Skip to main content
ISO 9001:2015 · ISO 45001:2018

Underground Mapping — Smart City Projects

Underground Utility Mapping for Smart City Projects

A ground-truth picture of the services under city streets before roads are rebuilt, ducts are laid or a GIS base map is drawn – scanned on company-owned radar and recorded owner by owner.

₹24/m standard₹32/m L-sectionMin 4 km · GST extra

How it works · Building a street utility layer
watergaspowerEACH LINE ON ITS OWN LAYER WITH DEPTH
  1. STEP 1Streets split into zones
  2. STEP 2Radar and EM passes
  3. STEP 3Each owner's lines separated
  4. STEP 4Layers handed to planners
1.5 LAKH+ KMGPR Survey Completed
58Company-Owned GPR Systems
23 YEARSUnderground Since 2003
₹24/MStandard GPR Rate · Min 4 km
Quick answer

Underground mapping for smart city projects records the power, water, sewer, drainage, telecom and gas lines already under a street before it is redeveloped, ducted or added to a GIS base map. Mezux Touch does the scanning on owned radar and EM equipment for ₹24 a metre, or ₹32 including an L-section, from a 4 km minimum; GST extra.

Rates and page checked:

Mezux survey crew in safety vests standing beside radar carts
In-house crews, not hired operators, scan every zone of a city street programme.
Stacked digital map layers each showing a different buried utility type
A city base map is easier to maintain when each owner's network is its own layer.
Narrow old-town lane lined with shops above crowded buried services
Older wards pack the most services into the least width, so scan lines run closer.
Radar survey being carried out on a lit city road at night
Market roads are often scanned after hours; night working is quoted as its own item.

What is underground mapping for smart city projects?

Smart city programmes rebuild streets from kerb to kerb: wider footpaths, cycle tracks, new storm drains, common utility ducts, underground power, street lighting, signal and CCTV cabling. All of it has to fit into ground that already carries decades of services laid by different agencies. Underground mapping for smart city projects is the survey that shows what is down there before the redesign is fixed.

We do this with ground penetrating radar run along and across each street, electromagnetic locating for conductive lines, and surface marking of every detected service. Findings are recorded in a signed report, and where the project orders them, CAD or GIS drawing sets are prepared as a separate item. An L-section survey can add a depth profile of detected services along a corridor when the design needs depth in continuous form.

Typical clients are the bodies that plan or deliver city works – municipal corporations and development authorities, project SPVs, their project management consultants, and the contractors who build the packages. Mezux Touch is an independent survey company; we do not claim any smart city contract, and we work for whichever party places the order.

Why does a street redesign need a utility base map first?

A redesigned street changes where things go. Footpaths move outward, carriageways narrow, junctions are re-cut and new ducts take the space under the walkway. Every one of those moves can land on top of an existing service. Without a base map, the clash surfaces during construction, when a cable has to be diverted at short notice, the owner has to be called in and a stretch sits half-dug.

City records rarely prevent this on their own. Different owners keep their networks in different formats, at different levels of accuracy, and some services – old lighting cables, abandoned water lines, private connections – are recorded nowhere. A survey that covers every owner in the same pass gives designers one consistent picture to work from.

The base map also settles commercial questions early. It shows which services must be shifted, whose they are and roughly how much length is affected, so utility shifting can be costed and agreed with each owner before work orders are issued, instead of argued over after the road is opened.

A further benefit is sequencing. Once the base map shows where each owner's lines run, the city can schedule shifting work owner by owner ahead of the main road contractor, rather than holding a finished carriageway open while a late diversion is completed. The same record later helps the departments that issue road-cutting permissions, because an applicant's proposed trench can be checked against known services before the permission is granted.

Which services does a city street survey pick up?

The mix depends on the age and use of the street, but a city road commonly holds most of the following:

  • Power – HT and LT distribution cables, service cables to buildings, earthing runs;
  • Street lighting and signals – lighting feeders, traffic-signal and CCTV cables, often shallow and poorly recorded;
  • Water supply – trunk and distribution mains, service pipes, valve chambers;
  • Sewerage and drainage – sewers, manholes, storm drains and culverts;
  • Telecom – copper cables and OFC ducts from several operators;
  • Gas – steel and MDPE mains where a city gas network exists.

EM locating is most useful on live or traceable metal lines such as power and lighting cables. Radar responds to the contrast between an object and the soil, so it also picks up plastic pipes, empty ducts and chambers. Combining the two, and checking surface clues like manhole covers, valve boxes, junction pillars and marker posts, is what lets each detection be assigned to an owner. Lines that cannot be tied to any owner are reported as unidentified. Our overview of utility detection methods used in India compares these techniques in more depth.

How does a survey feed a city GIS base map?

The field survey produces positions and approximate depths; a GIS base map needs those findings tied to coordinates and organised so a city team can keep adding to them. When GIS or CAD drawing sets are ordered – always as a separately quoted item – they are typically built like this:

  1. One layer per owner and service type, so the water department can update its network without touching the power layer.
  2. Attributes on each feature: survey date, detection method, approximate depth and confidence, so later users know how far to trust each line.
  3. Coverage and gaps held as their own layer, showing where the radar could not scan and why.
  4. Format agreed in advance with the client's GIS team, including layer names and coordinate system.

Junctions and crowded plazas sometimes justify 3D or high-resolution radar instead of 2D lines; the article on 3D GPR versus 2D line survey explains when that extra effort pays off. For the drawing side, see our CAD and GIS utility mapping service.

How is a city survey organised around traffic and public access?

Urban survey is limited less by equipment than by access. Streets are planned zone by zone so that each crew works a manageable area with clear start and end points, and the order of zones follows the construction or design sequence.

  • Working hours. Busy market roads and arterial junctions are often scanned late at night or early in the morning. Night-shift working is charged separately.
  • Traffic arrangements. Barricading, diversions and permissions are arranged with the traffic police or road owner through the client, and are billed outside the survey rate.
  • Footpaths and lanes. Hand-pushed radar carts work on footpaths and in narrow lanes where vehicles cannot go.
  • Parked vehicles and stalls. Areas blocked on the day are recorded as no-access in the report and can be revisited by arrangement.

Because the 58 radar systems we deploy are company-owned, several crews can work different zones of a city at once when the programme is tight.

Which survey scopes suit different smart city works?

Not every package needs the same depth of survey. Matching the scope to the work keeps cost in proportion:

City workSuggested scope
Road and footpath redevelopmentStandard GPR survey of the full corridor, closer lines at junctions
Common utility duct or new cable corridorCorridor survey with L-section where depth clearance matters
Junction redesign, plazasDense grid or 3D scanning over the redesigned area
City-wide GIS base mapStandard survey by zone, with GIS drawing sets ordered separately
Sinkhole or settlement complaintsRoad void survey, scoped on its own

For dedicated duct and cable corridors, our utility corridor mapping page covers the corridor-specific scope, and voids under carriageways are handled under our pavement and road void survey. Trial pits or boreholes can be added on request where a key depth must be proved.

What does smart city utility mapping in India cost?

Pricing follows the length of street scanned. The standard GPR survey is ₹24 a metre and the L-section survey ₹32 a metre. No order is charged for less than 4 km, and a project beyond Delhi NCR carries a ₹1,00,000 floor as well. GST is charged in addition. Long, city-wide programmes benefit from slab discounts applied to the full order: 25% above 100 km, 40% above 500 km, 50% above 1,000 km.

Example programmeSurveyBefore GST
18 km of ward roads in Delhi NCRStandard₹4,32,000
40 km duct corridor outside NCRL-section₹12,80,000
320 km city-wide base mapStandard, 25% slab₹57,60,000
650 km multi-zone programmeStandard, 40% slab₹93,60,000

Mobilisation, night shifts, traffic arrangements and permissions, and GIS or CAD drawing sets are quoted on their own lines and are not part of these figures. Full slab details are on our GPR survey price list.

STEP 1

Define the street zones

Share the project area, street list or KML, and the redesign drawings, so zones can follow your construction sequence.

STEP 2

Collect owners' records

Whatever records the city and service owners hold are gathered first, to show where to look hardest on site.

STEP 3

Scan zone by zone

Radar lines and EM tracing cover carriageways, footpaths and junctions, with no-access spots logged as they occur.

STEP 4

Mark and attribute finds

Each detected line is painted on the ground and assigned to an owner where evidence allows, otherwise flagged unidentified.

STEP 5

Hand over the record

A signed report per zone goes to the client, with GIS or CAD layers delivered too when ordered separately.

Insights

Smart city underground mapping in numbers

Rate per metre by order size

Standard vs L-section GPR survey, ₹ per metre

StandardL-Section
₹0₹20₹40₹60₹80₹24₹32Up to 100 km₹18₹24100+ km₹14.4₹19.2500+ km₹12₹161,000+ km

Source: Mezux rate card, October 2026.

Cost of longer orders

Standard ₹24/m with whole-order slab, ₹ lakh before GST

₹0 L₹30 L₹60 L₹90 L₹120 L₹24 L100 km₹18.2 L101 km₹90 L500 km₹72.1 L501 km

Source: Mezux rate card – amounts before GST.

Our recorded output

Route surveyed, km

0 km300 km600 km900 km1200 km100 kmPeak day700 kmFastest 30 days

Source: Mezux delivery records.

Fact table

FactValueSource
Standard GPR survey₹24 per metreMezux rate card
L-section GPR survey₹32 per metreMezux rate card
Discount above 500 km40% on every metreMezux rate card
Company-owned GPR systems58Mezux records
Survey work since2003Mezux records

We survey independently and hold no smart city contract that we claim here; rates exclude GST and separately quoted items.

Best prices

Get Underground Mapping for Smart City Projects at Best Prices

Street length, not hours

Every zone is charged by metres scanned – ₹24 standard, ₹32 with L-section – so city budgets can be set from the street list.

City-wide slabs

Adding all zones to one order lets the total reach the 100 km, 500 km or 1,000 km slab and lowers every metre.

One pass for all owners

Power, water, sewer, telecom and gas are mapped together, so the city is not paying separate surveys for each network.

Depth profiles only on corridors

L-section pricing can be limited to duct and cable corridors, while ordinary street zones stay at the standard rate.

Several crews, own systems

Owning 58 radar systems lets us put parallel crews on a city without hire charges inflating the rate.

Extras priced in the open

Night working, traffic arrangements, mobilisation and GIS layers appear on the quote as separate, checkable lines.

Latest price list

GPR survey rates for city utility mapping – October 2026

ServiceUp to 100 kmAbove 100 km
(25% off)
Above 500 km
(40% off)
Above 1,000 km
(50% off)
Standard GPR Survey
minimum 4 km
₹24/m₹18/m₹14.40/m₹12/m
L-Section GPR Survey
minimum 4 km
₹32/m₹24/m₹19.20/m₹16/m

Charged per running metre, before GST; the discount slab is decided by the total order and applies to all of it. Outside the Delhi NCR region the project minimum is ₹1,00,000. Mobilisation, night working, traffic and permission arrangements and drawing sets (CAD/GIS) are listed separately in the quote. Updated 23 October 2026.

Price range

Lowest rate₹12/mStandard, above 1,000 km
Highest rate₹32/mL-Section, up to 100 km
Minimum order4 km+ ₹1 lakh project minimum outside NCR
FAQ

Questions about smart city underground mapping

Can a city SPV or municipal corporation order the survey directly?

Yes. We take orders from public bodies, their project management consultants and the contractors delivering city works. Whoever places the order receives the report and any drawing sets. We are an independent survey company and do not claim any existing smart city contract.

Can you scan narrow lanes in the old parts of a city?

Usually, yes. Hand-pushed radar carts and handheld EM locators fit footpaths and lanes that vehicles cannot enter. Very tight or blocked spots are logged as no-access in the report, and lanes with heavy daytime footfall can be scanned early in the morning or at night.

Are GIS layers part of the per-metre rate?

No. The metre rate covers scanning, ground marking and the signed report. GIS or CAD drawing sets in the city's own format are prepared on request and quoted as a separate item, depending on the layers and attributes required.

Can a recently rebuilt road still be surveyed?

Yes, though fresh backfill and disturbed layers can scatter the radar signal and make readings less clear. Such stretches are noted in the report with their confidence level. Where a key depth under new paving matters, a trial pit at that point can be arranged on request.

Will the survey disrupt traffic or shops?

Scanning is non-intrusive and moves along the street, so disruption is limited to a small working area at a time. Busy stretches can be done at night. Barricading and permissions are arranged with the authority through the client and are charged outside the survey rate.

Can you also check for voids under city roads?

Yes, as a separate scope. Road void survey looks for cavities and loose ground beneath the pavement, often after sinkhole or settlement complaints, and is planned and quoted apart from utility mapping, though both can be done in the same mobilisation.

Get a quote

Send your city street programme

What to send for an exact quote

  • The alignment as KML, drawing or road list
  • Town and type of site – public road, estate or plant
  • Whether the scope needs an L-section
  • Preferred start date and any night-only stretches
Standard GPR₹24/m
L-Section GPR₹32/m

Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.

What happens next

  1. Scope check – we confirm route length, crossings and L-section need.
  2. Written quote – rate, slab, minimums, extras and a day-by-day programme.
  3. Mobilisation – our own crew and systems on the agreed date.

Get a Quote

Route length, location and survey type – we reply with a written quote.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks