Pre-Excavation Utility Scanning

Pre-Excavation Underground Scanning & Utility Strike Prevention

Before a trench, pit, pile or road cut opens, our crews scan the dig zone with radar and EM locators and mark every buried cable and pipe found inside it.

₹24/m standard₹32/m L-sectionMin 4 km · GST extra

How it works · Clearing a dig zone
HT cableWater mainOFC ductGas lineRADARGRAM
  1. STEP 1Dig zone and buffer fixed
  2. STEP 2EM sweep, then radar
  3. STEP 3Finds painted on surface
  4. STEP 4Report handed to site
1.5 LAKH+ KMGPR Survey Completed
58Company-Owned GPR Systems
23 YEARSUnderground Since 2003
₹24/MStandard GPR Rate · Min 4 km
Quick answer

Pre-excavation underground scanning services check the exact patch of ground about to be dug – a trench line, pit, pile position or road cut – for live cables, pipes, ducts and voids, then mark them on the surface. Mezux Touch does this with its own radar and EM equipment at ₹24 per metre, subject to minimums, with GST extra.

Rates and page checked:

Ground penetrating radar cart being pushed along a road edge before trenching
The radar cart covers the planned cut and a margin on each side of it.
Radargram screen showing curved reflections from buried pipes and cables
Each curved reflection on the radargram is checked before a mark is painted.
Cross-section of a drilling bore passing under a road between two pits
Entry and exit pits for a bore are scanned as their own dig zones.
Workers digging carefully by hand near a marked buried service line
Close to a painted mark, digging by hand replaces the machine bucket.

What are pre-excavation underground scanning services?

They are a short, focused survey of the ground that is about to be opened. Instead of mapping a whole corridor for design, the crew looks only at the dig zone – the trench line, pit, pile cap or road cut – plus a working margin around it, and answers one question: what could the excavation hit?

Mezux Touch provides pre-excavation underground scanning services with company-owned GPR systems and EM locators, run by our own crews. A typical job delivers three things:

  1. Surface marks painted or pegged over every service found inside the zone, with approximate depth noted beside each mark.
  2. A clear-zone statement showing which parts of the footprint showed no services, and which could not be scanned.
  3. A signed report listing each find, the method that detected it and the confidence attached to it.

The aim is practical. The excavator operator and the site supervisor should be able to look at the ground and know where machine digging is reasonable and where hands and hand tools must take over.

Which kinds of excavation should be scanned first?

Any cut in ground that holds services carries strike risk, but some excavations meet buried lines far more often than others. The table below shows where we usually start.

ExcavationWhat it often meetsHow the zone is scanned
Road cutting for cable or ductPower cables, water mains, telecom ducts, gas linesContinuous lines along the cut, cross-lines at every junction
HDD entry and exit pitsServices along the road edge and at the crossing pointClose grid over each pit plus the bore path between them
Pole, earthing and plinth pitsLT cables, street-light feeders, house connectionsSmall grid centred on the pit with a margin around it
Pile caps and foundation pitsOld footings, chambers, abandoned linesGrid at each pile or footing location
Drain and boundary-wall trenchesIncoming plot connections, sewers, storm drainsStrip scan along the full trench length

For whole plots before setting out, our construction site GPR survey is the better fit, and planned bores are covered by the HDD route survey.

How does a utility strike prevention survey run on the day?

A utility strike prevention survey follows a fixed sequence, so nothing depends on one operator's memory:

  1. Walk the zone. The crew notes every surface clue – valve covers, chambers, poles, feeder pillars, marker stones, patched road strips and cable risers – because each one hints at what lies below.
  2. Sweep with the EM locator. A passive sweep picks up cables carrying current. Where the client can give access at a pillar, chamber or exposed end, we apply a signal and trace that specific line.
  3. Run radar lines. GPR covers the full footprint and margin in parallel lines, then across them, picking up plastic pipes, ducts and drains that EM cannot detect.
  4. Compare and resolve. Radar and EM results are checked against each other, and any reflection that does not fit is rescanned before it is marked.
  5. Mark and brief. Finds are painted in the colour code agreed with the client, depths are written alongside, and the supervisor is walked through the marks before the crew leaves.

The difference between the two instruments is explained in our article on EM cable locators versus GPR.

What does an underground hazard detection survey look for besides cables?

Live services are the obvious danger, but they are not the only thing that stops a dig. An underground hazard detection survey also reports:

  • Gas pipelines, which carry the gravest consequence if struck; steel lines respond to EM, while polyethylene pipes rely on radar and sometimes on a tracer wire.
  • Voids and soft pockets under a road or footpath, often left by leaking pipes or washed-out backfill, which can collapse when a machine stands over them. Our void detection service deals with these in more depth.
  • Abandoned lines that may not be abandoned at all – a cable thought dead can still be fed from another end.
  • Buried chambers and old foundations that stall a trench or deflect a pile.
  • Earthing strips and rods close to substations and poles.

Each is listed with its own note, so the site team can treat a void differently from a cable.

Where does scanning stop and hand digging take over?

Radar and EM give approximate positions and depths, not millimetre answers. Signal reach falls in wet clay and saline ground and improves in dry sandy soil, and very small or deep lines can be faint. A responsible pre-dig scan therefore ends with a clear handover:

  • Near any mark, the crew should expose the service by hand or with hand tools before a bucket goes in, within whatever safe distance your own safety rules set.
  • Where the report gives low confidence for a line, treat the whole uncertain band as occupied.
  • If the alignment shifts after the scan, the new stretch should be scanned before it is dug.
  • When a depth has to be proved, trial pits or boreholes can be ordered at the critical points.

Why this discipline matters, and how strikes usually happen despite drawings, is discussed in our blog on utility mapping and strike prevention.

How is pre-excavation scanning priced?

Scanning is charged by the metre of radar line run over the dig zones. The standard rate is ₹24 per metre; where a depth profile of the detected services along a trench is required as an L-section, the rate is ₹32 per metre. An order is never billed for less than 4 km. Inside Delhi NCR that is the only minimum; elsewhere, each project also carries a ₹1,00,000 minimum bill. GST is added to the total.

  • 25 km of road cutting in Delhi NCR, standard: ₹6,00,000 before GST.
  • 2 km of trench outside NCR: billed as 4 km (₹96,000), then raised to the ₹1,00,000 project minimum.
  • 10 km trench with L-section: ₹3,20,000 before GST.
  • 150 km of duct cutting in one programme: 25% off every metre, so ₹27,00,000 before GST.

Orders above 500 km get 40% off and above 1,000 km get 50% off, applied to the whole length. Each of these sits outside the metre rate and is quoted on its own: mobilisation, night-shift working, traffic arrangements or permits, and CAD/GIS drawings. Many small pits across a city can be grouped into one order so they clear the minimum together. Check any length against the slabs with the calculator on our GPR survey price list.

Why do contractors book pre-dig scans with Mezux Touch?

Excavation programmes move fast, and a scan that arrives late is no use. We have been doing this work since 2003 and keep the capacity in-house:

  • 58 company-owned GPR systems and 18 HDD rigs, with no hired machines and no sub-letting – see our owned machinery.
  • 1.5 lakh+ km of GPR survey completed across 28+ States and UTs, with peak output of 100 km a day on open corridors using day and night shifts.
  • ISO 45001:2018 for occupational health and safety, alongside ISO 9001:2015 and ISO 14001:2015.
  • Crews and systems mobilise from Faridabad, so road-cutting programmes in NCR and other states can be covered by the same team.

For a quote, send the dig locations and dates to kumar@mezux.in or ring +91 99100 10209.

TIP 1

Define every dig zone

List each trench, pit and pile location with its size, so the crew scans the right ground and a sensible margin.

TIP 2

Scan close to digging

Book the scan for the days just before excavation, because paint fades and other works can change the ground.

TIP 3

Share surface clues

Point out pillars, chambers, valve boxes and old cable markers you know about, since each one helps the EM sweep.

TIP 4

Group small pits

Collect pole pits, earthing pits and short cuts across a city into one order so they clear the minimum together.

TIP 5

Brief the operators

Walk excavator drivers and helpers through the painted marks before the shift, not after the first bucket is lifted.

Insights

Pre-excavation scanning in numbers

Rate per metre by order size

Standard vs L-section GPR survey, ₹ per metre

StandardL-Section
₹0₹20₹40₹60₹80₹24₹32Up to 100 km₹18₹24100+ km₹14.4₹19.2500+ km₹12₹161,000+ km

Source: Mezux rate card, October 2026.

L-section survey cost for typical orders

L-section ₹32/m, ₹ lakh before GST, slab applied

₹0 L₹40 L₹80 L₹120 L₹160 L₹3.2 L10 km₹16 L50 km₹36 L150 km₹115.2 L600 km

Source: Mezux rate card – amounts before GST.

Our recorded output

Route surveyed, km

0 km300 km600 km900 km1200 km100 kmPeak day700 kmFastest 30 days

Source: Mezux delivery records.

