Pre-Excavation Utility Scanning
Pre-Excavation Underground Scanning & Utility Strike Prevention
Before a trench, pit, pile or road cut opens, our crews scan the dig zone with radar and EM locators and mark every buried cable and pipe found inside it.
₹24/m standard₹32/m L-sectionMin 4 km · GST extra
- STEP 1Dig zone and buffer fixed
- STEP 2EM sweep, then radar
- STEP 3Finds painted on surface
- STEP 4Report handed to site
Pre-excavation underground scanning services check the exact patch of ground about to be dug – a trench line, pit, pile position or road cut – for live cables, pipes, ducts and voids, then mark them on the surface. Mezux Touch does this with its own radar and EM equipment at ₹24 per metre, subject to minimums, with GST extra.
Rates and page checked:

What are pre-excavation underground scanning services?
They are a short, focused survey of the ground that is about to be opened. Instead of mapping a whole corridor for design, the crew looks only at the dig zone – the trench line, pit, pile cap or road cut – plus a working margin around it, and answers one question: what could the excavation hit?
Mezux Touch provides pre-excavation underground scanning services with company-owned GPR systems and EM locators, run by our own crews. A typical job delivers three things:
- Surface marks painted or pegged over every service found inside the zone, with approximate depth noted beside each mark.
- A clear-zone statement showing which parts of the footprint showed no services, and which could not be scanned.
- A signed report listing each find, the method that detected it and the confidence attached to it.
The aim is practical. The excavator operator and the site supervisor should be able to look at the ground and know where machine digging is reasonable and where hands and hand tools must take over.
Which kinds of excavation should be scanned first?
Any cut in ground that holds services carries strike risk, but some excavations meet buried lines far more often than others. The table below shows where we usually start.
| Excavation | What it often meets | How the zone is scanned |
|---|---|---|
| Road cutting for cable or duct | Power cables, water mains, telecom ducts, gas lines | Continuous lines along the cut, cross-lines at every junction |
| HDD entry and exit pits | Services along the road edge and at the crossing point | Close grid over each pit plus the bore path between them |
| Pole, earthing and plinth pits | LT cables, street-light feeders, house connections | Small grid centred on the pit with a margin around it |
| Pile caps and foundation pits | Old footings, chambers, abandoned lines | Grid at each pile or footing location |
| Drain and boundary-wall trenches | Incoming plot connections, sewers, storm drains | Strip scan along the full trench length |
For whole plots before setting out, our construction site GPR survey is the better fit, and planned bores are covered by the HDD route survey.
How does a utility strike prevention survey run on the day?
A utility strike prevention survey follows a fixed sequence, so nothing depends on one operator's memory:
- Walk the zone. The crew notes every surface clue – valve covers, chambers, poles, feeder pillars, marker stones, patched road strips and cable risers – because each one hints at what lies below.
- Sweep with the EM locator. A passive sweep picks up cables carrying current. Where the client can give access at a pillar, chamber or exposed end, we apply a signal and trace that specific line.
- Run radar lines. GPR covers the full footprint and margin in parallel lines, then across them, picking up plastic pipes, ducts and drains that EM cannot detect.
- Compare and resolve. Radar and EM results are checked against each other, and any reflection that does not fit is rescanned before it is marked.
- Mark and brief. Finds are painted in the colour code agreed with the client, depths are written alongside, and the supervisor is walked through the marks before the crew leaves.
The difference between the two instruments is explained in our article on EM cable locators versus GPR.
What does an underground hazard detection survey look for besides cables?
Live services are the obvious danger, but they are not the only thing that stops a dig. An underground hazard detection survey also reports:
- Gas pipelines, which carry the gravest consequence if struck; steel lines respond to EM, while polyethylene pipes rely on radar and sometimes on a tracer wire.
- Voids and soft pockets under a road or footpath, often left by leaking pipes or washed-out backfill, which can collapse when a machine stands over them. Our void detection service deals with these in more depth.
- Abandoned lines that may not be abandoned at all – a cable thought dead can still be fed from another end.
- Buried chambers and old foundations that stall a trench or deflect a pile.
- Earthing strips and rods close to substations and poles.
Each is listed with its own note, so the site team can treat a void differently from a cable.
Where does scanning stop and hand digging take over?
Radar and EM give approximate positions and depths, not millimetre answers. Signal reach falls in wet clay and saline ground and improves in dry sandy soil, and very small or deep lines can be faint. A responsible pre-dig scan therefore ends with a clear handover:
- Near any mark, the crew should expose the service by hand or with hand tools before a bucket goes in, within whatever safe distance your own safety rules set.
- Where the report gives low confidence for a line, treat the whole uncertain band as occupied.
- If the alignment shifts after the scan, the new stretch should be scanned before it is dug.
- When a depth has to be proved, trial pits or boreholes can be ordered at the critical points.
Why this discipline matters, and how strikes usually happen despite drawings, is discussed in our blog on utility mapping and strike prevention.
How is pre-excavation scanning priced?
Scanning is charged by the metre of radar line run over the dig zones. The standard rate is ₹24 per metre; where a depth profile of the detected services along a trench is required as an L-section, the rate is ₹32 per metre. An order is never billed for less than 4 km. Inside Delhi NCR that is the only minimum; elsewhere, each project also carries a ₹1,00,000 minimum bill. GST is added to the total.
- 25 km of road cutting in Delhi NCR, standard: ₹6,00,000 before GST.
- 2 km of trench outside NCR: billed as 4 km (₹96,000), then raised to the ₹1,00,000 project minimum.
- 10 km trench with L-section: ₹3,20,000 before GST.
- 150 km of duct cutting in one programme: 25% off every metre, so ₹27,00,000 before GST.
Orders above 500 km get 40% off and above 1,000 km get 50% off, applied to the whole length. Each of these sits outside the metre rate and is quoted on its own: mobilisation, night-shift working, traffic arrangements or permits, and CAD/GIS drawings. Many small pits across a city can be grouped into one order so they clear the minimum together. Check any length against the slabs with the calculator on our GPR survey price list.
Why do contractors book pre-dig scans with Mezux Touch?
Excavation programmes move fast, and a scan that arrives late is no use. We have been doing this work since 2003 and keep the capacity in-house:
- 58 company-owned GPR systems and 18 HDD rigs, with no hired machines and no sub-letting – see our owned machinery.
- 1.5 lakh+ km of GPR survey completed across 28+ States and UTs, with peak output of 100 km a day on open corridors using day and night shifts.
- ISO 45001:2018 for occupational health and safety, alongside ISO 9001:2015 and ISO 14001:2015.
- Crews and systems mobilise from Faridabad, so road-cutting programmes in NCR and other states can be covered by the same team.
For a quote, send the dig locations and dates to kumar@mezux.in or ring +91 99100 10209.
Guides on safe digging and utility detection
Pre-excavation scanning in numbers
Rate per metre by order size
Standard vs L-section GPR survey, ₹ per metre
Source: Mezux rate card, October 2026.
L-section survey cost for typical orders
L-section ₹32/m, ₹ lakh before GST, slab applied
Source: Mezux rate card – amounts before GST.
Our recorded output
Route surveyed, km
Source: Mezux delivery records.
Fact table
| Fact | Value | Source |
|---|---|---|
| Standard scanning rate | ₹24 per metre | Mezux rate card |
| Scan with L-section depth profile | ₹32 per metre | Mezux rate card |
| Minimum order | 4 km (₹1,00,000 per project outside Delhi NCR) | Mezux rate card |
| Company-owned GPR systems | 58 | Mezux records |
| Peak survey output | 100 km a day | Mezux records |
Separate quotes apply to mobilisation, night work, traffic management and CAD/GIS sets; GST is charged on top.
Get Pre-Excavation Utility Scanning at Best Prices
Pay only for scanned metres
The bill follows the metres of radar line run over your dig zones at ₹24 each, with no separate day rate.
Combine scattered pits
Pole, earthing and plinth pits spread across a town can be ordered together, so the 4 km minimum is shared.
L-section only on chosen trenches
Order the ₹32 per metre depth profile just for trenches where the work order demands it, and standard scanning elsewhere.
Programme slabs on full length
Road-cutting programmes past 100 km earn 25% off every metre, rising to 40% beyond 500 km and to half beyond 1,000 km.
Avoid repeat visits
Fixing all dig zones before mobilisation lets one crew visit cover them, instead of paying travel again for each pit.
Every extra shown in advance
Night shifts, traffic arrangements, permissions and drawing sets are listed on the quote as separate items before the order is placed.
Pre-excavation scanning rates – October 2026
| Service | Up to 100 km | Above 100 km (25% off) | Above 500 km (40% off) | Above 1,000 km (50% off) |
|---|---|---|---|---|
| Standard GPR Survey minimum 4 km | ₹24/m | ₹18/m | ₹14.40/m | ₹12/m |
| L-Section GPR Survey minimum 4 km | ₹32/m | ₹24/m | ₹19.20/m | ₹16/m |
All rates are per metre of route surveyed and before GST. Once an order passes a slab, the lower rate applies to every metre of it. Sites outside Delhi NCR also carry a ₹1,00,000 project minimum. Mobilisation, night working, traffic and permission arrangements and drawing sets (CAD/GIS) are listed separately in the quote. Updated 23 October 2026.
Price range
Questions about pre-excavation utility scanning
How wide a strip should be scanned around a trench?
Enough to cover the trench, the spoil and machine working area, and some room for the alignment to move. We agree the margin with your engineer before the visit; it is usually wider at crossings, gates and chambers, where services turn or branch, than along a plain stretch of verge.
Who arranges permission to scan on a public road?
The project owner or contractor, since it already holds or applies for the road-cutting permission. Our crew works within that permission and the traffic arrangements it requires. Traffic management and any permission costs are charged separately from the per-metre scanning rate and are shown as their own lines on the quote.
Do you scan the entry and exit pits for an HDD bore?
Yes. Each pit is scanned on a close grid as its own dig zone, and the bore path between them is scanned along its length as far as access allows. Pits are where machines dig deepest and fastest, so they deserve as much attention as the crossing itself.
Will the scan find polyethylene gas pipes?
Radar can usually detect polyethylene pipes because they contrast with the soil around them, though small or deep ones in wet clay may be faint. If a tracer wire was laid with the pipe, EM locating can follow it. Gas lines are flagged prominently in the report given the consequences of a strike.
What happens if the trench alignment changes after the scan?
The new stretch needs scanning before it is dug. Marks only describe the ground that was covered, and a shift of even a few metres can move the cut onto a service we never looked at. Tell us early and we can add the revised section to an ongoing visit.
Can scanning and excavation happen on the same day?
They can, as long as the scan finishes and the marks are briefed before digging starts in that zone. On long programmes we often work a few stretches ahead of the excavation crew, so scanning never holds up the machine and the marks are always fresh when it arrives.
Pre-dig scanning in cities we cover
- Delhi GPR survey
- GPR survey company in Mumbai
- Underground utility survey in Bengaluru
- Ground penetrating radar survey in Chennai
- Cable and pipe detection in Hyderabad
- GPR survey in Kolkata
- Pune GPR survey
- GPR survey company in Ahmedabad
- Underground utility survey in Gurugram
- Ground penetrating radar survey in Noida
- Cable and pipe detection in Jaipur
- GPR survey in Lucknow
- Indore GPR survey
- GPR survey company in Bhopal
- Underground utility survey in Patna
- Ground penetrating radar survey in Chandigarh
- Cable and pipe detection in Nagpur
- GPR survey in Kochi
- Guwahati GPR survey
- GPR survey company in Bhubaneswar
Related survey and underground services
- GPR scanning along routes and sites
- Road-cutting permission support
- Road & highway GPR survey
- Expressway utility survey
- Electric cable route survey
- GPR mapping for electrical utilities
- Pre-drilling bore path scan
- Water main leak survey
- Utility corridor mapping
- How GPR survey is priced
- Telecom route survey
- Pavement & road void survey
- Underground mapping for smart cities
- Buried cable locating
- L-section GPR survey
- Pipe and cable locator services
- GPR survey for every sector
- GPR survey for EPC contractors
- Telecom duct route feasibility survey
- OFC laying works
Send your dig locations for a scanning quote
What to send for an exact quote
- The alignment as KML, drawing or road list
- Town and type of site – public road, estate or plant
- Whether the scope needs an L-section
- Preferred start date and any night-only stretches
Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.
What happens next
- Scope check – we confirm route length, crossings and L-section need.
- Written quote – rate, slab, minimums, extras and a day-by-day programme.
- Mobilisation – our own crew and systems on the agreed date.