ISO 9001:2015 · ISO 45001:2018

GPR Survey — East Delhi

GPR Survey in Mayur Vihar, East Delhi — Underground Utility Detection

Built on the Yamuna's old floodplain — soft ground, a high water table, and settlement that shows up in the services before it shows on the surface.

1.5 LAKH+ KMGPR Survey Completed
100 KM/DAYPeak Survey Output
700 KMFastest 30-Day Delivery
NO MINIMUMOrder Value in Delhi NCR

Owned fleet only: 1.5 lakh+ km delivered, 100 km a day peak output and a best month of 700 KM in 30 days. No minimum order value applies here — this is inside NCR and our yard is in Faridabad. Elsewhere in India the figure is ₹1,00,000 per project.

Quick AnswerMezux Touch runs GPR survey across Mayur Vihar Phase I, II and III, the Trilokpuri and Kalyanpuri belt, the Noida Link Road corridor and the approaches to the Yamuna floodplain. Soft floodplain deposits and a shallow water table govern both the survey and the works that follow.

Floodplain ground, and what it does

Mayur Vihar sits on old Yamuna floodplain deposits — fine, soft and saturated relatively close to the surface. Both properties work against radar, so achievable investigation depth here is measurably less than on the harder ground west of the river.

We assess before mobilising and state the depth achievable for the specific location rather than offering a citywide figure. Where a design decision needs confidence below what radar will reach in this ground, complementary locating or selective verification is the honest recommendation, made at scoping rather than after an inconclusive report.

Groundwater also varies seasonally with the river, so the same route surveyed in different months can read differently. The report carries the condition on the survey date for that reason.

Settlement shows in the services first

Soft ground settles, and buried services settle with it — unevenly, following the fill depth and loading above them. A pipe laid level twenty years ago is not necessarily level now.

That matters for gravity drainage in particular, where a small loss of fall causes standing water long before anything is visible on the surface. Depth profiling along a sewer run frequently explains a drainage complaint that nobody could otherwise account for.

We record cover continuously rather than sampling, because on this ground the variation between points is the finding.

Voids and washouts around drainage

Saturated soft ground and leaking drainage together produce loss of fines, and the cavities that result are a recurring find here rather than an exception.

These are reported separately from the utility plan because they describe a structural risk to the road or slab above rather than the position of a service. On this ground a void found early is considerably cheaper than the collapse it would have become.

The DDA pockets and the link corridor

The planned pockets were serviced as coherent schemes and their layouts are a reasonable starting position, though decades of connections have drifted from them. The resettlement colonies nearby have a denser and far less documented pattern.

The Noida Link Road corridor carries trunk servicing alongside heavy traffic and the metro alignment, with night-only working windows and diversions from metro construction that moved services from their recorded positions.

Approvals and deliverables

Work may involve the municipal corporation, the development authority on planned pockets, the PWD on arterials, the metro corporation on its alignment and the irrigation and flood control department near the floodplain.

Output is layered CAD with depth annotation, GIS files where kept, a PDF issue set and a report carrying achievable depth by section, the continuous cover profile and any void findings as separate schedules.

Sectors that call us in here

Civic and drainage work leads, much of it investigating settlement and standing water where the cause sits below the surface rather than on it.

Construction plot surveys follow, where bearing conditions matter as much as utility positions, with telecom corridor work along the link road making up the rest.

Delivery Record

What our own fleet has actually delivered

1.5 LAKH+ KMGPR Survey Completed

Twenty-two years of subsurface work adds to this figure — corridor survey, plot clearance, civic mapping and plant scanning across 28+ States/UTs.

UP TO 100 KMDaily Survey Output

Peak sustained daily output on open corridors running day and night shifts on our own fleet. On floodplain ground the constraint is achievable depth, so confidence rather than kilometres is the useful measure.

700 KMSurveyed in 30 Days

Seven hundred kilometres in thirty days, which works out above 23 km every working day of that month.

250 KMSurveyed in 30 Days

A second month at scale, on different ground, with the same crews and the same owned systems.

14Company-Owned GPR Systems

Fourteen systems bought rather than hired, operated by staff on our own payroll.

22 YEARSUnderground Since 2003

More than two decades of underground work, certified across quality, environment and occupational health and safety.

Season and the river

Groundwater here follows the Yamuna and rises noticeably through the monsoon, which reduces achievable depth on the floodplain-side stretches.

Where a programme allows, we survey outside those months. Where it does not, the report states which stretches were collected under high-water conditions rather than presenting a uniform confidence.

Other GPR work we carry out here

Related work locally includes pavement thickness and road void detection, underground pipeline detection and construction site GPR survey.

Frequently asked questions

Because floodplain deposits are fine, soft and saturated relatively close to the surface, and both properties absorb radar energy. We state the depth achievable for your specific location rather than a citywide figure.

Yes, unevenly, following fill depth and loading above them. A pipe laid level twenty years ago may not be level now, which is why we record cover continuously rather than sampling.

Frequently. A small loss of fall on a gravity run causes standing water long before anything is visible above ground, and depth profiling along the run often accounts for a problem nobody could otherwise explain.

Regularly. Saturated soft ground plus leaking drainage causes loss of fines, and the resulting cavities are reported separately because they are a structural risk to the surface above, not a utility position.

As a starting position, yes — they were serviced as coherent schemes. Decades of connections have drifted from them, so we field-verify rather than trust them outright.

No minimum applies. Mayur Vihar is within Delhi NCR where our crews are based, so any size of job is viable. Outside NCR the floor is Rs 1,00,000 per project.

Corridor peak is up to 100 km a day across double shifts, our record month is 700 KM in 30 days, and we have surveyed more than 1.5 lakh km in total. On floodplain ground like this the constraint is achievable depth rather than distance covered, so the useful measure is confidence, not kilometres.

Cracks, dips or standing water in Mayur Vihar?

Describe what the surface is doing and we will look for the void that usually sits wider than the symptom.

Get a Survey Quote+91 99100 10209

GPR survey in Mayur Vihar — deliverables, ground data and detailed questions

Mayur Vihar sits on soft Yamuna floodplain deposits, fine and saturated relatively close to the surface. Against that material, achievable depth is typically 1.5 to 2.5 metres, among the more limited ranges in Delhi. That ceiling, not the coverage rate, determines whether the drawing can carry your design decision. When your requirement exceeds what this ground permits, we set that out in writing before mobilising.

How the survey is run here

The survey pattern in Mayur Vihar is set from the ground conditions upward. We add perpendicular runs wherever a single pass could not tell ground from plant. Calibration follows the route, because one velocity across changing ground makes the depth figures meaningless. Crews, systems and interpretation are all in-house, with nothing critical sub-let.

What you receive

Layered CAD in DWG to your drawing convention, with every detected service on its own layer carrying depth, detection method and a confidence grade as attributes. Where a GIS exists we deliver into it as SHP or KML, and a PDF issue accompanies every package. A signed report setting out coverage achieved, section depths, access refusals and every limitation that bears on the drawing. On Mayur Vihar work the report also records the authorities involved — the east corporation zone, DDA on planned pockets, PWD, DMRC, the irrigation and flood control department near the floodplain — because the deliverable has to satisfy whichever of them receives it. Underlying records are archived, so any line on the drawing remains traceable to the measurement that produced it.

Beyond the basics

Why is achievable depth lower? Because floodplain deposits are fine, soft and saturated close to the surface, and both properties absorb radar energy.

Do services really move on this ground? Yes, unevenly with fill depth and loading above. We record cover continuously rather than sampling, because the variation is the finding.

Can that explain a drainage complaint? Frequently. A small loss of fall on a gravity run causes standing water long before anything shows above ground.

Do you find voids here? Regularly. Saturated soft ground plus leaking drainage moves fines out, and the resulting cavity is a structural risk to the surface.

Can the survey be phased across a programme? Yes, and on long corridors it usually should be. Surveying immediately ahead of each construction front gives fresher data than one pass months in advance.

Terms used on this page

Floodplain deposit — fine soft material laid by river flooding, absorbent to radar and compressible under load. Loss of fines — the washing out of small particles from soil, which leaves a cavity behind. Cover profile — a continuous record of depth along a run, which reveals settlement that spot measurements miss. Line spacing — the distance between adjacent survey lines; closer spacing finds smaller targets and costs more. Dielectric — the electrical property of ground that determines radar velocity, and therefore how a reflection converts to depth.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks