How a narrow saw-cut slot carries micro-ducts through city roads, which streets suit it, the shallow services it puts at risk, and the scan of the cut line that should happen before any saw starts.

₹24/m standard₹32/m L-sectionMin 4 km · GST extra

How it works · Scanning a micro trench line
HT cableWater mainOFC ductGas lineRADARGRAM
  1. STEP 1Scan the cut line
  2. STEP 2Mark shallow services
  3. STEP 3Saw-cut and lay micro-duct
  4. STEP 4Seal and record slot
1.5 LAKH+ KMGPR Survey Completed
58Company-Owned GPR Systems
23 YEARSUnderground Since 2003
₹24/MStandard GPR Rate · Min 4 km
Quick answer

Micro trenching is a way of laying fibre by saw-cutting a narrow, shallow slot in a paved road, placing micro-ducts in it and sealing it behind the cut. It disturbs far less road than a conventional trench, but it runs through the layer where shallow cables and loops sit, so the cut line should be scanned first.

Key points
  • Micro trenching saw-cuts a slot a few centimetres wide in paved roads to carry micro-ducts.
  • Duct makers' guidance describes cuts roughly 12 to 75 mm wide and up to about 600 mm deep.
  • Spoil is vacuumed out, ducts placed, the slot backfilled and the surface sealed close behind the cut.
  • Its main risks are shallow services, weak pavements and later road milling reaching the ducts.
  • A high-resolution GPR scan of the cut line finds shallow cables and loops before the saw arrives.

Updated:

Radar survey cart moving along an asphalt city street
A radar pass along the planned slot comes before the saw, not after.
Spray-painted utility marks on a road surface beside a kerb
Shallow services are painted on the road so the cutting crew can steer clear.
Narrow old city street lined with shops and overhead wires
Congested older streets hide the densest layers of shallow services.
Electromagnetic locator receiver sweeping over a buried cable path
EM sweeps confirm live street-light and service cables near the cut line.

What is micro trenching?

Micro trenching is a fibre installation method in which a narrow slot is cut into a paved road or footpath with a diamond saw or a dedicated trenching wheel, micro-ducts are laid at the bottom, and the slot is backfilled and sealed. Instead of an open trench wide enough for a worker, the cut is only a few centimetres across, and most of the road stays open to traffic as the work moves along.

Operators turn to micro trenching OFC methods mainly in towns and cities, where open trenching means long lane closures, heavy restoration and friction with road owners. It has become a useful tool for city fibre laying: last-mile and FTTH builds, links between cabinets and towers, and short runs across campuses. It does not replace HDD at a major road, rail or canal crossing, and it does not suit every street, as the sections below explain.

How does micro trenching OFC installation work?

Cutting the slot

A saw or rock wheel on a compact machine cuts a continuous slot along the marked line. Duct makers' guidance describes cuts from about 12 mm to 75 mm wide and up to roughly 600 mm deep, with the actual size set by the number of micro-ducts and the road owner's permission. A vacuum unit follows to lift spoil and dust from the slot.

Placing the micro-ducts

Single micro-ducts or bundles are pushed to the bottom of the slot. Corners are cut as gradual curves so each duct keeps its minimum bend radius. Where the slot meets a handhole or chamber, the ducts are led in and sealed.

Backfill and reinstatement

The slot is backfilled in layers, often with sand or a flowable fill, then sealed at the surface with a bituminous, cement-based or resin material matched to the road. Reinstatement matters as much as the cut: a poorly sealed slot lets water in and breaks up the pavement edge.

Blowing the cable

Slim micro cable is blown into the micro-ducts once a section is finished, much as standard cable is blown into larger duct.

Where does micro trenching suit, and where does it not?

Usually suitsUsually better avoided
Sound asphalt or concrete roads and footpathsCracked, patched or failing pavements
City streets where lane closures are costlyUnpaved verges, where an ordinary trench is simpler
FTTH lanes and short last-mile linksLong highway routes needing large ducts
Roads with no milling or relaying planned soonRoads due for milling, widening or deep relaying
Corridors with few shallow servicesStreets packed with shallow cables and loops

The road owner has the final word. Some agencies accept micro trenching on particular road classes with conditions on depth and reinstatement; others prefer conventional methods. Whatever the right of way permission states about cut size and finishing becomes the standard the work is inspected against.

Which micro trenching terms should planners know?

  • Micro duct – a small HDPE tube, from about 5 mm to a little over 20 mm across, made to take slim blown micro cable.
  • Micro cable – a reduced-diameter fibre cable designed for blowing into micro-ducts.
  • Slot or kerf – the narrow cut the saw leaves in the pavement.
  • Reinstatement – the backfill and surface seal that restore the road over the duct.
  • Bend radius – the tightest curve a micro-duct can follow; corners are cut gradually to respect it.
  • Cover – the depth of material above the duct, which decides its exposure to later road milling.

What are the utility risks of micro trenching?

A shallow cut sounds safe because it stays above most deep services, and that is precisely the trap. The upper layers of an Indian city road hold their own crowd of shallow services, laid over decades by different agencies:

  • Street-light and signal cables, often just below the surface along kerbs and medians.
  • Traffic detector loops cut into the carriageway at signalised junctions.
  • LT service cables and house connections crossing the road to properties.
  • Water service pipes and small plastic lines feeding buildings.
  • Earlier micro-ducts and shallow telecom ducts belonging to other operators.

A saw blade travelling through these lines cuts power, water or data at once, and a live cable strike also endangers the operator. The longer-term risk is the road itself: when it is later milled or resurfaced, a micro-duct with too little cover can be shredded, so the owner's resurfacing plans belong in the design.

Why should the cut line get a GPR scan before micro trenching?

Scanning the planned slot before cutting is the practical answer to those shallow risks. Ground penetrating radar with a higher antenna frequency resolves small, shallow targets well, and that is exactly the zone a micro trench occupies. EM locating confirms live cables, and the crew paints each find on the road so the saw operator can steer around it or stop.

A survey also tests whether micro trenching is the right method at all. If a street proves full of shallow services, a trench in the verge, a different street or a short bore may be safer. Our pre-excavation utility scanning covers short cut lines and work zones, while longer alignments are surveyed under the OFC route GPR survey. Where a major crossing interrupts the route, see how an HDD machine handles it instead.

How should micro trenching be planned and recorded?

  1. Check road class and plans. Confirm with the road owner that micro trenching is allowed and no milling or widening is due.
  2. Scan the cut line. Survey and mark shallow services before the saw arrives.
  3. Fix depth, width and reinstatement. Agree them in the permission, matched to the duct bundle.
  4. Plan handholes and turns. Place access points at junctions and branches, with gentle curves at corners.
  5. Cut, place and seal in short sections. Keep the open slot short so traffic and rain cannot damage it.
  6. Record the as-built. Note the slot line, cover depth and micro-duct count, tied to coordinates, and share it with the road owner.

Shallow micro-ducts are easy for the next agency to cut, so a shared record is the main protection such a route will ever have. The utility mapping page for telecom operators explains how survey data feeds operator records. To have a micro trench line scanned, send the street list or KML through the quote form below.

TIP 1

Scan before the saw

A high-resolution radar pass and EM sweep along the slot line find shallow cables and loops the blade would otherwise cut.

TIP 2

Ask about resurfacing plans

Roads due for milling or relaying can damage shallow micro-ducts, so check the owner's schedule before choosing the street.

TIP 3

Keep corners gradual

Cutting curves instead of sharp turns protects the micro-duct bend radius and keeps later cable blowing smooth and fast.

TIP 4

Seal sections promptly

Backfill and seal each section soon after cutting, because an open slot collects water and debris and weakens the pavement edge.

TIP 5

Share the as-built

Shallow ducts are easy targets for the next excavation, so give road owners a coordinate-tied record of the slot.

FAQ

Questions about micro trenching for fibre

How deep is a micro trench?

Depth varies with the road, the duct bundle and the owner's permission. Duct makers' guidance describes cuts up to roughly 600 mm deep, and many are shallower. Whatever the figure, the cover above the duct must survive future milling, so depth should be agreed with the road owner rather than chosen for speed.

Is micro trenching allowed on Indian roads?

That depends on the road-owning authority. Permission is granted or refused case by case through the right of way process, usually with conditions on depth, width and reinstatement. Some city roads suit the method well; heavily trafficked roads or those due for relaying may be refused. Confirm before designing a route around it.

Can micro trenching be done on unpaved ground?

It is designed for bound surfaces such as asphalt and concrete, which hold the slot walls and take the surface seal. In soil or loose verges the slot collapses and the method loses its advantage, so an ordinary narrow trench or small excavation is normally simpler there.

How is micro cable different from normal OFC?

It is slimmer and lighter, made to be blown into micro-ducts with small inside diameters, though fibre counts can still be substantial. Having little or no armour, it depends entirely on the micro-duct and the reinstated road for protection, which is why cover depth and records matter so much.

Does a GPR scan slow micro trenching down?

Not in practice. The cut line is usually scanned ahead of the cutting crew, section by section, so marks are ready when the saw arrives. The time involved is small compared with the delay that follows striking a live cable or water line in a busy street.

What does scanning a micro trench line cost?

Mezux bills GPR route scanning at ₹24 per metre, with a 4 km minimum per order, so short micro trench streets are usually grouped together. The L-section option at ₹32 a metre adds a depth profile of detected services. GST is extra, and night work, which city streets often need, is quoted separately.

Get a quote

Send your micro trench streets for a scan quote

What to send for an exact quote

  • Start and end points of the route, or a KML
  • District and site type
  • Survey type: standard or L-section
  • When you want the crew on site
Standard GPR₹24/m
L-Section GPR₹32/m

Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.

What happens next

  1. Scope check – we confirm route length, crossings and L-section need.
  2. Written quote – rate, slab, minimums, extras and a day-by-day programme.
  3. Mobilisation – our own crew and systems on the agreed date.

Get a Quote

Route length, location and survey type – we reply with a written quote.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks