Skip to main content
ISO 9001:2015 · ISO 45001:2018

OFC & Telecom Route Survey — Pune, Maharashtra

OFC & Telecom Route GPR Survey in Pune

Finding a free lane for new fibre along crowded Pune road shoulders, and checking every bore under junctions and nalas, with radar systems and survey crews the company employs and owns.

₹24/m standard₹32/m L-sectionMin 4 km · GST extra

How it works · Finding room for Pune fibre
ChamberCrossingCrossingDUCT ROUTE CHECKED BEFORE TRENCH OR BORE
  1. STEP 1Duct route file shared
  2. STEP 2Both shoulders scanned
  3. STEP 3Free lane identified
  4. STEP 4Bores and pits marked
1.5 LAKH+ KMGPR Survey Completed
58Company-Owned GPR Systems
23 YEARSUnderground Since 2003
₹24/MStandard GPR Rate · Min 4 km
Quick answer

A telecom cable route survey in Pune scans the road shoulder where a new fibre duct will go, locating existing ducts, power cables, water lines and drains, and checks each HDD crossing. The rate is ₹24 a metre, or ₹32 with an L-section; a Pune order is never billed under 4 km or ₹1,00,000, and GST is added.

Rates and page checked:

Fibre ducts laid side by side in a shallow roadside trench
A new duct has to find room beside ducts other operators laid earlier.
Diagram of a drilled bore passing under a road between two pits
Each planned bore is scanned along its path and at both pit areas.
Ground penetrating radar cart being pushed along a road edge
Cart-mounted radar covers long shoulder stretches; handheld units take the tight spots.
Radar scan image showing curved reflections from several buried objects
Each hyperbola on the scan is checked before it is logged as a duct or cable.

What does a telecom cable route survey in Pune cover?

Fibre usually goes into a duct along the edge of a road, laid by narrow trench or by HDD, and that edge is exactly where water lines, power cables and older telecom cables already sit. A telecom cable route survey in Pune scans the edge before the duct goes in, so the contractor knows where a clear lane exists and where it does not. On each stretch our crew records:

  • fibre ducts and copper telecom cables belonging to other operators;
  • MSEDCL power cables, which a new duct must keep clear of;
  • water mains, sewers and drains under or beside the shoulder;
  • chambers, handholes and manholes that limit where a duct can turn;
  • places where rock appears close to the surface.

Our OFC route GPR survey service page explains the general method; the sections below deal with what matters on Pune routes.

How is duct feasibility checked on a Pune road?

Feasibility comes down to one question: is there a continuous strip, wide and deep enough, for the new duct? To answer it in an optical fiber route survey in Pune, we:

  1. scan both shoulders of the road, not only the side shown in the design, so an alternative is ready if the first side is full;
  2. add cross-lines at every chamber, culvert and junction where services change direction;
  3. note where shop ramps, compound walls or parked vehicles stopped the scan, so the gap is visible to the planner;
  4. flag places where rock seems to rise near the surface, since a shallow trench through basalt is slow going.

The outcome is a stretch-by-stretch picture of free and congested ground, which the designer uses to fix the final duct line and decide which sections are better bored. Our guide to GPR scanning for OFC routing covers the reasoning in more depth.

Trenchless utility survey in Pune: how are HDD crossings scanned?

Many fibre crossings in Pune are made by HDD – under main roads, nalas, rail lines and busy junctions where open cutting would halt traffic. A trenchless utility survey in Pune treats each crossing as a small site of its own:

  • Bore path. Radar lines run along and across the planned path to find services the drill head could hit.
  • Entry and exit pits. Both pit areas are scanned, because they are dug open and often sit beside other services.
  • Ground. Shallow basalt changes the drilling plan. Where radar shows a rock surface, the report notes it so the drilling contractor can plan tooling; a borehole can confirm it on request.

We run 18 HDD rigs of our own besides the GPR fleet, so our crews read a crossing with the drill in mind. HDD route survey services in Pune can be ordered with the duct route or on their own; the method is set out on our HDD route survey page.

Where do metro and municipal works affect a Pune fibre route?

Two kinds of works shape many routes in the city. Along Pune Metro corridors, utilities have been shifted and ground near piers and stations is controlled, so a fibre route beside them needs the metro's access approval and careful scanning around the relocated services. On roads maintained by Pune Municipal Corporation, recently relaid water or drainage lines may not yet appear on any drawing, and freshly backfilled trenches can give confusing radar returns; the report flags such stretches.

Permission from either body is obtained by the project owner. Mezux Touch is not affiliated with Pune Metro, Pune Municipal Corporation, MSEDCL or any telecom operator – we survey for whichever client places the order.

What does an OFC route survey in Pune cost?

Fibre routes are priced like any other route: ₹24 per metre for a standard survey, or ₹32 per metre if the operator wants an L-section depth profile as well. Since Pune lies beyond Delhi NCR, two floors apply – 4 km of billed length and ₹1,00,000 per project – and GST comes on top.

Fibre jobSurveyBefore GST
3.5 km campus linkStandard₹1,00,000 (4 km = ₹96,000, lifted to the floor)
15 km metro-side duct routeStandard₹3,60,000
15 km metro-side duct routeL-section₹4,80,000
600 km operator programmeStandard, 40% slab₹86,40,000

Slabs reduce every metre of the order: 25% off past 100 km, 40% past 500 km, 50% past 1,000 km. Crew travel, night-time working, permits or traffic management, and CAD/GIS drawing sets each sit on separate lines of the quote. The full slab table is on our price list.

Who else orders a telecom infrastructure survey in Pune?

Besides operators and their EPC contractors, a telecom infrastructure survey in Pune is often ordered by IT parks and data-centre sites checking where incoming fibre runs, by developers planning duct banks in new townships, and by FTTH contractors laying last-mile cable through housing areas. For water, sewer and power work in the city, see our main GPR survey in Pune page, and for the operator side of this work, our telecom operators sector page.

TIP 1

Survey both shoulders

On narrow Pune roads, ask for both edges to be scanned, so a second lane is ready if the first is already full.

TIP 2

List every bore

Mark each HDD crossing and its pit areas on the route file, so they get close lines rather than a passing scan.

TIP 3

Get metro approval first

Stretches beside Pune Metro piers need the metro's access approval before the crew arrives, otherwise they will be skipped.

TIP 4

Share old duct records

Even rough plans of existing operator ducts help us decide where to add cross-lines and check what the radar finds.

TIP 5

Group your links

Put campus links, feeder ducts and backbone stretches in one order so the combined length reaches a discount slab sooner.

Insights

Pune OFC route survey in numbers

Rate per metre by order size

Standard vs L-section GPR survey, ₹ per metre

StandardL-Section
₹0₹20₹40₹60₹80₹24₹32Up to 100 km₹18₹24100+ km₹14.4₹19.2500+ km₹12₹161,000+ km

Source: Mezux rate card, October 2026.

Standard survey cost for typical orders

Standard ₹24/m, ₹ lakh before GST, slab applied

₹0 L₹30 L₹60 L₹90 L₹120 L₹2.4 L10 km₹12 L50 km₹27 L150 km₹86.4 L600 km

Source: Mezux rate card – amounts before GST.

Our recorded output

Route surveyed, km

0 km300 km600 km900 km1200 km100 kmPeak day700 kmFastest 30 days

Source: Mezux delivery records.

Fact table

FactValueSource
Civic body maintaining most city roadsPune Municipal CorporationPublic record
Standard OFC route survey₹24 per metreMezux rate card
Route survey with L-section₹32 per metreMezux rate card
Minimum billing for Pune4 km and ₹1,00,000 per projectMezux rate card
GPR survey completed by Mezux1.5 lakh+ km in 28+ States/UTsMezux records

Mezux Touch is not affiliated with PMC, Pune Metro, MSEDCL or any telecom operator. Rates exclude GST.

Best prices

Get OFC Route Survey in Pune at Best Prices

Same rate for every kilometre

Backbone stretches, campus links and last-mile routes in Pune all bill at ₹24 a metre for the standard scan.

Crossings billed by the metre

HDD bore paths and pit areas are charged at the same metre rate as the rest of the route, measured on the scan length they need.

Batch short FTTH links

Many small links ordered together pass the 4 km and ₹1,00,000 floors once, instead of each link being billed at the minimum.

Big programmes, big cuts

Operator rollouts above 100 km get 25% off the entire order, 40% beyond 500 km and 50% beyond 1,000 km.

No hired radar

We run our own GPR systems and crews, so your Pune price carries no rental fee and no sub-contractor's margin.

Extras shown separately

Travel from Faridabad, any night shift, traffic control or permits, and drawing sets are added as distinct quote items.

Latest price list

OFC Route Survey Rates in Pune – October 2026

ServiceUp to 100 kmAbove 100 km
(25% off)
Above 500 km
(40% off)
Above 1,000 km
(50% off)
Standard GPR Survey
minimum 4 km
₹24/m₹18/m₹14.40/m₹12/m
L-Section GPR Survey
minimum 4 km
₹32/m₹24/m₹19.20/m₹16/m

Rates per running metre of route surveyed. GST extra. Discount applies to the whole order quantity once it crosses the slab. Outside Delhi NCR a ₹1,00,000 per-project minimum also applies. Mobilisation, night working, traffic and permission arrangements and drawing sets (CAD/GIS) are listed separately in the quote. Updated 23 October 2026.

Price range

Lowest rate₹12/mStandard, above 1,000 km
Highest rate₹32/mL-Section, up to 100 km
Minimum order4 km+ ₹1 lakh project minimum outside NCR
FAQ

Questions about OFC route survey in Pune

Can radar find empty plastic ducts with no cable inside?

Usually, yes. GPR responds to the contrast between the duct and the soil around it, so an empty HDPE duct normally shows up even though EM locating cannot detect it. Small ducts in wet clay or deep under made ground give weaker returns, and such targets carry a lower confidence grade in the report.

Can existing fibre be traced if it has a tracer wire or metal sheath?

Yes. A tracer wire or armoured sheath lets us apply an EM signal at an accessible point and follow the cable along the road with good accuracy. All-dielectric fibre with no tracer can only be found by radar, which picks up the duct rather than the fibre itself.

Do you survey inside IT parks and data-centre campuses?

Yes, under the campus's own entry and safety rules. Inside a site we usually scan on a grid instead of a single line, covering the approaches to buildings, meet-me rooms and gate entries. The scan lines are priced at the normal metre rate and Pune minimums.

Does a narrow-trench fibre route need a different survey?

No, the method is the same, but the result matters even more. A narrow trench is cut shallow and fast along the shoulder, so any service in that layer is likely to be hit. Scanning the full trench line first shows where the cutter must stop and where hand digging is safer.

Can the survey tell me whether a crossing should be bored or cut?

It gives you the facts that decide it: how many services cross the planned line, roughly how deep they lie and whether rock appears near the surface. The choice between HDD and open cut stays with the designer and the road owner, but it can be made on evidence rather than guesswork.

Do you send the findings to the road owner?

The signed report goes to the client who placed the order. Many clients attach it to their permission file or share it with the road owner, and they are free to do so. We do not send findings to any authority or operator on our own.

Get a quote

Send your Pune fibre route

What to send for an exact quote

  • The alignment as KML, drawing or road list
  • Town and type of site – public road, estate or plant
  • Whether the scope needs an L-section
  • Preferred start date and any night-only stretches
Standard GPR₹24/m
L-Section GPR₹32/m

Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.

What happens next

  1. Scope check – we confirm route length, crossings and L-section need.
  2. Written quote – rate, slab, minimums, extras and a day-by-day programme.
  3. Mobilisation – our own crew and systems on the agreed date.

Get a Quote

Route length, location and survey type – we reply with a written quote.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks