope needs an L-section
- Preferred start date and any night-only stretches
Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.
What happens next
- Scope check – we confirm route length, crossings and L-section need.
- Written quote – rate, slab, minimums, extras and a day-by-day programme.
- Mobilisation – our own crew and systems on the agreed date.






