Skip to main content
ISO 9001:2015 · ISO 45001:2018

GPR Survey — For EPC Contractors

Underground Utility Mapping for EPC Contractors

Survey ahead of your construction fronts: buried services located, crossings listed and quantities measured in running metres, so cabling, pipeline, telecom and road EPC teams excavate and bore against known ground.

₹24/m standard₹32/m L-sectionMin 4 km · GST extra

How it works · Surveying ahead of construction
HT cableWater mainOFC ductGas lineRADARGRAM
  1. STEP 1Package alignment received
  2. STEP 2Radar and EM sweep
  3. STEP 3Crossings and clashes logged
  4. STEP 4Section reports handed over
1.5 LAKH+ KMGPR Survey Completed
58Company-Owned GPR Systems
23 YEARSUnderground Since 2003
₹24/MStandard GPR Rate · Min 4 km
Quick answer

Underground utility mapping for EPC contractors locates the cables, pipes and ducts already buried along a package alignment before trenching or HDD begins. Mezux Touch scans ahead of your fronts with 58 company-owned GPR systems and in-house crews, marks finds on the ground and reports them section by section, at ₹24 per metre or ₹32 with an L-section.

Rates and page checked:

Two technicians preparing GPR units beside barricades on a road project
One crew can be assigned to each construction front, so survey stays ahead of excavation.
Bar chart programme showing survey stages running ahead of construction
Survey sections are sequenced to release cleared lengths in the order your gangs need them.
Diagram of a planned cable route crossing several existing buried services
Every crossing on the package becomes a numbered line item in the survey report.
Signed survey report with tables of located services per section
Section-wise reports give the EPC team a document it can submit with the design.

What is underground utility mapping for EPC contractors?

An EPC contractor carries the risk of whatever lies under the alignment from the day the contract is signed. Buried services that nobody recorded become delays, redesigns, repair bills and disputes with the asset owner. Underground utility mapping for EPC contractors moves that discovery to the front of the job, before the trench is opened or the drill rig is set up.

The work is the same whether the package is HT/LT cabling, a water or gas pipeline, an OFC duct network or a road widening with utility shifting. Our crews run ground penetrating radar along the route, trace conductive lines with electromagnetic locators, paint each detected service on the surface and record it in a signed report. Where the design needs it, an L-section survey adds a depth profile of the detected services along the route.

What makes the work suit EPC delivery is the scale behind it. We have done this since 2003 with our own equipment – 58 GPR systems, operated by in-house crews, with nothing sub-let – and the total surveyed now stands above 1.5 lakh km, spread over 28+ States and UTs.

What does an EPC team need from a survey before excavation or HDD?

A contractor's planning engineer asks different questions from an asset owner. The survey should answer them directly, section by section:

  • Is the drawn alignment buildable? Stretches where the planned trench sits on top of an existing main or cable are flagged, with the side of the road that has space.
  • Where are the crossings? Each place where the new work meets an existing service is listed with position and approximate depth, so the crossing method can be chosen in advance.
  • Which crossings need HDD? Bore paths under roads, nalas and rail lines are scanned end to end, including both pit areas. Our HDD route survey page explains that scope in detail.
  • Where will progress slow down? Congested lengths that call for hand digging or a revised route are identified before gangs and machines are allocated.
  • What could not be seen? Stretches with no access, standing water or poor radar penetration are listed, so the risk is recorded rather than hidden.

These answers feed the design, the method statement and the daily allocation of excavation crews.

Road EPC packages add a further question: which existing services must be shifted before widening, and which can stay where they are. Utility shifting is often a separate cost head with its own approvals, so an early list of affected services, with their approximate positions and depths, helps the contractor raise the shifting proposal with each owner in time. Telecom and cabling contractors working along the same road benefit in the other direction, because the survey shows where newly shifted services now run rather than where an older drawing placed them.

How is the survey matched to the project programme?

A survey that arrives after construction has started is of little use. We plan our work as a front that moves ahead of yours, releasing surveyed and marked lengths in the order your gangs will reach them.

  1. Sequencing. The package is split into sections that follow your construction sequence, with priority given to stretches where work starts first or where long-lead crossings sit.
  2. Capacity. Because the radar fleet is ours, extra systems and crews can be put on a package when the programme demands, without waiting for rental availability. Our fleet has delivered as much as 100 km in one day on open corridors, and 700 km within a single 30-day month.
  3. Shifts. Night working is possible where daytime traffic or access is a problem; it is charged as a separate item.
  4. Handover. Each section is closed with its own marks and report, so cleared length can be issued to site without waiting for the whole route.

Ground marks fade, so the gap between survey and excavation on each section should be kept short. Where the programme slips, re-marking can be arranged.

How do survey quantities go into the BOQ?

GPR survey is easiest to manage when it is measured as its own item rather than buried inside trenching or laying rates. We bill in running metres of route surveyed, which maps directly onto a BOQ line:

BOQ itemUnitBasis
GPR utility survey, standardMetre₹24 per metre
GPR utility survey with L-sectionMetre₹32 per metre
MobilisationLump sumQuoted separately
CAD/GIS drawing setsAs specifiedQuoted separately
Trial pits or boreholesNumberOn request, quoted separately

Keeping standard and L-section lengths as separate lines lets the client's engineer see exactly where the depth profile was ordered. Night working and traffic arrangements are added as their own items where the work order needs them. Our guide on GPR survey quantities in a DISCOM tender BOQ covers how to write the item description and measurement rule.

What documentation helps the client approve your design?

Clients and their consultants increasingly ask an EPC contractor to show that existing services were checked before excavation was approved. The survey record gives you that evidence:

  • Signed survey report for each section, naming each located service, where it sits relative to the alignment, roughly how deep it lies and which method picked it up.
  • Coverage statement giving the penetration achieved per section, plus a list of unscanned lengths and why access failed there.
  • L-section depth profile, where ordered, for crossings and clearance checks; see our L-section GPR survey page.
  • CAD or GIS drawing sets in the client's layer format, prepared on request and quoted separately – the CAD and GIS utility mapping page explains the options.

Some clients specify survey quality in terms of how each line was obtained, from records only up to physically exposed. Our note on SUE quality levels explains that grading and where radar fits. Our quality, environmental and safety systems are certified to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018.

What do turnkey underground utility survey solutions from Mezux cover?

Turnkey here means one survey contractor, using its own crews and systems, handles every survey task the package needs instead of the EPC team stitching together several vendors. Turnkey underground utility survey solutions from us can include:

  • 2D GPR line survey along the route, with 3D or high-resolution scanning where congestion calls for it;
  • EM locating of power cables, metal pipes and traceable telecom lines;
  • ground marking of every detected service ahead of excavation;
  • signed section-wise reports and, where ordered, L-sections;
  • CAD/GIS drawing sets, trial pits and boreholes on request;
  • cable fault locating, which is a separate task from route survey;
  • HDD crossings drilled by our own rigs, quoted as a separate service.

Each of these is priced on its own line, so the client sees what was ordered. Drilling runs on 18 HDD rigs that we own, and our fleet page describes the equipment behind both services.

How much does utility mapping cost for an EPC package?

The rate card is the same for every package: ₹24 per metre of route for a standard GPR survey, ₹32 per metre when the L-section is added. At least 4 km is billed on any order, and outside Delhi NCR no project is billed below ₹1,00,000. GST is extra. Large packages earn a discount on every metre once the total passes a slab – 25% above 100 km, 40% above 500 km and 50% above 1,000 km – so crossing a slab can lower the total, as the last two rows below show.

PackageSurvey typeAmount before GST
3 km OFC link outside NCRStandard (billed as 4 km, raised to project minimum)₹1,00,000
12 km HT cable package in Delhi NCRStandard₹2,88,000
60 km water pipelineL-section₹19,20,000
100 km cable programmeStandard, no slab₹24,00,000
101 km cable programmeStandard, 25% slab₹18,18,000

Mobilisation, night shifts, traffic arrangements and permissions, and CAD/GIS drawing sets are not in these figures. The GPR survey price list sets out every slab with further examples.

STEP 1

Send the package alignment

Share KML or drawings for the full package, the construction sequence and the crossings already planned as HDD.

STEP 2

Receive a line-item quote

We price standard and L-section lengths, mobilisation and any drawing sets as separate lines matching your BOQ.

STEP 3

Fix the survey front

Sections are scheduled ahead of your excavation gangs, with crews and systems sized to the programme dates.

STEP 4

Scan, trace and mark

Radar and EM passes cover each section, and every detected service is painted on the ground with approximate depth.

STEP 5

Close each section

A signed report per section lists finds, crossings and unscanned lengths, so cleared stretches can be released to site.

Insights

EPC utility mapping in numbers

Rate per metre by order size

Standard vs L-section GPR survey, ₹ per metre

StandardL-Section
₹0₹20₹40₹60₹80₹24₹32Up to 100 km₹18₹24100+ km₹14.4₹19.2500+ km₹12₹161,000+ km

Source: Mezux rate card, October 2026.

What a short route costs

Standard ₹24/m, ₹ lakh before GST

₹0 L₹5 L₹10 L₹15 L₹20 L₹1 L4 km₹2.4 L10 km₹6 L25 km₹14.4 L60 km

Source: Mezux rate card – amounts before GST.

Our recorded output

Route surveyed, km

0 km300 km600 km900 km1200 km100 kmPeak day700 kmFastest 30 days

Source: Mezux delivery records.

Fact table

FactValueSource
Company-owned GPR systems58Mezux records
Company-owned HDD rigs18Mezux records
Best month of GPR survey700 km in 30 daysMezux records
Standard GPR survey₹24 per metreMezux rate card
Discount above 100 km25% on the whole orderMezux rate card

Rates exclude GST; mobilisation, night shifts, traffic arrangements and CAD/GIS drawings are quoted separately.

Best prices

Get Underground Utility Mapping for EPC Contractors at Best Prices

Rates that fit a BOQ

Standard survey at ₹24 a metre and L-section at ₹32 a metre slot straight into running-metre BOQ items.

Package-wide slab discounts

The full package length decides the slab, so combining sections into one order can take every metre to 25%, 40% or 50% off.

Owned systems, no hire

Our 58 GPR systems are owned, not rented, so the rate does not carry a hire charge or a sub-contractor's margin.

Fewer variations later

Finding clashes before design approval means fewer redesigns, idle gangs and change orders once construction is under way.

Pay for depth only where needed

Order the L-section on crossings and congested lengths, and the standard survey on open stretches of the same package.

Separate items kept visible

Mobilisation, night shifts, traffic arrangements and drawing sets appear as distinct lines, so nothing is hidden in the metre rate.

Latest price list

GPR survey rates for EPC packages – October 2026

ServiceUp to 100 kmAbove 100 km
(25% off)
Above 500 km
(40% off)
Above 1,000 km
(50% off)
Standard GPR Survey
minimum 4 km
₹24/m₹18/m₹14.40/m₹12/m
L-Section GPR Survey
minimum 4 km
₹32/m₹24/m₹19.20/m₹16/m

Per-metre rates, GST added on the invoice. The slab discount covers the full order quantity, not only the part above the slab. A ₹1,00,000 per-project minimum applies outside Delhi NCR. Mobilisation, night-shift working, traffic and permission arrangements and CAD/GIS drawing sets are quoted separately. Updated 23 October 2026.

Price range

Lowest rate₹12/mStandard, above 1,000 km
Highest rate₹32/mL-Section, up to 100 km
Minimum order4 km+ ₹1 lakh project minimum outside NCR
FAQ

Questions from EPC contractors about utility mapping

Can you survey only the sections we are about to excavate?

Yes. Many contractors release the package section by section in line with their construction sequence. Each release is surveyed and reported on its own, while the whole package can still be treated as one order for the discount slab if that is agreed at the outset.

Do you work as a sub-contractor to an EPC company?

Yes, that is a common arrangement. We take the survey scope from the EPC contractor, report findings to them and work to their programme. We do not sub-let any of our own survey work onward, so the crew on site is always ours.

Can the survey report be submitted to our client as it is?

The signed report is written so that it can go to the client or consultant with your design submission. If the client wants CAD or GIS drawing sets in a specific layer format, those are prepared on request and quoted separately.

What if the alignment changes after the survey?

Changed stretches are surveyed again as additional length at the same metre rate. If the new alignment stays within the corridor already scanned, the existing findings may cover it; we check that against the revised drawing before quoting.

Can night surveys keep pace with a tight programme?

Night shifts are possible where traffic or access makes daytime work slow, and they help keep the survey ahead of construction. Night working sits outside the per-metre price as its own item, as do traffic arrangements and permissions.

Do you provide trial pits to confirm critical depths?

Yes, on request. Where a crossing depth decides the design, digging a pit or sinking a borehole on that spot confirms the radar estimate. These are scoped and quoted as separate items, usually only at the few points where certainty matters most.

Get a quote

Send your EPC package details

What to send for an exact quote

  • The alignment as KML, drawing or road list
  • Town and type of site – public road, estate or plant
  • Whether the scope needs an L-section
  • Preferred start date and any night-only stretches
Standard GPR₹24/m
L-Section GPR₹32/m

Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.

What happens next

  1. Scope check – we confirm route length, crossings and L-section need.
  2. Written quote – rate, slab, minimums, extras and a day-by-day programme.
  3. Mobilisation – our own crew and systems on the agreed date.

Get a Quote

Route length, location and survey type – we reply with a written quote.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks