OFC Route Survey — Bengaluru
OFC & Telecom Route GPR Survey in Bengaluru
Fibre routes in Bengaluru have to thread past older ducts, live power cables and water mains. We scan the planned path, show where a new duct fits and check every bore line first.
₹24/m standard₹32/m L-sectionMin 4 km · GST extra
- STEP 1Fibre route file shared
- STEP 2Margins and chambers scanned
- STEP 3Free lane marked out
- STEP 4Bore paths cleared
A telecom cable route survey in Bengaluru runs GPR and EM locating along the planned OFC path, picking up the ducts, power cables, water lines and chambers already there, so the new fibre is laid where space exists and every HDD shot avoids other services. Rates: ₹24 per metre, minimum 4 km and ₹1,00,000 per project, GST extra.
Rates and page checked:

What does a telecom cable route survey in Bengaluru establish?
A telecom cable route survey in Bengaluru is ordered before fibre goes into the ground, by trench, micro-trench or HDD. Its job is to turn a route drawn on a map into one that can actually be built. Along the planned path it records:
- existing telecom ducts and cables, with any empty ducts the radar can pick out;
- BESCOM power cables, street-light circuits and earthing runs;
- BWSSB water mains, sewers and storm-water drains;
- chambers, handholes and manhole covers that reveal where buried networks run;
- stretches where the margin is already full and the route has to move.
The general method for fibre work is on our OFC route GPR survey page. Below we cover how it applies to Bengaluru roads, bores and exits. Mezux Touch has no affiliation with BESCOM, BWSSB, BMRCL, the city civic body or any telecom operator; we work for the contractor or owner who books the survey.
How do we check whether a new duct will fit?
Duct feasibility is a question of width as much as depth. On a Bengaluru arterial road the footpath and verge may already carry ducts from several operators, so we build the picture in stages:
- Longitudinal lines run the length of the proposed route on the side where the duct is meant to go, and on the opposite side if the client wants a fallback.
- Cross-lines cut across the margin at regular gaps and at every chamber or cover, showing how many services sit side by side.
- EM tracing follows metallic cables, armoured fibre and tracer wires, and confirms which reflections are live power.
- Interpretation combines the passes into a band of occupied ground and a lane, if one exists, wide enough for the new duct.
Where no lane exists, the report says so plainly and points to the nearest stretch where one does, or to where a bore beneath the crowded band is the practical answer.
Trenchless utility survey in Bengaluru: what is checked before an HDD shot?
Most fibre crossings under busy Bengaluru roads are drilled rather than dug. A trenchless utility survey in Bengaluru for each crossing covers three areas:
- the entry pit and exit pit, which must be clear of services before any excavation;
- the bore line, scanned along its length, so the drill can pass below or between existing services with room to spare;
- the ground on the path: where weathered granite or a rock-like reflector shows close to the planned bore depth, it is noted, because hard ground affects drilling.
Our HDD route survey services are the right choice when a project is mostly crossings, and we can drill the bores ourselves using company-owned HDD rigs, priced apart from the survey. Trial pits at critical crossings can be added on request.
Why do power cables and water mains matter on a fibre route?
Telecom ducts are light and shallow, which tempts route planners to treat the margin as free space. It rarely is. HT and LT cables often run in the same strip, and striking a live cable is a safety hazard as well as a delay. Water mains and sewers bring a different risk: a damaged pipe can wash out the trench and the road around it.
So the survey does not stop at telecom assets. Every detected service is marked on the ground, and the report lists which ones the fibre will run beside or cross, with approximate depths. That lets the design keep sensible clearance from power cables and plan crossings over or under pipes before the duct is ordered.
Optical fiber route survey in Bengaluru: city exits, metro stretches and FTTH
Fibre jobs in the city fall into a few types, each with its own focus:
- Long-haul exits. Routes leaving the city to join intercity corridors need the urban stretch surveyed in detail before the open highway section; our Bengaluru–Kolkata OFC corridor page describes that kind of work.
- Metro-side routes. Near Namma Metro alignments the scan stays inside the strip that BMRCL has permitted, during the hours it allows; the project owner arranges that permission.
- FTTH in layouts and campuses. Inner roads and apartment campuses need short drops surveyed across water, sewer and LT lines in a tight width, often with access arranged through the resident association or facility manager.
- Data-centre and enterprise links. These short, critical routes justify close line spacing across every junction they pass.
An optical fiber route survey in Bengaluru of any of these types follows the same metre rate.
What does a fibre route survey in Bengaluru cost?
The standard rate is ₹24 a metre of route (₹24,000 a km). If the work order requires a depth profile, the L-section survey is ₹32 a metre. A route shorter than 4 km is still charged for 4, and since the city sits outside Delhi NCR, ₹1,00,000 is the least any project is billed. GST is extra.
| Fibre route | Option | Before GST |
|---|---|---|
| 25 km metro ring | Standard | ₹6,00,000 |
| 25 km metro ring | L-section | ₹8,00,000 |
| 120 km of routes in one order | Standard, 25% slab | ₹21,60,000 |
Order size changes the rate for every metre: more than 100 km takes 25% off, more than 500 km takes 40% off, and more than 1,000 km halves it. The journey from Faridabad, after-dark shifts, traffic and permit arrangements and any CAD/GIS drawing set each carry a price of their own on the quote. See the GPR survey price list for the full card, or the Bengaluru GPR survey page for other work in the city.
Guides for fibre routing and OFC work
Bengaluru fibre route survey in numbers
Rate per metre by order size
Standard vs L-section GPR survey, ₹ per metre
Source: Mezux rate card, October 2026.
Standard survey cost for typical orders
Standard ₹24/m, ₹ lakh before GST, slab applied
Source: Mezux rate card – amounts before GST.
Our recorded output
Route surveyed, km
Source: Mezux delivery records.
Fact table
| Fact | Value | Source |
|---|---|---|
| Metro rail operator in Bengaluru | BMRCL (Namma Metro) | Public record |
| Standard OFC route survey | ₹24 per metre | Mezux rate card |
| Discount on orders above 100 km | 25% on every metre | Mezux rate card |
| Company-owned HDD rigs | 18 | Mezux records |
| GPR survey completed by Mezux | 1.5 lakh+ km in 28+ States/UTs | Mezux records |
Mezux Touch is not affiliated with BMRCL, BESCOM, BWSSB or any telecom operator.
Get OFC Route Survey in Bengaluru at Best Prices
Fibre priced by the metre
Every metre of your planned OFC route costs ₹24 to scan, whether it runs along a layout road or a crowded arterial.
Profile only on request
Move to the ₹32 L-section rate only for routes whose work order demands depth along the alignment.
Rings and spurs together
Combine city rings, enterprise spurs and FTTH drops in one Bengaluru order to share a single trip from Faridabad.
Long programmes cost less
A rollout crossing 100 km earns 25% off all of it; 500 km and 1,000 km raise that to 40% and 50%.
Survey and drill, one firm
Scanned bore paths can be drilled by our own HDD rigs, avoiding a hand-over between separate survey and drilling contractors.
No surprise line items
Mobilisation, night shifts, traffic and permit work and drawing sets are stated at quotation, before any crew is booked.
OFC Route Survey Rates in Bengaluru – October 2026
| Service | Up to 100 km | Above 100 km (25% off) | Above 500 km (40% off) | Above 1,000 km (50% off) |
|---|---|---|---|---|
| Standard GPR Survey minimum 4 km | ₹24/m | ₹18/m | ₹14.40/m | ₹12/m |
| L-Section GPR Survey minimum 4 km | ₹32/m | ₹24/m | ₹19.20/m | ₹16/m |
Rates per running metre of route surveyed. GST extra. Discount applies to the whole order quantity once it crosses the slab. Outside Delhi NCR a ₹1,00,000 per-project minimum also applies. Separate from the per-metre rate: mobilisation, night shifts, traffic or permission arrangements and CAD/GIS drawings. Updated 23 October 2026.
Price range
Questions about OFC route survey in Bengaluru
Can radar find an empty HDPE duct with no fibre inside?
Often, if the duct is large enough and the soil contrast is good. An empty duct reflects radar because the air inside differs from the soil. Small ducts deep in wet or rocky ground are harder to see, and the report marks those finds with lower confidence.
Does the survey tell us which operator owns a duct?
Not directly. Radar shows where a duct is, not whose it is. Ownership can sometimes be inferred from chamber covers, markers or records shared by the client, and the report names an owner only where evidence supports it.
Is micro-trenching surveyed differently from normal trenching?
The scan is similar, but the focus shifts to the top layer. A micro-trench is shallow, so shallow cables, ducts and old road layers close to the surface matter most, and line spacing is set to resolve them. The rate stays the same per metre.
Can you survey a fibre route through a tech park?
Yes, after the campus completes its access and induction process. Internal roads usually carry the park's own power, water and fibre networks, managed by facility staff, so their layouts help plan the scan. Billing follows the standard metre rate and minimums.
Do you also lay the duct after the survey?
We run 18 company-owned HDD rigs and can drill crossings or bore sections of a route. Duct laying and drilling are separate contracts from the survey and quoted on their own. Many clients use the survey alone and lay the duct with their own team.
What happens where the margin has no room left?
The report flags that stretch and shows the nearest options: the other side of the road, a deeper bore beneath the crowded band, or a short diversion. The final choice rests with the network designer and the road authority.
OFC route survey in other cities
- Ground penetrating radar survey in Delhi
- Cable and pipe detection in Mumbai
- GPR survey in Chennai
- Hyderabad GPR survey
- GPR survey company in Kolkata
- Underground utility survey in Pune
- Ground penetrating radar survey in Ahmedabad
- Cable and pipe detection in Gurugram
- GPR survey in Noida
- Jaipur GPR survey
- GPR survey company in Lucknow
- Underground utility survey in Indore
- Ground penetrating radar survey in Bhopal
- Cable and pipe detection in Patna
- GPR survey in Chandigarh
- Nagpur GPR survey
- GPR survey company in Kochi
- Underground utility survey in Guwahati
- Ground penetrating radar survey in Bhubaneswar
- Cable and pipe detection in Ranchi
Other survey and trenchless services
- Utility mapping for telecom operators
- Optical fibre route survey
- GPR scanning services
- Cavity detection survey
- Corridor utility survey
- GPR survey for EPC contractors
- Leak zone detection
- Cable route L-section survey
- Subsurface utility engineering (SUE)
- GPR survey for water boards
- Building site utility scan
- GPR survey for city gas networks
- Highway utility survey
- GPR survey for every sector
- GPR mapping for electrical utilities
- GPR survey for metro rail
- OFC laying works
- HDD route survey
- Utility strike prevention survey
- Highway crossing survey
Send your Bengaluru fibre route
What to send for an exact quote
- The alignment as KML, drawing or road list
- Town and type of site – public road, estate or plant
- Whether the scope needs an L-section
- Preferred start date and any night-only stretches
Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.
What happens next
- Scope check – we confirm route length, crossings and L-section need.
- Written quote – rate, slab, minimums, extras and a day-by-day programme.
- Mobilisation – our own crew and systems on the agreed date.