Fact table

FactValueSource
Standard scanning rate₹24 per metreMezux rate card
Scan with L-section depth profile₹32 per metreMezux rate card
Minimum order4 km (₹1,00,000 per project outside Delhi NCR)Mezux rate card
Company-owned GPR systems58Mezux records
Peak survey output100 km a dayMezux records

Separate quotes apply to mobilisation, night work, traffic management and CAD/GIS sets; GST is charged on top.

Best prices

Get Pre-Excavation Utility Scanning at Best Prices

Pay only for scanned metres

The bill follows the metres of radar line run over your dig zones at ₹24 each, with no separate day rate.

Combine scattered pits

Pole, earthing and plinth pits spread across a town can be ordered together, so the 4 km minimum is shared.

L-section only on chosen trenches

Order the ₹32 per metre depth profile just for trenches where the work order demands it, and standard scanning elsewhere.

Programme slabs on full length

Road-cutting programmes past 100 km earn 25% off every metre, rising to 40% beyond 500 km and to half beyond 1,000 km.

Avoid repeat visits

Fixing all dig zones before mobilisation lets one crew visit cover them, instead of paying travel again for each pit.

Every extra shown in advance

Night shifts, traffic arrangements, permissions and drawing sets are listed on the quote as separate items before the order is placed.

Latest price list

Pre-excavation scanning rates – October 2026

ServiceUp to 100 kmAbove 100 km
(25% off)
Above 500 km
(40% off)
Above 1,000 km
(50% off)
Standard GPR Survey
minimum 4 km
₹24/m₹18/m₹14.40/m₹12/m
L-Section GPR Survey
minimum 4 km
₹32/m₹24/m₹19.20/m₹16/m

All rates are per metre of route surveyed and before GST. Once an order passes a slab, the lower rate applies to every metre of it. Sites outside Delhi NCR also carry a ₹1,00,000 project minimum. Mobilisation, night working, traffic and permission arrangements and drawing sets (CAD/GIS) are listed separately in the quote. Updated 23 October 2026.

Price range

Lowest rate₹12/mStandard, above 1,000 km
Highest rate₹32/mL-Section, up to 100 km
Minimum order4 km+ ₹1 lakh project minimum outside NCR
FAQ

Questions about pre-excavation utility scanning

How wide a strip should be scanned around a trench?

Enough to cover the trench, the spoil and machine working area, and some room for the alignment to move. We agree the margin with your engineer before the visit; it is usually wider at crossings, gates and chambers, where services turn or branch, than along a plain stretch of verge.

Who arranges permission to scan on a public road?

The project owner or contractor, since it already holds or applies for the road-cutting permission. Our crew works within that permission and the traffic arrangements it requires. Traffic management and any permission costs are charged separately from the per-metre scanning rate and are shown as their own lines on the quote.

Do you scan the entry and exit pits for an HDD bore?

Yes. Each pit is scanned on a close grid as its own dig zone, and the bore path between them is scanned along its length as far as access allows. Pits are where machines dig deepest and fastest, so they deserve as much attention as the crossing itself.

Will the scan find polyethylene gas pipes?

Radar can usually detect polyethylene pipes because they contrast with the soil around them, though small or deep ones in wet clay may be faint. If a tracer wire was laid with the pipe, EM locating can follow it. Gas lines are flagged prominently in the report given the consequences of a strike.

What happens if the trench alignment changes after the scan?

The new stretch needs scanning before it is dug. Marks only describe the ground that was covered, and a shift of even a few metres can move the cut onto a service we never looked at. Tell us early and we can add the revised section to an ongoing visit.

Can scanning and excavation happen on the same day?

They can, as long as the scan finishes and the marks are briefed before digging starts in that zone. On long programmes we often work a few stretches ahead of the excavation crew, so scanning never holds up the machine and the marks are always fresh when it arrives.

Get a quote

Send your dig locations for a scanning quote

What to send for an exact quote

  • The alignment as KML, drawing or road list
  • Town and type of site – public road, estate or plant
  • Whether the scope needs an L-section
  • Preferred start date and any night-only stretches
Standard GPR₹24/m
L-Section GPR₹32/m

Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.

What happens next

  1. Scope check – we confirm route length, crossings and L-section need.
  2. Written quote – rate, slab, minimums, extras and a day-by-day programme.
  3. Mobilisation – our own crew and systems on the agreed date.

Get a Quote

Route length, location and survey type – we reply with a written quote.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks