The cheapest day to find a buried foundation is the day before you excavate. The most expensive is the day the piling rig meets it.
What a cleared site still contains
A demolished building leaves footings.A cleared plot leaves a septic tank.A levelled field leaves a well.The surface tells you none of it.Site clearance removes what is above ground. Everything below stays exactly where it was, and on a plot with any history that is usually more than the developer has been told about.
Buried structures · Chambers and tanks · Abandoned borewells · Live services
Quick AnswerMezux Touch carries out pre-construction GPR survey for site clearance — detecting buried foundations, chambers, septic tanks, abandoned borewells and live services before excavation begins, so a piling programme is set out against measured ground rather than a demolition assumption.
Timing is the whole value of this survey
Found before excavation, a buried footing is a setting-out adjustment. Found by a piling rig, it is a stopped programme, a damaged tool and a redesign under time pressure.
That is why we push clients to survey after demolition and before setting out rather than at either end. A survey commissioned once piling has started is investigating a problem instead of preventing one.
What we find that clients did not expect
Old footings and basement slabs from demolished structures are the most common. After that: septic tanks and soak pits, disused chambers, abandoned borewells, and on former agricultural land, brick-lined wells and irrigation channels beneath levelling fill.
A vertical void beneath a proposed footing is a different order of problem from a service line, so we report structural findings in their own schedule rather than mixing them into a utility drawing.
How a site survey runs
What was on this plot before?
Demolition drawings, old imagery and local knowledge tell us what to look for. A plot that held a factory and one that held houses leave entirely different things behind.
Area coverage rather than a corridor
Site work is surveyed as an area on a grid rather than as a route, with spacing set against the smallest feature that would affect the foundation design.
Footings, slabs and basements
Buried structural remains are mapped with their outline rather than as a point, because the design question is how much of the footprint is affected.
Tanks, soak pits and borewells
Vertical voids and buried chambers are reported in their own schedule, since a cavity beneath a proposed footing is a structural matter rather than a utility clash.
Live connections still in the ground
Incoming services frequently remain live after demolition. These are identified and reported as live or unverified rather than assumed disconnected.
Stating what the ground allowed
Achievable depth is stated for the site rather than assumed, because made ground and demolition rubble both limit how far radar usefully reaches.
Findings against your setting-out
Where the client provides the proposed foundation layout, results can be overlaid on it as a drawing set, quoted separately from the survey rate, so clashes are visible rather than requiring interpretation.
What is worth verifying before piling
Where a finding sits under a critical foundation element, we nominate it for trial excavation rather than leaving the design team to decide on a radar image alone.
Greenfield sites are not empty either
Land that was agricultural within living memory carries field drains, irrigation channels, open wells and abandoned borewells beneath the levelling fill. None of it appears on a developer's layout.
A brick-lined well beneath a proposed footing is a structural problem discovered late, and it is entirely findable early.
NCR development areas we clear
Underground chamber detection is part of every site clearance here, since disused inspection chambers and soak pits survive demolition almost without exception. A GPR survey for construction is commissioned for one reason above all others: underground structure detection before setting out, so a piling programme is not designed against an assumption about what demolition left behind. Plots across the capital region are surveyed before setting out. What a site is likely to contain depends heavily on which area it sits in:
GPR survey in Rohini|GPR survey in Dwarka|GPR survey in Saket|GPR survey in Gurugram|GPR survey in Noida|GPR survey in Faridabad|GPR survey in Ghaziabad|GPR survey in Greater Noida
About to set out a piling programme?
Survey after demolition and before setting out — that week is when this costs least and prevents most.
Get A Quote +91 99100 10209Construction site survey — timing, findings and detailed questions
Site clearance surveys are commissioned at three points and only one of them is right. Before demolition misses what demolition exposes. After piling begins is investigation rather than prevention. Between the two, when the plot is clear and setting out has not started, is when the same survey costs least and changes most.
Why structural findings are reported separately
A buried footing, a septic tank and an abandoned borewell are structural matters for the foundation designer. A live cable is a safety matter for the excavation contractor. Presenting both on one drawing means whichever reader is looking has to filter out half of it, and on a busy site the filtering does not happen. We issue two schedules for that reason, and the structural one usually reaches the design team while the services one reaches the site.
What is delivered
A site plan showing detected features with outlines rather than points, so the affected footprint is visible. A structural findings schedule covering buried footings, slabs, chambers, tanks and vertical voids. A services schedule with confidence per feature and live or unverified status stated. Achievable depth for that specific site given the made ground present. Where the foundation layout is supplied, an overlay showing clashes directly can be prepared as a separately quoted drawing set. Recommendations for trial excavation where a finding sits beneath a critical element.
Beyond the basics
Can you find a septic tank reliably? Usually, since a buried chamber returns strongly. Depth and surrounding material affect it, and we state confidence per feature.
What about deep basements from old structures? Detectable to the depth the ground allows. Where a basement is deeper than radar reaches, we say so rather than implying full clearance.
Is a greenfield site worth surveying? Yes, if it was agricultural. Field drains, wells and borewells beneath levelling fill are common and none appear on a layout.
Who uses the structural schedule? The foundation designer, usually before setting out. The services schedule goes to the excavation contractor, which is why they are separate.
Do you attend during piling? On request, for spot clearance ahead of the rig. It is more expensive than surveying the whole site beforehand and occasionally worth it.
Terms used on this page
Setting out — marking the foundation layout on site, the point after which changes cost more. Vertical void — an abandoned borewell, well or shaft, a structural hazard rather than a utility. Made ground — material placed by people, including demolition rubble, which limits survey depth. Overlay — survey findings plotted against a proposed layout so clashes are directly visible. Trial excavation — exposing a detected feature to confirm it before a design decision depends on it.
A construction site GPR survey scans a cleared plot on a grid to find old footings, slabs, tanks, abandoned borewells and live service lines before setting out. Mezux Touch charges ₹24 per metre of scan line, with a minimum order of ₹50,000 in Delhi NCR and ₹1,00,000 elsewhere, and GST extra; mobilisation and drawing sets are quoted separately.
Rates and page checked:

- STEP 1Plot history collected
- STEP 2Grid scanned by radar
- STEP 3Structures and services separated
- STEP 4Findings issued before setting out
When does a construction site need a GPR survey?
A construction site GPR survey earns its cost whenever the ground under a plot has a past that nobody fully recorded. The common triggers are:
- Redevelopment after demolition – a house, factory or warehouse came down, and its footings, tanks and connections may still be below grade.
- Piling or raft foundations – a rig meeting an old slab or a brick-lined well stops the programme, so the pile grid needs clearing first.
- Basement excavation beside a road, where live water, power and telecom lines run close to the boundary.
- New incoming services – power, water, sewer and fibre connections cut from the plot edge to the public network.
- Former farmland turned into a layout, where field drains and wells lie under levelling fill.
The same approach works as a ground radar survey for infrastructure projects such as substations, pumping stations, depots and treatment plants, where foundations and buried services share a compact footprint. If the plot is clean, the survey says so in writing; if it is not, the design team learns early enough to move a pile or a footing at no real cost.
How is a site survey priced on the Mezux rate card?
Plots are charged in exactly the way routes are: by the metre of radar line actually run. Covering an area on a grid simply means adding up the lengths of all the grid lines, so the bill follows the plot size and the spacing the site needs.
- ₹24 per metre for the standard survey of the grid.
- ₹32 per metre for an L-section, where a service run across or along the plot also needs a depth profile of the services detected.
- Minimum order of ₹50,000 in Delhi NCR (up to 2 km) and ₹1,00,000 elsewhere (up to 4 km). A plot needing 3 km of grid lines in Delhi NCR comes to ₹72,000 before GST.
- ₹1,00,000 per project as the lowest bill for any plot outside Delhi NCR. Inside NCR, the minimum order is ₹50,000.
- Volume slabs of 25%, 40% and 50% off every metre once an order passes 100 km, 500 km and 1,000 km – relevant to developers clearing many plots or a large township together.
Travel and set-up (mobilisation), any night shift, traffic control or permits, and CAD/GIS drawings each carry their own quoted price and never sit inside the metre rate. GST is added to the total. Every slab, with an online calculator, is set out on our GPR survey price list, while the GPR survey cost guide explains how a quote is built.
Who carries out the survey, and how far do crews travel?
Every site is scanned by our in-house crews on company-owned equipment. Mezux Touch runs 58 GPR systems and 18 HDD rigs from its Faridabad yard, with no hired machines and no sub-letting, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. Crews mobilise from Faridabad to plots across Delhi NCR and to other states; the same team has logged 1.5 lakh+ km of radar survey work spread over 28+ States and UTs.
For a plot in Gujarat, pre-dig work is covered on our Vadodara pre-excavation scanning page, and builders laying out new colonies can read about underground utility lines for builders.
Which guides help a site team before excavation?
- Pre-excavation utility scanning – scanning a single pit, trench or foundation area right before digging, rather than the whole plot.
- GPR versus trial pits and boreholes – when radar is enough and when a finding should be exposed or drilled.
- How accurate GPR depth readings are – useful before a designer relies on a depth near a pile toe or basement wall.
- Utility mapping and strike prevention – why services thought dead cause so many site incidents.
Guides for builders and site engineers
Construction site GPR survey in numbers
Rate per metre by order size
Standard vs L-section GPR survey, ₹ per metre
Source: Mezux rate card, October 2026.
Standard survey cost for typical orders
Standard ₹24/m, ₹ lakh before GST, slab applied
Source: Mezux rate card – amounts before GST.
Our recorded output
Route surveyed, km
Source: Mezux delivery records.
Fact table
| Fact | Value | Source |
|---|---|---|
| Standard survey rate per metre of grid line | ₹24 | Mezux rate card |
| L-section survey rate per metre | ₹32 | Mezux rate card |
| Minimum order | ₹50,000 in Delhi NCR (up to 2 km); ₹1,00,000 elsewhere (up to 4 km) | Mezux rate card |
| GPR systems owned by Mezux | 58 | Mezux records |
Mobilisation, night shifts, traffic control and drawing sets are priced outside the metre rate, and GST is added.
Get Construction Site GPR Survey at Best Prices
Price follows grid length
You pay ₹24 for every metre of radar line run across the plot, so a tighter grid only where footings sit keeps cost down.
Survey once, before setting out
Scanning the whole cleared plot in one visit costs far less than calling a crew back for spot checks ahead of the piling rig.
Bundle plots together
Developers with several sites can place them in one order, sharing mobilisation and using the minimum order more easily.
Large layouts earn slabs
Township and campus programmes above 100 km of scan lines get 25% off every metre, rising to 40% and 50% at higher totals.
Own fleet, own crews
No rented radar and no sub-letting means the quote carries no hire charge or middleman margin on top of the rate.
Extras quoted before work
Mobilisation, night work, permissions and drawing sets are listed separately on the quote, so the final bill holds no surprises.
Construction site GPR survey rates – Current Rates
| Service | Up to 100 km | Above 100 km (25% off) | Above 500 km (40% off) | Above 1,000 km (50% off) |
|---|---|---|---|---|
| Standard GPR Survey min. order ₹50,000 NCR · ₹1,00,000 India | ₹24/m | ₹18/m | ₹14.40/m | ₹12/m |
| L-Section GPR Survey min. order ₹50,000 NCR · ₹1,00,000 India | ₹32/m | ₹24/m | ₹19.20/m | ₹16/m |
Rates per running metre of route surveyed. GST extra. Discount applies to the whole order quantity once it crosses the slab. Outside Delhi NCR the minimum order is ₹1,00,000 (covers up to 4 km). Separate from the per-metre rate: mobilisation, night shifts, traffic or permission arrangements and CAD/GIS drawings. Updated 23 October 2026.
Price range
More questions about construction site GPR survey
Does a GPR site survey replace a geotechnical soil investigation?
No. Radar locates buried objects, services and voids; it does not test bearing capacity, soil strength or groundwater for foundation design. The two answer different questions and are usually commissioned together. Trial pits or boreholes at chosen findings can be added on request, but a full soil investigation remains a separate engineering task.
How is an area survey turned into a price?
We lay out a grid over the plot, choosing spacing to suit the smallest feature that matters to the design, then add up the length of every line. That total is charged at ₹24 per metre, subject to the minimum order: ₹50,000 in Delhi NCR and ₹1,00,000 outside it.
Can you survey a plot outside Delhi NCR?
Yes. Crews and equipment travel from Faridabad to sites in other states, and the trip is quoted as mobilisation. Projects outside NCR carry a ₹1,00,000 minimum order, so grouping several plots or adding a service route nearby often makes better use of the visit.
Will the ground be marked for the excavation contractor?
Yes. Detected services and the outlines of buried structures are painted or pegged on the plot as the scan proceeds, with approximate depths noted. Marks fade under rain and machine traffic, so excavation should follow soon after the survey; the signed report keeps the record once the paint has gone.
Is the survey useful for a boundary wall or drainage works?
Often, yes. Boundary walls and external drains run along the plot edge, which is exactly where incoming water, power, sewer and telecom connections cross into the site. Scanning a strip along the boundary before the trench is cut finds those connections, and the cost follows the scan length in the usual way.
What should be ready on site before the crew arrives?
The plot should be cleared and levelled as far as practical, with debris heaps and parked machinery moved off the areas to be scanned. Standing water should be drained. Tell us about locked areas, working hours and site safety rules, and keep a contact person available to show boundaries and known connection points.
When should the survey happen?
After demolition and before setting out. Earlier misses what demolition exposes; later is investigating a problem rather than preventing one.
What do you find most often?
Old footings and basement slabs, then septic tanks, soak pits, disused chambers and abandoned borewells.
Are incoming services really still live?
Frequently. Demolition rarely includes disconnection at the main, so we report services as live or unverified rather than assumed dead.
Does demolition rubble affect the survey?
Yes, it limits achievable depth. We state the figure for the site rather than quoting a general one.
Can findings be overlaid on our foundation layout?
Yes, where you provide it, as a drawing set quoted separately from the per-metre rate. Clashes are then visible rather than requiring someone to interpret two drawings together.
GPR survey in cities we cover
- GPR survey company in Delhi
- Underground utility survey in Mumbai
- Ground penetrating radar survey in Bengaluru
- Cable and pipe detection in Chennai
- GPR survey in Hyderabad
- Kolkata GPR survey
- GPR survey company in Pune
- Underground utility survey in Ahmedabad
- Ground penetrating radar survey in Gurugram
- Cable and pipe detection in Noida
- GPR survey in Jaipur
- Lucknow GPR survey
- GPR survey company in Indore
- Underground utility survey in Bhopal
- Ground penetrating radar survey in Patna
- Cable and pipe detection in Chandigarh
- GPR survey in Nagpur
- Kochi GPR survey
- GPR survey company in Guwahati
- Underground utility survey in Bhubaneswar
Related survey and underground services
- Buried utility mapping
- HDD drilling contractor
- HT/LT cable route GPR survey
- Telecom route survey
- Pre-excavation utility scanning
- Right of way permissions
- Underground void survey
- GPR scanning services
- Underground power cable tracing
- Corridor utility survey
- GPR survey for city gas networks
- Fibre network construction
- EPC utility survey support
- HDD route survey
- How GPR survey is priced
- SUE quality-level survey
- L-section GPR survey
- Utility mapping with CAD/GIS deliverables
- Highway crossing survey
- Underground pipeline detection
Send your plot layout for a site survey quote
What to send for an exact quote
- Start and end points of the route, or a KML
- District and site type
- Survey type: standard or L-section
- When you want the crew on site
₹24/m · Min. order ₹50,000 — Delhi NCR (up to 2 km) · Min. order ₹1,00,000 — Rest of India (up to 4 km) · GST extra · 25–50% off above 100 km.
What happens next
- Scope check – we confirm route length, crossings and L-section need.
- Written quote – rate, slab, minimums, extras and a day-by-day programme.
- Mobilisation – our own crew and systems on the agreed date.