Skip to main content
ISO 9001:2015 · ISO 45001:2018

Service — OFC Route GPR Survey

OFC & Telecom Duct Route Feasibility Survey with GPR

Before a fibre duct goes into the ground, we scan the proposed alignment for existing cables, pipes, ducts and crossings, so planners know whether the route is feasible and where it must shift.

₹24/m standard₹32/m L-sectionMin 4 km · GST extra

How it works · Checking a fibre duct path
ChamberCrossingCrossingDUCT ROUTE CHECKED BEFORE TRENCH OR BORE
  1. STEP 1Planned alignment reviewed
  2. STEP 2Radar along duct line
  3. STEP 3Crossings and clashes logged
  4. STEP 4Feasibility findings reported
1.5 LAKH+ KMGPR Survey Completed
58Company-Owned GPR Systems
23 YEARSUnderground Since 2003
₹24/MStandard GPR Rate · Min 4 km
Quick answer

GPR scanning for OFC routing checks a planned fibre or telecom duct alignment before laying starts. Our crews scan with ground penetrating radar and EM locators to find existing services, crowded stretches and crossings, mark them on the ground and report route feasibility. Rates are ₹24 per metre, or ₹32 with an L-section, with a 4 km minimum order.

Rates and page checked:

Survey engineer reviewing route data on a tablet beside radar cart
Findings are checked against the planned fibre alignment while the crew is still on site.
Diagram of telecom ducts laid beside other buried utilities under a road
A new duct has to find room among power, water and older telecom lines.
Illustration of a cable route crossing beneath a railway line
Rail, highway and canal crossings often decide whether a fibre alignment is workable.
Radar scan image showing hyperbola shapes from buried pipes and ducts
Each hyperbola on the radargram is a buried object the duct route must clear.

What is GPR scanning for OFC routing?

GPR scanning for OFC routing is a survey done before any duct is laid. It answers one practical question for the network planner: can the fibre go along this alignment without hitting what is already buried, and if not, where should it go instead?

Our crew runs ground penetrating radar along the proposed duct line and electromagnetic locators over any conductive services. The result is a picture of existing cables, pipes, ducts and chambers along the route, marked on the ground and written into a signed report.

This page covers the survey only. If you also need the duct laid, cable blown and the route built, that work is described on our OFC laying service page. Many clients order the two separately: survey first, then a laying contract based on what the survey found. For a step-by-step technical read, see our guide to GPR scanning for OFC routing.

What does a telecom duct route feasibility survey check?

A telecom duct route feasibility survey is not just a list of utilities. It tests whether the planned route can actually be built. On each stretch we look for:

  • Parallel services – power cables, water mains, sewers, gas lines and other operators' ducts running alongside the planned duct, and how close they are.
  • Crossings – every point where an existing service passes under or across the alignment, with its approximate depth.
  • Congested strips – stretches where so many services share the verge or footpath that a new duct has no clear space.
  • Chambers and manholes – visible and buried structures that the duct must avoid or connect to.
  • Obstructions – culverts, buried foundations, old abandoned lines and unidentified objects, recorded as unidentified when no owner is evident.
  • Ground limits – sections where soil or moisture reduced radar depth, so a deeper service could be present undetected.

From these findings the planner can confirm the route, shift it to the other side of the road, change the planned depth, or switch a section from trenching to a bore.

How is a fibre route scanned in the field?

The method is the same whether the route runs through a city or along a rural highway, though line spacing changes with congestion:

  1. Route file check. We start from your KML or route drawing, the total length, the planned side of the road and any alternatives already under consideration.
  2. Walkover. The crew notes visible chambers, poles, marker posts, valve covers and recent trench scars, which hint at what lies below.
  3. Radar lines along the alignment. Continuous passes follow the planned duct line, with extra passes on an offset if the planner wants a fallback position.
  4. Cross-lines. Short lines across the route at regular gaps, and at every junction, chamber and crossing, catch services that cut across the path.
  5. EM locating. Conductive services such as live cables and metal pipes are traced and confirmed with an electromagnetic locator.
  6. Ground marking. Detected services are painted or pegged on site with approximate depth.
  7. Report. Findings, depth reached on each section, stretches we could not access and the reasons are written up and signed.

On open corridors with few obstructions, crews working day and night shifts have reached 100 km in a day, and our highest monthly output so far is 700 km in 30 days. Night working is quoted separately.

Which crossings decide whether a fibre route is feasible?

Long fibre routes are usually won or lost at a handful of crossings. These are the points we scan most closely:

  • Railway lines – usually crossed by HDD, with strict rules on where pits can sit. We scan the bore path and both pit areas.
  • National and state highways – carriageway crossings and junctions, where services from several owners converge.
  • Canals, drains and nalas – where the duct must pass beneath a water body or culvert, and existing services may already use the same crossing.
  • Bridge approaches – where ducts are often forced into a narrow strip beside the abutment.

For a crossing that will be bored, the scan gives the drilling team a clear path and depth band. Our HDD route survey page explains that work in more detail, and our own HDD rigs can drill the crossing after the survey if you want one contractor for both. Permissions to enter railway or highway land, and traffic arrangements, remain separate items arranged with the land owner.

How does an underground fiber optic network survey find existing ducts?

Existing telecom ducts are the hardest thing to find on most fibre routes, and the ones most likely to be hit. Many are HDPE pipes, which do not conduct electricity, so an EM locator cannot follow them unless a tracer wire or metallic cable is inside. Radar can still detect them, because the duct differs from the surrounding soil, but the signal depends on duct size, depth and ground moisture.

In an underground fiber optic network survey we therefore rely on radar for ducts and use EM wherever an armoured cable or tracer can be energised or picked up. Chambers and joint pits seen on the walkover help confirm a duct's path between them. Where the radar picture is weak, the report says so, and we can open a trial pit at a chosen point to confirm. Our article comparing the EM cable locator and GPR explains why both tools are needed.

What does the route survey deliver to the network planner?

The standard survey output is practical and site-focused:

  • ground marks for every detected service along the alignment;
  • a signed report listing each find, its approximate depth and the method that found it;
  • a note of the radar depth achieved on each section;
  • a list of stretches we could not scan, with the reason – parked vehicles, flooding, locked premises or permission limits.

If the work order asks for a depth profile, the L-section GPR survey adds the depth of detected services along the route at ₹32 a metre. CAD or GIS drawing sets can be prepared from the survey data on request; they are quoted separately and are not part of the metre rate.

How is an OFC route survey priced?

Pricing follows our standard rate card. A route survey costs ₹24 a metre (₹24,000 a kilometre), and the L-section version costs ₹32 a metre. The smallest order we bill is 4 km. For projects outside Delhi NCR, a ₹1,00,000 per-project minimum also applies; inside Delhi NCR, only the 4 km rule does. GST is extra.

Fibre routeSurveyAmount before GST
3 km city link inside Delhi NCRStandard₹96,000 (billed as 4 km)
3 km city link outside Delhi NCRStandard₹1,00,000 (project minimum)
40 km intercity routeStandard₹9,60,000
40 km intercity routeL-section₹12,80,000
600 km backbone routeStandard, 40% off₹86,40,000

The discount covers the whole order once it crosses a slab – 25% above 100 km, 40% above 500 km, 50% above 1,000 km. Mobilisation, night shifts, traffic arrangements and permissions, and CAD/GIS drawing sets are always charged separately. Full details are on the GPR survey price list.

When in the project should the route survey happen?

The survey is most useful after a route has been drawn on the map but before the laying contract is fixed. At that stage, a clash can still be solved by moving the line, changing the depth or adding a bore, without variation claims or idle crews. Surveying after laying has begun leaves only expensive options.

Operators and EPC contractors building telecom networks commonly order it at the feasibility or detailed-design stage, sometimes over several alternative routes. Our telecom operators page describes how survey work fits into wider network programmes. With 58 company-owned GPR systems and in-house crews mobilising from Faridabad, we can run long routes in sections so design can move forward as each section's findings are issued.

STEP 1

Send the fibre alignment

Share the KML or route drawing, the planned side of the road, total length and any alternative alignments under study.

STEP 2

Walk the route

Our crew notes chambers, poles, marker posts and old trench scars that point to services already in the ground.

STEP 3

Scan the duct line

Radar passes follow the planned duct, with cross-lines at junctions and EM tracing of cables and metal pipes.

STEP 4

Check each crossing

Rail, highway, canal and drain crossings get closer scanning, including bore paths and pit positions for HDD.

STEP 5

Issue feasibility findings

Ground marks and a signed report show clashes, congested stretches, depth reached and sections we could not access.

Insights

OFC route GPR survey in numbers

Rate per metre by order size

Standard vs L-section GPR survey, ₹ per metre

StandardL-Section
₹0₹20₹40₹60₹80₹24₹32Up to 100 km₹18₹24100+ km₹14.4₹19.2500+ km₹12₹161,000+ km

Source: Mezux rate card, October 2026.

L-section survey cost for typical orders

L-section ₹32/m, ₹ lakh before GST, slab applied

₹0 L₹40 L₹80 L₹120 L₹160 L₹3.2 L10 km₹16 L50 km₹36 L150 km₹115.2 L600 km

Source: Mezux rate card – amounts before GST.

Our recorded output

Route surveyed, km

0 km300 km600 km900 km1200 km100 kmPeak day700 kmFastest 30 days

Source: Mezux delivery records.

Fact table

FactValueSource
Standard route survey rate₹24 per metre (₹24,000 per km)Mezux rate card
L-section survey rate₹32 per metreMezux rate card
Minimum order length4 kmMezux rate card
Company-owned GPR systems58Mezux records
Peak survey output100 km a day; 700 km in 30 daysMezux records
GPR survey completed1.5 lakh+ km in 28+ States/UTsMezux records

Peak output figures are for open corridors with day and night shifts; city routes move more slowly.

Best prices

Get OFC Route GPR Survey at Best Prices

Same rate on every route

Fibre route survey is charged at ₹24 a metre wherever the route runs, so a 40 km link costs ₹9,60,000 before GST.

L-section only where asked

Order the ₹32-a-metre depth profile only on sections where the client or work order requires it, not across the whole route.

Backbone-length discounts

Long-haul routes crossing 100 km get 25% off the entire order, rising to 40% beyond 500 km and 50% beyond 1,000 km.

Survey before the contract

Scanning at design stage avoids paying for crews standing idle when a clash appears mid-laying, which costs far more than the survey.

Owned equipment and crews

All 58 GPR systems belong to us and crews are in-house, so the price carries no rental or sub-letting margin.

Separate items made clear

Mobilisation, night shifts, traffic and permission work and CAD/GIS drawings are listed individually, so you can compare quotes fairly.

Latest price list

OFC Route GPR Survey Rates – October 2026

ServiceUp to 100 kmAbove 100 km
(25% off)
Above 500 km
(40% off)
Above 1,000 km
(50% off)
Standard GPR Survey
minimum 4 km
₹24/m₹18/m₹14.40/m₹12/m
L-Section GPR Survey
minimum 4 km
₹32/m₹24/m₹19.20/m₹16/m

All rates are per metre of route surveyed and before GST. Once an order passes a slab, the lower rate applies to every metre of it. Sites outside Delhi NCR also carry a ₹1,00,000 project minimum. Mobilisation, night working, traffic and permission arrangements and drawing sets (CAD/GIS) are listed separately in the quote. Updated 23 October 2026.

Price range

Lowest rate₹12/mStandard, above 1,000 km
Highest rate₹32/mL-Section, up to 100 km
Minimum order4 km+ ₹1 lakh project minimum outside NCR
FAQ

Questions about OFC route GPR survey

Is this the same as your OFC laying service?

No. This service is the survey only: scanning the planned alignment, marking services and reporting feasibility. Duct laying, cable blowing and route construction are a separate service. You can order the survey alone, or follow it with laying by us or by another contractor.

Do you survey fibre routes inside Delhi NCR?

Yes. Our crews are based in Faridabad, so NCR routes are close to home. Inside Delhi NCR the 4 km minimum applies but the ₹1,00,000 project minimum does not. Night working and traffic arrangements, which are common on busy NCR roads, are quoted separately.

Can the survey follow an alignment change made mid-way?

Yes. If the survey shows a stretch is blocked, the planner can give us a revised alignment and we scan that instead or as well. Extra metres are billed at the same rate. Telling us early avoids sending the crew back for a separate visit later.

What route information should we send?

A KML or route drawing, the total length, the planned side of the road or footpath, intended duct depth, and whether sections will be trenched or bored. Mark railway, highway and canal crossings, and send any existing utility records you have, even if they are incomplete.

Do we need right-of-way permission before the survey?

Usually some form of permission is needed to work on a road, highway, railway or private land. Arranging it is the project owner's responsibility, and our crew works within whatever access is granted. Permission and traffic arrangements are not included in the survey rate.

Can GPR tell how much spare space is inside an existing duct?

No. Radar shows that a duct is present and its approximate position and depth; it cannot see whether the duct is full, empty or damaged inside. Checking capacity needs the duct owner's records or a physical inspection at the chambers.

Get a quote

Send your fibre route for a quote

What to send for an exact quote

  • Start and end points of the route, or a KML
  • District and site type
  • Survey type: standard or L-section
  • When you want the crew on site
Standard GPR₹24/m
L-Section GPR₹32/m

Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.

What happens next

  1. Scope check – we confirm route length, crossings and L-section need.
  2. Written quote – rate, slab, minimums, extras and a day-by-day programme.
  3. Mobilisation – our own crew and systems on the agreed date.

Get a Quote

Route length, location and survey type – we reply with a written quote.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks