Utility Mapping & GPR Survey for Telecom Operators

Survey, permission and bore delivered on one programme by one company — because on a fibre rollout the thing that slips is never the drilling.

1.5 LAKH+ KMGPR Survey Completed
100 KM/DAYPeak Survey Output
700 KMFastest 30-Day Delivery
₹24/MStandard Rate · Min. order ₹50,000 NCR · ₹1,00,000 India

Equipment we own has logged over 1.5 lakh km so far, days of up to 100 km and a record of 700 KM in one 30-day month. Because mobilisation begins at Faridabad, a telecom site outside Delhi NCR has a project minimum of ₹1,00,000. Within NCR, the minimum order is ₹50,000 (covers up to 2 km).

Quick AnswerMezux Touch works as a survey and trenchless delivery partner to national telecom operators and their EPC contractors. Mezux has done direct work orders and contractor work for Airtel, NTPC, SAIL and authorities such as PWD and MCD, and our delivered record includes 135 KM at Bawana, 225 KM for NDMC and 67 KM at Okhla, each completed under multi-authority compliance.

What an operator actually buys from a survey partner

Not metres. An operator buys the ability to hand a circle team a drawing they can build from without a stoppage, and to hand a programme office a format they do not have to normalise at quarter end.

Those two requirements pull in different directions, which is why survey packs are so often rejected: what suits a site engineer is a chainage schedule, and what suits design assurance is attributed data. A pack has to satisfy both rather than choosing one.

We build against the operator's own checklist rather than against a general survey specification, because a technically sound pack in the wrong format costs the same as a wrong one once the gang has demobilised.

Speed we can actually evidence

Our fastest recorded GPR delivery is 700 kilometres surveyed inside 30 days — sustained at over 23 kilometres a day on our own fleet, without renting a single system. A separate delivery covered 250 kilometres in the same 30-day window.

That pace is only possible because all 58 GPR systems and all 18 HDD rigs are company-owned. A contractor who rents cannot commit to a mobilisation date, because the date belongs to the rental yard rather than to them.

Where an operator has a fixed go-live and a compressed window, this is the difference between hitting a season and explaining why it was missed.

What the survey has to deliver for a fibre route

A telecom route needs more than a list of what is buried. It needs the crossings identified by chainage so a drilling supervisor can work from a schedule, depths annotated so the bore profile clears existing plant, and a drawing in the format the operator's own GIS will ingest without rework.

Every route gets a signed report stating coverage and limitations. Where the operator orders a drawing set – quoted separately from the per-metre survey rate – we issue layered CAD in the operator's convention, GIS files in SHP or KML and a PDF issue set for circulation. Where a route feeds a data centre or an enterprise campus, diverse-path verification proves the second route is genuinely separate rather than separate on paper.

Permissions handled on the same programme

Our liaisoning desk files and follows up road-cutting permissions with municipal bodies, PWD, NHAI, railways and metro authorities, and closes out restoration certificates afterwards. It is our own staff, not sub-let.

That matters on a rollout because an unclosed restoration certificate from an earlier stretch can hold the next application from the same applicant. We check that before filing rather than discovering it when a file stalls.

Working across an operator's national footprint

Crews mobilise across 28+ States/UTs, with dedicated GPR pages for 60 cities covering local ground conditions and the authorities that govern them. A national rollout does not need a different contractor in every circle.

Explore GPR survey by city, the HDD drilling and OFC works pages, or our delivered project record.

What an operator's QA team looks for

Operator quality teams reject survey packs for predictable reasons: depths quoted without a stated basis, no declared limitations, layer naming that does not match the operator standard, and crossings listed in a drawing rather than a schedule a site engineer can work from.

We build against that checklist rather than discovering it at submission. Detection method and confidence are carried as attributes on every feature, limitations are stated explicitly including areas of no access, and the crossing schedule is issued as a first-class deliverable.

Draft issue goes back for comment before the signed version, which is considerably cheaper than a rejected pack after the gang has demobilised.

Where survey saves a rollout the most money

Not in the metre rate. The savings sit in avoided redesign when a route is drawn around an obstruction that was known before design freeze, in avoided standby when a crew is not waiting on a clearance, and in avoided strike cost.

A single strike on a live service brings emergency response, asset-owner recovery charges, a stop-work notice and programme delay. Operators who have paid for one rarely argue about survey scope on the next circle.

Our delivered corridors were completed under multi-authority compliance and, in the NDMC and Okhla cases, materially below approved capex — which is the same argument expressed as a number.

FAQ

Telecom Operators — common questions

Yes, and it is how most of our telecom work runs. Survey, RoW file and bore are scheduled against one another by one company, so the crew mobilises the week the sanction lands rather than the week after.

Our fastest recorded delivery is 700 kilometres in 30 days, sustained above 23 km a day on our own fleet. A separate delivery covered 250 kilometres in a 30-day window. Achievable pace depends on congestion and access on your specific route.

No. All 58 GPR systems and 18 HDD rigs are company-owned and crewed in-house, which is what lets us commit to a mobilisation date rather than checking a rental yard's availability.

Yes. When you order a drawing set, which is quoted separately from the survey rate, we issue layered CAD in your convention plus SHP or KML, agreed in writing before drafting rather than corrected afterwards. Depth and confidence are carried as attributes on every feature.

Yes, through our own liaison desk covering municipal bodies, PWD, NHAI, railways and metro authorities, including restoration certificate closure and deposit release.

Outside Delhi NCR, minimum accepted GPR order value is Rs 1,00,000 per project, because crews and rigs mobilise from Faridabad. On circle-level rollouts this is rarely a constraint, since a single corridor normally exceeds it. Within Delhi NCR the minimum order is ₹50,000 (covers up to 2 km).

Mezux has done direct work orders and contractor work for Airtel, NTPC, SAIL and authorities such as PWD and MCD. Delivered corridors include 135 KM at Bawana, 225 KM for NDMC and 67 KM at Okhla, each under multi-authority compliance.

For fibre routes on open corridors, overnight shifts on our own fleet have taken output to about 100 km a day. The record is 700 KM inside one 30-day programme, and our completed GPR survey totals more than 1.5 lakh km. On your OFC corridor the speed will track the congestion, the access available and the confidence level required.

Have a circle rollout with a fixed go-live?

Send the route schedule and target dates — we will work backwards from permissions and tell you what is deliverable.

Request a Sector Quote

GPR for telecom rollouts — specifications, standards and detailed questions

Mezux Touch works to operator quality standards rather than to a general survey specification, and the difference shows in what gets rejected. Operator QA teams return survey packs for predictable reasons: depths quoted without a stated basis, no declared limitations, layer naming that does not match the operator standard, and crossings buried in a drawing rather than listed in a schedule a site engineer can work from. We build against that checklist rather than discovering it at submission, because a rejected pack after the gang has demobilised costs far more than the survey did.

How the work is run

Survey is programmed against the rollout rather than against a survey calendar, so the corridor is cleared ahead of the construction front rather than months in advance when the data will have aged. Detection method and confidence are carried as attributes on every feature, because that is what an operator's design assurance process checks. Crossings are identified by chainage as the primary output. Draft issue goes back for comment before the signed version, so layer naming and format are agreed rather than corrected. Peak capacity is 100 km a day on open corridors, with a recorded best month of 700 KM in 30 days.

What you receive

A chainage-referenced crossing schedule as the primary deliverable, listing what crosses, at what depth, at what angle and with what confidence. Where a drawing set is ordered (quoted separately), layered CAD in the operator's own convention plus SHP or KML for GIS ingestion without rework. A PDF issue set for circulation. A signed report stating coverage, limitations and areas of no access. Where diverse routing is in scope, a separate verification statement establishing whether two carrier paths remain genuinely physically separate. Consolidated reporting across circles so a national programme office reads one format rather than reconciling twelve contractors at quarter end.

Beyond the basics

What do operator QA teams reject most often? Depths without a stated basis, missing limitations, non-standard layer naming, and crossings presented as a drawing rather than a chainage schedule.

How fast can a circle corridor be cleared? Peak sustained output is 100 km a day on open corridors, with 700 KM in 30 days as our recorded best month. Your route depends on congestion and access.

Can you survey and drill under one contract? Yes, and it is how most of our telecom work runs. Survey, RoW file and bore are scheduled against one another rather than sequentially.

Will the drawing load into our GIS? Yes, when a drawing set is ordered (priced separately), in SHP or KML to your schema, agreed in writing before drafting rather than corrected after ingestion fails.

Can you verify diverse routing? Yes, as a separate statement. Two paths that look separate on a drawing occasionally share a duct nobody checked.

Terms used on this page

Crossing schedule — a chainage-referenced list of what crosses a route, which is the format a site engineer actually works from. Design assurance — an operator's internal review process, which checks how information was obtained rather than only what it says. Diverse path — two carrier routes intended to remain physically separate so one strike cannot take both. Circle — an operator's regional licence area, each typically run as its own programme. Draft issue — a preliminary drawing released for comment so format is agreed before the signed version.

Sector — Telecom Operators
Quick answer

As a utility mapping company for telecom, Mezux Touch scans planned fibre and duct routes with company-owned GPR and EM locators, marks existing cables, pipes and other operators' ducts, and lists every crossing. Route surveys cost ₹24 per metre (₹32 with L-section); the minimum order is ₹50,000 in Delhi NCR and ₹1,00,000 outside it. GST extra.

Key points
  • We map existing cables, pipes and other operators' ducts along fibre routes using GPR and EM locators.
  • Every crossing is listed so planners can pick open trench, an HDD bore or a reroute early.
  • Case studies: 135 km at Bawana (2019, Bharti Airtel), 225 km in the NDMC area, 67 km at Okhla.
  • Those three corridors covered survey, permissions, HDD crossings and fibre installation, all delivered by Mezux Touch.
  • Telecom route surveys are billed at ₹24 a metre, or ₹32 with an L-section, with a minimum order of ₹50,000 in Delhi NCR (up to 2 km) and ₹1,00,000 elsewhere (up to 4 km).

Rates and page checked:

Survey crew working beside a road with a GPR cart and traffic cones
Our own crews run every telecom route scan; none of the work is sub-let.
Cross-section of HDPE telecom ducts laid beside existing buried services
Other operators' ducts are logged so a new fibre run keeps clear of them.
Diagram of an HDD bore path passing beneath a road crossing
Where fibre must pass under a highway or drain, the bore path is scanned first.
Route chart with kilometre markers showing surveyed and pending stretches
Long rollouts are tracked stretch by stretch against the construction front.
How it works · Clearing a fibre duct route
ChamberCrossingCrossingDUCT ROUTE CHECKED BEFORE TRENCH OR BORE
  1. STEP 1Route schedule received
  2. STEP 2Radar and EM passes
  3. STEP 3Crossings logged by chainage
  4. STEP 4Marks and report issued

What does a utility mapping company for telecom check on a fibre route?

Before a single duct goes in, a fibre planner needs three answers about the alignment: what is already buried along it, where it meets something that has to be crossed, and which stretches are too crowded to trench. As a utility mapping company for telecom, we get those answers with radar and EM locating along the route, then mark each find on the ground and list it in a signed report.

Services we most often meet on telecom alignments:

  • HDPE ducts and cables of other operators, at varying depths;
  • HT and LT power cables and street-light feeds sharing the same verge;
  • water mains, sewers and storm drains, plastic pipes included;
  • gas pipelines where city gas networks have been laid;
  • culverts, chambers and abandoned lines missing from every record.

Route-level detail, from feasibility to the planner's handover, is on our OFC route GPR survey page. Where a bore is planned, the HDD route survey covers the bore path and both pit locations.

Which kinds of telecom rollout need sub-surface mapping?

Sub-surface mapping for a telecom rollout is not one job; its scope shifts with the network being built:

  • Long-distance and backbone routes along highways and state roads – mostly open shoulder, broken by town stretches and canal or rail crossings. Pace matters most here, and on open corridors our crews have reached 100 km a day working day and night shifts.
  • Intra-city ducts in congested roads, where the duct must find a gap between power, water, sewer and older telecom plant, and junctions take up most of the survey time.
  • FTTH and last-mile drops into colonies, societies and campuses – short lengths with many entry points. Several such areas are usually grouped into one order so real survey length meets the minimum order.
  • Tower and enterprise spurs, short links that often hinge on one road or drain crossing surveyed with care.

Each type changes line spacing, working hours and how crossings are handled, so tell us which one you are building when you send the route.

Case studies: which OFC corridors have we delivered?

Three fibre corridors in Delhi are written up as case studies. None of them stopped at radar work: on each, our teams handled the route survey, the permissions, HDD crossings and the installation of the fibre itself.

Taken together that is 427 km of corridor carried from the first radar pass to cable in the duct by a single company. Each project page sets out the scope in more detail.

Which telecom guides help plan a fibre rollout?

A route survey is one step in a longer chain. These articles cover the stages around it, from choosing the duct to clearing the dig:

Where do our city pages and guides cover fibre routes in detail?

Three Gujarat cities have their own fibre route pages, each dealing with the roads and crossings that matter locally:

For background reading, the guide to GPR scanning for OFC routing follows a route from desk study to duct laying, and our note on HDD crossing surveys under roads and canals explains how a crossing is scanned before boring. Routes anywhere else in India are handled by the same crews, mobilised from Faridabad.

How is a telecom underground survey priced?

A telecom underground survey is billed per metre of route: ₹24 for a standard survey and ₹32 where an L-section depth profile of detected services is required. The minimum order is ₹50,000 inside Delhi NCR and ₹1,00,000 beyond it. GST is charged on top.

Rollouts are long, so the volume slabs matter. Once the whole order crosses a threshold, the discount applies to every metre in it:

Order lengthDiscountStandard rateExample, before GST
Up to 100 kmNone₹24/m60 km = ₹14,40,000
Above 100 km25%₹18/m250 km = ₹45,00,000
Above 500 km40%₹14.40/m600 km = ₹86,40,000
Above 1,000 km50%₹12/m1,200 km = ₹1,44,00,000

Putting several circles or cities into one order is the quickest way to a lower slab. Mobilisation, night-shift working, traffic arrangements and permissions, and CAD/GIS drawing sets are all quoted apart from these rates. The complete rate card is on the GPR survey price list.

STEP 1

Share the alignment

Send KML or route drawings for each circle or city, with the planned laying method, target dates and any known crossings.

STEP 2

Agree outputs up front

Confirm whether marks and a report are enough, or whether an L-section and a separately quoted CAD/GIS set are needed.

STEP 3

Scan ahead of crews

Radar and EM passes run in front of the duct-laying gang, so the data is still fresh when trenching or boring begins.

STEP 4

Schedule every crossing

Roads, drains, canals and rail lines met by the route are listed with the position and approximate depth of services found.

STEP 5

Report each stretch

Every completed stretch gets its own signed report, so construction teams need not wait for the full route to finish.

Insights

Telecom route survey capacity in numbers

Rate per metre by order size

Standard vs L-section GPR survey, ₹ per metre

StandardL-Section
₹0₹20₹40₹60₹80₹24₹32Up to 100 km₹18₹24100+ km₹14.4₹19.2500+ km₹12₹161,000+ km

Source: Mezux rate card, October 2026.

L-section survey cost for typical orders

L-section ₹32/m, ₹ lakh before GST, slab applied

₹0 L₹40 L₹80 L₹120 L₹160 L₹3.2 L10 km₹16 L50 km₹36 L150 km₹115.2 L600 km

Source: Mezux rate card – amounts before GST.

Our recorded output

Route surveyed, km

0 km300 km600 km900 km1200 km100 kmPeak day700 kmFastest 30 days

Source: Mezux delivery records.

Fact table

FactValueSource
GPR survey completed1.5 lakh+ km across 28+ States/UTsMezux records
Peak output on open corridors100 km a day (day + night shifts)Mezux records
Best month700 km in 30 daysMezux records
Standard route survey rate₹24 per metreMezux rate card
Discount once an order passes 1,000 km50% on every metreMezux rate card

Rates exclude GST; mobilisation, night shifts, traffic arrangements, permissions and drawing sets are quoted separately.

Best prices

Get Telecom Utility Mapping Across India at Best Prices

Per-metre billing, no day rates

Fibre routes are billed on surveyed length at ₹24 a metre, so the quote follows your route schedule rather than crew days.

Volume slabs for rollouts

Orders above 100 km get 25% off every metre, rising to 40% beyond 500 km and to half the rate beyond 1,000 km.

One order for many circles

Combining routes from several cities in a single order reaches a slab sooner and lets mobilisations be planned together.

L-section only where asked

Pay ₹32 a metre for the depth profile only on stretches whose work order calls for it; the rest stays at ₹24.

Owned fleet, fixed dates

With 58 GPR systems and 18 HDD rigs of our own, a mobilisation date never depends on a rental yard's calendar.

Extras listed separately

Mobilisation, night shifts, traffic arrangements, permissions and drawing sets each appear as a separate line in the quote.

Latest price list

GPR Survey Rates for Telecom Routes – Current Rates

ServiceUp to 100 kmAbove 100 km
(25% off)
Above 500 km
(40% off)
Above 1,000 km
(50% off)
Standard GPR Survey
min. order ₹50,000 NCR · ₹1,00,000 India
₹24/m₹18/m₹14.40/m₹12/m
L-Section GPR Survey
min. order ₹50,000 NCR · ₹1,00,000 India
₹32/m₹24/m₹19.20/m₹16/m

All rates are per metre of route surveyed and before GST. Once an order passes a slab, the lower rate applies to every metre of it. The minimum order is ₹50,000 in Delhi NCR (up to 2 km) and ₹1,00,000 in the rest of India (up to 4 km). Mobilisation, night-shift working, traffic and permission arrangements and CAD/GIS drawing sets are quoted separately. Updated 23 October 2026.

Price range

Lowest rate₹12/mStandard, above 1,000 km
Highest rate₹32/mL-Section, up to 100 km
Minimum order₹50,000Delhi NCR (up to 2 km) · ₹1,00,000 Rest of India (up to 4 km)
FAQ

More questions from telecom teams

What does a fibre route survey cost per kilometre?

At the standard rate of ₹24 a metre it works out to ₹24,000 per km before GST, or ₹32,000 per km with an L-section. Across the whole order the rate drops by 25%, 40% or 50% once it passes 100, 500 or 1,000 km. Mobilisation, night shifts, traffic arrangements and drawing sets are added separately.

Can short FTTH routes be ordered on their own?

Yes, though every order has a minimum, so a 1.5 km society drop is charged ₹50,000 in NCR or ₹1,00,000 elsewhere. Outside Delhi NCR the minimum order is ₹1,00,000 (covers up to 4 km). Most operators bundle several colonies or campuses into one order so the minimum is met by real survey length rather than paid for unused.

Will the survey show ducts that carry no metal?

Radar can often pick up HDPE ducts because their material differs from the soil, especially in dry ground. An EM locator cannot see them unless a tracer wire or metallic cable runs inside. Small or deep plastic ducts in wet clay can be missed, and the report states where ground conditions limited detection.

Is locating a cable fault part of the route survey?

No. Cable fault locating is a separate task from a route survey and is scoped and quoted on its own. A route survey shows where existing services lie before new work begins; fault locating searches for the point of damage on a cable that has already failed. We can do both, under separate orders.

Are night-shift surveys included in the rate?

No. Night working is often the only practical option on busy city roads, but it is charged separately from the per-metre rate. If your permissions allow work only after dark, mention it at enquiry stage so both the quote and the programme reflect it from the start.

Do you need the final design before surveying?

A KML or route drawing is enough to begin. If the design is still moving, we can scan a wider strip or one or two alternative alignments so the planner has options, each billed on the length scanned. Changes made after the survey are rescanned only on the stretches that actually moved.

Get a quote

Send your fibre route schedule

What to send for an exact quote

  • Start and end points of the route, or a KML
  • District and site type
  • Survey type: standard or L-section
  • When you want the crew on site
Standard GPR₹24/m
L-Section GPR₹32/m

₹24/m · Min. order ₹50,000 — Delhi NCR (up to 2 km) · Min. order ₹1,00,000 — Rest of India (up to 4 km) · GST extra · 25–50% off above 100 km.

What happens next

  1. Scope check – we confirm route length, crossings and L-section need.
  2. Written quote – rate, slab, minimums, extras and a day-by-day programme.
  3. Mobilisation – our own crew and systems on the agreed date.

Get a Quote

Route length, location and survey type – we reply with a written quote.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks