Service — L-Section GPR Survey
L-Section GPR Survey for Cable & Pipeline Routes
An L-section survey shows how deep each detected buried service lies along the length of your cable or pipeline route – one depth profile your designer and client can read at a glance.
₹24/m standard₹32/m L-sectionMin 4 km · GST extra
- STEP 1Route length confirmed
- STEP 2Radar runs the route
- STEP 3Service depths recorded
- STEP 4Profile issued with report
An L-section GPR survey scans your planned cable or pipeline route and presents the depth of every detected underground service as a continuous profile along that route. Mezux Touch prices it at ₹32 per metre, eight rupees above the ₹24 standard survey rate, with a 4 km minimum order, slab discounts above 100 km and GST extra.
Rates and page checked:

What is an L-section GPR survey?
Think of an L-section (longitudinal section) as the ground sliced lengthwise along a route and viewed from the side. An L-section GPR survey uses radar scanning to build that side view for the services under your planned alignment: each water main, sewer, gas pipe, duct or cable detected along the way is shown at the depth where it was found.
A standard survey answers the question "where is it?" in plan. The L-section also answers "how deep is it, all the way along?" – which is what a designer asks when setting the laying depth of a new cable or pipe and deciding where it must dip or rise to pass existing services. Contractors who search for GPR profiling services for a specific route usually need exactly this.
The profile can only show what radar reaches. How far it reaches depends on soil and moisture: moist clay and salty ground cut it down, while dry sand lets the signal go further, and our report notes, stretch by stretch, how deep the radar got.
When do contractors need an L-section?
Not every job does. The profile earns its extra ₹8 per metre in situations like these:
- the work order or tender asks for an L-section drawing for the cable route to be submitted along with the survey;
- the route runs through congested streets where the new line must pass over some services and under others;
- part of the route will be laid by HDD, and the bore has to clear existing services;
- a pipeline or duct must hold a gradient, so depth along the full length matters;
- the client wants a record of what lay beneath the route before construction.
Where the job is a simple land survey for underground electrical cabling along open rural verges with few services, the standard survey is usually enough. Not sure which one your contract needs? Send us the survey clause and we will tell you plainly.
How does it differ from the ₹24/m standard survey?
| Point | Standard GPR survey | L-section GPR survey |
|---|---|---|
| Rate | ₹24 per metre | ₹32 per metre |
| Main output | Plan position of detected services, with depth at measured points | Everything in the standard survey, plus a continuous depth profile of every detected service |
| Ground marking | Yes | Yes |
| Typical use | Trench clearance on open routes, locating services before digging | Congested routes, HDD sections, contracts that call for a profile |
| Minimum order | 4 km | 4 km |
Field work is planned differently when a profile is required, so it is better to order the L-section at the outset than to add it once a standard survey has been completed.
What does an L-section GPR survey cost?
The rate is ₹32 per running metre, or ₹32,000 per kilometre. A few rules shape the final figure:
- Minimum length: 4 km per order, so the smallest L-section job is billed at ₹1,28,000. That already clears the ₹1 lakh project minimum that applies beyond Delhi NCR.
- Volume slabs: once the full order goes beyond 100 km, the rate becomes ₹24/m; beyond 500 km, ₹19.20/m; beyond 1,000 km, ₹16/m. The lower rate covers every metre, not just the extra ones.
- Taxes and extras: GST is added separately. Mobilisation, night-shift working, traffic arrangements or permissions, and CAD/GIS drawing sets sit outside the per-metre rate and are quoted on their own.
As an example, a 50 km cable route costs ₹16,00,000 with the L-section against ₹12,00,000 for the standard survey, both before GST. The GPR survey price list sets out every rate and slab.
How do you order an L-section survey?
- Send the route as a KML file or marked drawing through our quote form, with its approximate length.
- Tell us what the route is for – HT/LT cable, OFC duct, water or gas pipeline – and whether any part will be bored.
- Share the clause in your work order that describes the survey or L-section required.
- We reply with a quote showing the ₹32/m rate, any slab, minimums and separately priced items, plus a working programme.
- Crews mobilise from Faridabad with company-owned GPR systems and start on the stretches you need first.
For power cable jobs, the HT/LT cable route survey page explains the full route survey this profile is built on. Contractors in central Gujarat can use our Vadodara L-section page, and our article about L-section requirements on DISCOM cabling jobs discusses how these profiles are used on distribution projects.
Guides on L-sections and cable routes
L-section GPR survey in numbers
Rate per metre by order size
Standard vs L-section GPR survey, ₹ per metre
Source: Mezux rate card, October 2026.
Cost of longer orders
Standard ₹24/m with whole-order slab, ₹ lakh before GST
Source: Mezux rate card – amounts before GST.
Our recorded output
Route surveyed, km
Source: Mezux delivery records.
Fact table
| Fact | Value | Source |
|---|---|---|
| Rate for L-section work | ₹32 per metre (₹32,000 per km) | Mezux rate card |
| Standard survey rate, for comparison | ₹24 per metre | Mezux rate card |
| Smallest billable L-section order | 4 km = ₹1,28,000 before GST | Mezux rate card |
| Slab rates beyond 100, 500 and 1,000 km | ₹24, ₹19.20 and ₹16 per metre | Mezux rate card |
| Company-owned GPR systems | 58 | Mezux records |
GST is extra; mobilisation, night-shift work, permissions, traffic arrangements and CAD/GIS sets are quoted separately from these rates.
Get L-Section GPR Survey Across India at Best Prices
Order the profile up front
Planning field work for a profile from day one avoids a second mobilisation, which almost always costs more than the ₹8 per metre difference.
Profile only where it matters
On mixed routes, order the L-section for congested or bored stretches and the standard survey for open lengths within the same order.
Let long orders reach slabs
Beyond 100 km of L-section work, every metre drops to ₹24 – the same as the standard rate on a smaller job.
Use the 4 km minimum fully
Short routes are billed as 4 km, so grouping nearby small routes into a single order makes full use of that minimum.
Separate items stay visible
Mobilisation, night work, permissions and CAD/GIS sets appear as their own lines, so different quotes can be compared fairly.
Written quote, GST shown extra
Every quote states the per-metre rate before GST and the minimums that apply, so the final bill holds no surprises.
L-Section GPR Survey Rates – October 2026
| Service | Up to 100 km | Above 100 km (25% off) | Above 500 km (40% off) | Above 1,000 km (50% off) |
|---|---|---|---|---|
| Standard GPR Survey minimum 4 km | ₹24/m | ₹18/m | ₹14.40/m | ₹12/m |
| L-Section GPR Survey minimum 4 km | ₹32/m | ₹24/m | ₹19.20/m | ₹16/m |
Charged per running metre, before GST; the discount slab is decided by the total order and applies to all of it. Outside the Delhi NCR region the project minimum is ₹1,00,000. Separate from the per-metre rate: mobilisation, night shifts, traffic or permission arrangements and CAD/GIS drawings. Updated 23 October 2026.
Price range
L-section survey questions
Does an L-section show services that radar could not detect?
No. The profile shows only what was detected. Where ground conditions limit radar depth, the report states the depth reached in that section, so a blank part of the profile is not mistaken for clear ground. Where certainty matters, ask for trial pits or boreholes as an add-on.
Can I order an L-section for only part of my route?
Yes. Many routes have open stretches where a standard survey is enough and congested or bored stretches where a profile helps. The quote can show both rates within the same order; simply tell us which lengths need the L-section and which do not.
Is the L-section only for power cables?
No. The same profile is useful on OFC duct routes, water and sewer lines, and gas pipelines – in fact on any alignment where the depth of existing services along the way affects how the new line is laid, crossed or bored.
Does the ₹32 rate include CAD drawings?
The ₹32 per metre rate is for the L-section survey. CAD or GIS drawing sets prepared to your client's format are quoted separately, as are mobilisation, night-shift working and traffic arrangements or permissions. This way you pay only for the drawing deliverables your contract actually requires.
Will the L-section add time to the programme?
Somewhat, both on site and in the office, because depth data has to be collected and checked along the whole route rather than at selected points. The programme in our quote allows for this, based on route length, congestion and the working hours permitted on the road.
What if we ordered a standard survey and now need the profile?
It is possible, though crews normally have to return to site, because profile data is collected differently. A second visit brings another round of mobilisation and traffic arrangements, so ordering the L-section with the original survey normally works out cheaper overall.
L-section and GPR surveys by city
- Delhi GPR survey
- GPR survey company in Mumbai
- Underground utility survey in Bengaluru
- Ground penetrating radar survey in Chennai
- Cable and pipe detection in Hyderabad
- GPR survey in Kolkata
- Pune GPR survey
- GPR survey company in Ahmedabad
- Underground utility survey in Gurugram
- Ground penetrating radar survey in Noida
- Cable and pipe detection in Jaipur
- GPR survey in Lucknow
- Indore GPR survey
- GPR survey company in Bhopal
- Underground utility survey in Patna
- Ground penetrating radar survey in Chandigarh
- Cable and pipe detection in Nagpur
- GPR survey in Kochi
- Guwahati GPR survey
- GPR survey company in Bhubaneswar
Other GPR survey services
- Expressway utility survey
- GIS utility mapping agency
- RoW liaisoning & road-cutting permission
- SUE survey
- CGD utility survey
- Water and sewer line survey
- How GPR survey is priced
- Corridor utility survey
- Underground cable detection
- Pipe and cable locator services
- GPR survey for every sector
- Telecom underground survey
- Utility strike prevention survey
- Road widening utility survey
- HDD drilling contractor
- Pre-drilling bore path scan
- DISCOM cable network survey
- Underground utility mapping services
- Telecom duct route feasibility survey
- OFC laying works
Get your route profiled
What to send for an exact quote
- The alignment as KML, drawing or road list
- Town and type of site – public road, estate or plant
- Whether the scope needs an L-section
- Preferred start date and any night-only stretches
Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.
What happens next
- Scope check – we confirm route length, crossings and L-section need.
- Written quote – rate, slab, minimums, extras and a day-by-day programme.
- Mobilisation – our own crew and systems on the agreed date.






