HT/LT Cable Route Survey — Delhi

HT/LT Cable Route GPR Survey in Delhi

Before a new 11 kV feeder or LT cable goes into a Delhi road, we locate the cables, pipes and ducts already in its path and mark every crossing for the trenching or HDD team.

₹24/m standard₹32/m L-sectionMin 4 km · GST extra

How it works · Clearing a feeder path
LT cableWater mainHT cableOFC ductDrainL-SECTION · DEPTH ALONG THE ROUTERoute startRoute end
  1. STEP 1Feeder alignment received
  2. STEP 2Radar and EM passes
  3. STEP 3Crossings marked on road
  4. STEP 4Depth profile if ordered
1.5 LAKH+ KMGPR Survey Completed
58Company-Owned GPR Systems
23 YEARSUnderground Since 2003
₹24/MStandard GPR Rate · Min 4 km
Quick answer

An electric cable route GPR survey in Delhi finds what is already buried along a planned HT or LT cable path – other power cables, water and sewer lines, telecom ducts – and marks each with its approximate depth. Mezux Touch charges ₹24 per metre, or ₹32 with an L-section, on a 4 km minimum; GST extra.

Rates and page checked:

Crew unloading a radar cart beside a road ahead of a cable survey
A Delhi feeder survey starts where the cable will leave its substation or RMU.
Illustration of a distribution substation with cables leaving underground
Outgoing cable bunches near substations are scanned on a tighter line spacing.
Diagram of a new cable route crossing existing buried services
Each point where the new feeder meets an existing service is listed separately.
Long-section drawing showing depths of services along a cable route
An L-section adds the depth of each detected service along the feeder path.

What does an electric cable route GPR survey in Delhi cover?

The job is narrow and practical: before a new HT or LT cable is laid, find out what already occupies the strip it will run through. An electric cable route GPR survey in Delhi follows the proposed alignment from the source – a grid substation, a ring main unit or a feeder pillar – to the far end, and records every service the new cable will meet or run beside.

Along a typical Delhi feeder path we look for:

  • existing 11 kV, 33 kV and LT cables, often several laid side by side;
  • street-light and signal cables near the kerb;
  • water mains, sewers and storm drains crossing the road;
  • telecom cables and fibre ducts of more than one operator;
  • gas pipelines where a city gas network is present.

Each find is marked on the ground and written into a signed report with its approximate depth. The general method is explained on our HT/LT cable route GPR survey page; this page deals only with cable routes inside Delhi. For other work in the capital, start from the Delhi GPR survey page.

How do Delhi's distribution areas affect a cable job?

Four networks share the city. BSES Rajdhani covers south and west Delhi, BSES Yamuna east and central Delhi, Tata Power-DDL north and north-west Delhi, and NDMC the New Delhi area. A cable contractor working for one of them usually stays inside that area, but a long feeder near a boundary can still pass close to another network's cables.

Three things follow for the survey:

  • Records come in different forms. Ask the network that owns the new cable for its existing drawings, and expect gaps where older lines were never updated.
  • Neighbouring owners matter. Water, sewer and telecom services under the same road belong to other bodies, and their crossings are marked just as carefully.
  • The road owner may differ again. MCD, NDMC or PWD can control the carriageway, which affects working hours and traffic arrangements.

Mezux Touch is not affiliated with BSES Rajdhani, BSES Yamuna, Tata Power-DDL, NDMC, MCD or any other authority; contractors and consultants engage us for the survey.

Which crossings on a Delhi feeder route need extra passes?

Most of a cable route is scanned with continuous lines along its length. Certain points get a closer grid, because that is where strikes and redesigns usually happen:

  1. Arterial road crossings. Services converge at junctions, and a crossing is often bored by HDD, so the bore path and both pit areas are scanned.
  2. Near DMRC metro alignments. Elevated sections bring pier foundations close to the road edge; underground sections bring station boxes and diverted services. Permission to work there is arranged by the project owner with DMRC.
  3. Drains and nalas. The designer needs to know whether the cable can pass under or must go over, so the drain bed and side walls are recorded.
  4. Railway crossings and Yamuna approaches. Routes towards the river bridges cross softer, wetter floodplain ground where radar reach drops, and the report states the depth achieved there.

Scanned bore paths feed straight into crossing design; our HDD route survey page explains how the drilling team uses them.

Can underground electrical line tracing in Delhi pick out live cables?

Usually, yes. Underground electrical line tracing in Delhi uses two tools together. An EM locator detects the field around a cable carrying load, and can also follow a cable that is fed a signal from an accessible point. Radar then shows the line's position and approximate depth, and finds non-conductive services the EM locator cannot.

Harder cases are common in older parts of the city: four or five cables bunched in one trench, abandoned lines left beside new ones, and cables laid beneath later road layers. When lines run too close together to separate, the report says so plainly instead of drawing a confident single line. HT cable route mapping in Delhi is only as useful as that honesty, and a trial pit at a critical point can confirm what the instruments suggest. Our article on how GPR traces HT and LT cables covers the method in more detail.

Does your cable work order call for an L-section?

Some distribution work orders ask only for a route survey with marked crossings. Others ask for an L-section as well – a depth profile of the services detected along the cable path. The scan is done in the same visit; only the rate changes, from ₹24 to ₹32 per metre. If your order mentions an L-section, tell us when you ask for the quote. The L-section GPR survey page explains what the profile shows.

What does an electric grid underground survey in Delhi cost?

Billing follows route length. Because Delhi is inside NCR, there is no per-project minimum; the only floor is 4 km of survey, so a short cable link is charged as 4 km. GST is added to the invoice.

Cable jobSurvey typeValue before GST
1.2 km LT linkStandard, billed on 4 km₹96,000
9 km 11 kV feederStandard at ₹24/m₹2,16,000
9 km 11 kV feederL-section at ₹32/m₹2,88,000
140 km cabling packageStandard, ₹18/m after 25% slab₹25,20,000

The slab is decided by the whole order: 25% off past 100 km, 40% off past 500 km and 50% off past 1,000 km, applied to every metre. Mobilisation, night-shift working, traffic arrangements and permissions, and CAD/GIS drawing sets are quoted as separate lines. All slabs appear on our GPR survey price list.

STEP 1

Share the feeder alignment

Send the KML or route drawing, cable voltage, planned method – open trench or HDD – and the substation or RMU at each end.

STEP 2

Collect network records

Ask the distribution network owning the new cable for existing drawings, and add any water, sewer or telecom records you hold.

STEP 3

Scan and trace

Our crew runs radar lines along the feeder path and uses EM tracing to follow live cables at junctions and crossings.

STEP 4

Mark every crossing

Each place where the new cable meets an existing service is painted or pegged on the road with its approximate depth.

STEP 5

Issue the signed report

The report lists finds by position, depth reached per section and gaps, plus the L-section profile when that was ordered.

Insights

Delhi cable route survey in numbers

Rate per metre by order size

Standard vs L-section GPR survey, ₹ per metre

StandardL-Section
₹0₹20₹40₹60₹80₹24₹32Up to 100 km₹18₹24100+ km₹14.4₹19.2500+ km₹12₹161,000+ km

Source: Mezux rate card, October 2026.

L-section survey cost for typical orders

L-section ₹32/m, ₹ lakh before GST, slab applied

₹0 L₹40 L₹80 L₹120 L₹160 L₹3.2 L10 km₹16 L50 km₹36 L150 km₹115.2 L600 km

Source: Mezux rate card – amounts before GST.

Our recorded output

Route surveyed, km

0 km300 km600 km900 km1200 km100 kmPeak day700 kmFastest 30 days

Source: Mezux delivery records.

Fact table

FactValueSource
Distribution networks in DelhiBSES Rajdhani, BSES Yamuna, Tata Power-DDL, NDMCPublic record
Cable route survey rate₹24/m standard · ₹32/m with L-sectionMezux rate card
Minimum billing inside Delhi NCR4 km of surveyMezux rate card
140 km cabling package (25% slab)₹25,20,000 before GSTMezux rate card
Company-owned GPR systems and HDD rigs58 GPR systems, 18 HDD rigsMezux records

Mezux Touch is not affiliated with any Delhi distribution company, MCD, NDMC or DMRC.

Best prices

Get HT/LT Cable Route Survey in Delhi at Best Prices

₹24 a metre for feeders

A standard Delhi feeder route survey is billed per metre of alignment, so a 9 km route comes to ₹2,16,000 before GST.

Depth profile in one visit

When the work order wants an L-section, the same crew scans and profiles together at ₹32 a metre, with no second trip.

Short links, simple floor

A cable link under 4 km is billed as 4 km and nothing more, because Delhi orders carry no per-project minimum.

Packages earn whole-order slabs

Group several feeders into one order: beyond 100 km every metre is 25% cheaper, beyond 500 km 40%, beyond 1,000 km half.

Own crews from Faridabad

Our radar systems and crews are based in Sector 41, Faridabad, so a Delhi cable job needs no hired equipment or sub-letting.

Separate lines, no surprises

Mobilisation, night shifts, traffic arrangements or permissions and CAD/GIS drawings appear on the quote as their own priced items.

Latest price list

HT/LT Cable Route Survey Rates in Delhi – October 2026

ServiceUp to 100 kmAbove 100 km
(25% off)
Above 500 km
(40% off)
Above 1,000 km
(50% off)
Standard GPR Survey
minimum 4 km
₹24/m₹18/m₹14.40/m₹12/m
L-Section GPR Survey
minimum 4 km
₹32/m₹24/m₹19.20/m₹16/m

All rates are per metre of route surveyed and before GST. Once an order passes a slab, the lower rate applies to every metre of it. Sites outside Delhi NCR also carry a ₹1,00,000 project minimum. Separate from the per-metre rate: mobilisation, night shifts, traffic or permission arrangements and CAD/GIS drawings. Updated 23 October 2026.

Price range

Lowest rate₹12/mStandard, above 1,000 km
Highest rate₹32/mL-Section, up to 100 km
Minimum order4 km+ ₹1 lakh project minimum outside NCR
FAQ

Questions about HT/LT cable route survey in Delhi

Can you trace a cable that is switched off?

Radar does not need current, so a dead cable can still show up as a buried line. EM locating needs a signal; if the cable can be reached at a pillar or joint, a signal can be fed into it. Abandoned cables with no access point are found by radar alone, with lower identification confidence noted.

Do you work for the DISCOMs or for contractors?

We take orders from whoever needs the survey – cabling contractors, EPC firms, consultants and property owners. Mezux Touch has no affiliation, empanelment or approval with any Delhi distribution company. Our report goes to the client who placed the order, who can share it with the network as their contract requires.

Does the 4 km minimum apply to a short cable link?

Yes. A 1.2 km LT link is billed as 4 km, which at ₹24 a metre is ₹96,000 before GST. Inside Delhi NCR there is no ₹1,00,000 project minimum on top. If you have other short links coming up, sending them together uses the 4 km more efficiently.

Can you scan inside a substation or RMU yard?

Yes, where the owner allows access. Inside a yard we scan on a grid rather than a single line, because outgoing cables, earthing and drainage cross in many directions. Entry permits and safety rules come from the owner, and the scan is priced at our normal metre rate on the lines needed.

Will the survey show where to place joint bays?

The survey shows where existing services are, which tells the designer where a joint bay or pit can go without clashing. Choosing joint positions is a design decision for the cable contractor or consultant. We can scan proposed pit locations more closely if you mark them on the route.

What should we send to get a quote?

The route as a KML or drawing, the total length, cable voltage and size, whether it will be trenched or bored, the crossings already known and the survey wording in your work order. Mention if drawings in CAD or GIS are required, as those are quoted separately.

Get a quote

Send your Delhi feeder route

What to send for an exact quote

  • Start and end points of the route, or a KML
  • District and site type
  • Survey type: standard or L-section
  • When you want the crew on site
Standard GPR₹24/m
L-Section GPR₹32/m

Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.

What happens next

  1. Scope check – we confirm route length, crossings and L-section need.
  2. Written quote – rate, slab, minimums, extras and a day-by-day programme.
  3. Mobilisation – our own crew and systems on the agreed date.

Get a Quote

Route length, location and survey type – we reply with a written quote.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks