Article — Call Before You Dig in India
Call Before You Dig in India – App, Rules and GPR Survey
India's CBuD platform connects people who dig with people who own buried assets. What it does, how to use it, what it cannot show, and how a field survey covers the gap.
₹24/m standard₹32/m L-sectionMin 4 km · GST extra
- STEP 1Register the dig plan
- STEP 2Owners get alerts
- STEP 3Scan the dig area
- STEP 4Mark before digging
Call Before You Dig in India works through the Department of Telecommunications' Call Before u Dig (CBuD) app and portal, launched in March 2023. Excavators register planned digging, and registered asset owners are alerted to respond. It warns owners but does not show exact positions or depths, so a GPR survey is still needed before trenching or HDD.
- CBuD was launched on 22 March 2023 and is run by the Department of Telecommunications.
- Excavators submit dig plans on a map, and registered asset owners receive SMS, email and app alerts.
- Uncoordinated digging was estimated to cause losses of about ₹3,000 crore a year in India.
- The app shares contacts and alerts, not the exact line or depth of any buried service.
- A GPR and EM survey with ground marking turns that warning into positions crews can dig around.
Updated:

What is Call Before You Dig in India?
Call before you dig is a simple idea: anyone planning to excavate should first tell the owners of buried assets in that area, so those owners can warn them or send staff. In India, this idea is put into practice through the Call Before u Dig app, usually shortened to CBuD.
The Department of Telecommunications developed CBuD with BISAG-N, and the Prime Minister launched it on 22 March 2023. At launch it was reported that uncoordinated digging and excavation causes losses of about ₹3,000 crore a year, much of it from cut optical fibre cables. The platform is available as an Android and iOS app and as a web portal.
Its purpose is excavation damage prevention: fewer utility strikes on fibre, power cables, water lines and gas pipelines, and less disruption to the services people rely on.
How does the Call Before u Dig app work?
For excavators
A company or agency that plans to dig registers once with its company name, mobile number, state, district and email, verified by OTP. For each job it submits a dig plan, marks the site on a map and gives the dates and purpose. The system then identifies the asset owners registered for that area.
For asset owners
Asset owners do not sign up on their own. Their user accounts are created by higher-level administrators in a chain from state to district level. Once set up, they receive alerts by SMS, email and in-app notification with the location, dates, purpose and type of enquiry.
Enquiry types and responses
- Emergency – a response expected within 48 hours.
- Normal – a response expected within 7 days.
Owners respond to show whether they have assets at the location, and the excavator tracks the status of each enquiry. The app also lets the excavator call an asset owner directly.
Which terms should excavators know?
- Excavator – in CBuD terms, the company or agency carrying out digging, not just the machine.
- Asset owner – the body that owns a buried utility, such as a telecom operator, DISCOM, water board or gas distributor.
- Utility strike – accidental damage to a buried service during digging or drilling.
- Excavation damage prevention – the set of steps, from notification to careful digging, that keeps strikes from happening.
- Pre-excavation survey – a field survey using GPR, EM locators and records to find services before work.
- Ground marking – paint or pegs showing the line of each detected service on site.
What can the CBuD app not tell you?
CBuD is a coordination tool. It is valuable, but it has clear limits that every site engineer should understand:
- No exact positions. An owner may confirm that it has assets in the area, but the alert does not draw the line of a cable or pipe on the ground.
- No depths. Depth of cover is not part of the exchange, and records held by owners may themselves be out of date.
- Only registered owners. Services of bodies not onboarded, private connections, factory lines and abandoned cables fall outside the alerts.
- Dependent on response. Protection depends on owners replying in time and sending accurate information or staff.
- No check of ground changes. Road widening, raised levels or earlier diversions are not visible through the app.
So the app tells you whom to contact. It does not tell your excavator where to stop. That gap is widest on old city roads, where several generations of services overlap, and on highway verges, where cables are often laid in long runs with few visible markers.
How should a safe dig be planned?
A practical dig safe India routine uses the app as one step among several:
- Register the dig plan on CBuD early, with an accurate map location and realistic dates.
- Collect owner records from those who respond, and note who confirms assets in the area.
- Survey the work area with GPR and an EM locator along the trench line, pits or bore path.
- Mark detected services on the ground and on a drawing, with approximate depth where it can be judged.
- Prove critical crossings by trial pit or hand digging; our guide on GPR versus trial pits explains when each is worth it.
- Brief the crew on marks and safe digging methods before machines start.
- Keep owners informed and invite their staff where their assets are close.
Why does call before you dig still need a GPR survey?
With ground penetrating radar (GPR), short radar pulses enter the soil and the instrument logs reflections from buried objects, including plastic pipes and ducts that carry no current. An electromagnetic cable locator traces metallic cables and pipes, especially where a signal can be applied. Together they turn a list of possible owners into lines on the ground.
A survey adds what the app leaves out:
- actual plan positions of services in the dig area, owned by registered bodies or not;
- approximate depths, with confidence stated for the local soil and moisture;
- unrecorded and abandoned services that no owner reported;
- a drawing that can be shared with every owner who responded.
Penetration depth is limited in wet clay or salty ground, so survey reports should flag uncertain stretches honestly. Our pre-excavation utility scanning service is built for this step, and the wider GPR survey page explains our route method. The difference between the two detection tools is set out in EM locator versus GPR.
Mezux is a survey company and is not part of, or affiliated with, the CBuD platform or the Department of Telecommunications.
What records should be kept after the dig?
- The CBuD enquiry reference and the responses received from each owner.
- The survey drawing and photographs of ground marks before excavation.
- Trial pit locations and measured depths.
- Any services exposed during work, with positions and depths noted.
- Details of any strike, how it happened and how it was reported.
These records protect the excavator in a dispute and help the next team on the same road. Our article on utility mapping and strike prevention looks at the site practices behind them.
Planning a trench, pit or HDD bore? Register it on CBuD, then send the route through the quote form. Scanning costs ₹24 per metre, GST extra, and a 4 km minimum applies; all slabs and extras are on the price list.
More guides on safe excavation
Questions about Call Before You Dig in India
Who runs the Call Before u Dig app?
The Department of Telecommunications runs it, having developed it with BISAG-N. It was launched by the Prime Minister on 22 March 2023 and is available on Android, iOS and the web. Asset owner accounts are created through state and district administrators, not by self sign-up.
Is the CBuD app free to use?
The DoT portal describes registration for excavators as a one-time process with no validity period. Check the current terms on the official portal before relying on this, as procedures can change over time. Any survey, marking or owner site visit that follows is a separate matter between you and that provider.
Does CBuD show where cables are buried?
No. It notifies registered asset owners about your planned dig and lets you contact them. Exact positions and depths come from owner records, a site visit by the owner, or a field survey with GPR and EM locators.
Can I start digging if no owner responds?
No response does not mean no assets. Unregistered services, private lines and abandoned cables are not covered, and an owner may simply be late. Survey the area, mark what is found and dig with care before relying on silence.
Do HDD contractors need to use CBuD?
Directional drilling disturbs the ground along the bore path and at both pits, so notifying owners is as relevant as for open trenching. Combine it with a pre-drilling survey of entry, exit and the route between them.
Can Mezux register my dig on CBuD?
Registration is done by the excavating company or agency. Mezux provides the survey that follows: GPR and EM scanning, ground marking and survey records, with drawings and L-sections quoted where needed. Share your CBuD enquiry reference with us so the survey covers the same area.
Pre-dig GPR surveys in Indian cities
- GPR survey company in Delhi
- Underground utility survey in Mumbai
- Ground penetrating radar survey in Bengaluru
- Cable and pipe detection in Chennai
- GPR survey in Hyderabad
- Kolkata GPR survey
- GPR survey company in Pune
- Underground utility survey in Ahmedabad
- Ground penetrating radar survey in Gurugram
- Cable and pipe detection in Noida
- GPR survey in Jaipur
- Lucknow GPR survey
- GPR survey company in Indore
- Underground utility survey in Bhopal
- Ground penetrating radar survey in Patna
- Cable and pipe detection in Chandigarh
- GPR survey in Nagpur
- Kochi GPR survey
- GPR survey company in Guwahati
- Underground utility survey in Bhubaneswar
Services to book once owners are alerted
- OFC laying works
- L-section GPR survey
- Site scan before excavation
- Water main leak survey
- Metro utility survey
- Pre-drilling bore path scan
- Highway crossing survey
- Water and sewer line survey
- Gas pipeline route survey
- Radar scanning for buried utilities
- Pavement & road void survey
- Sectors we survey for
- Road-cutting permission support
- Utility corridor mapping
- Pipe and cable locator services
- Buried utility mapping
- HT/LT underground cable mapping
- Utility mapping with CAD/GIS deliverables
- Road widening utility survey
- GPR mapping for electrical utilities
Send your dig plan for a survey
What to send for an exact quote
- Start and end points of the route, or a KML
- District and site type
- Survey type: standard or L-section
- When you want the crew on site
Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.
What happens next
- Scope check – we confirm route length, crossings and L-section need.
- Written quote – rate, slab, minimums, extras and a day-by-day programme.
- Mobilisation – our own crew and systems on the agreed date.