ISO 9001:2015 · ISO 45001:2018

GPR Survey — Industrial Delhi

GPR Survey in Okhla Industrial Area — Utility Mapping & Detection

Three industrial phases, multiple authorities and decades of process, power and effluent lines laid by whoever needed them at the time.

1.5 LAKH+ KMGPR Survey Completed
100 KM/DAYPeak Survey Output
700 KMFastest 30-Day Delivery
NO MINIMUMOrder Value in Delhi NCR

1.5 lakh kilometres and counting, a sustained ceiling of 100 km a day, and a record month of 700 KM in 30 days — every metre on our own equipment. No minimum order value applies here — this is inside NCR and our yard is in Faridabad. Elsewhere in India the figure is ₹1,00,000 per project.

Quick AnswerMezux Touch carries out Ground Penetrating Radar survey across Okhla Industrial Area Phases I, II and III, the Jamia and Sarita Vihar approaches and the connecting South-East Delhi corridors. Industrial ground here carries a mix of heavy power distribution, water and effluent lines, and telecom laid across several decades under different agencies. Scope includes plot and plant-level utility mapping, OFC corridor survey, pre-excavation clearance and depth confirmation for trenchless crossings.

Industrial ground, industrial record-keeping

Okhla's three phases were developed and administered across a long period and by more than one agency, and the subsurface record is fragmented in exactly the way that history predicts. Heavy electrical distribution serving industrial loads, process and effluent lines running to and from individual plots, water supply, drainage and telecom all occupy the same margins.

Individual units have added, abandoned and rerouted their own connections over decades. A plot that has changed hands or changed use several times will often have services beneath it that nobody currently on site knows about, because the people who laid them left with the previous occupier.

This is why plot-level surveys here regularly find more than the client expected — and why finding it before an excavator does is the entire economic case for the work.

Multi-authority corridors

Working across Okhla means dealing with more than one body on a single route. Industrial estate administration, the municipal authority and the public works department each hold responsibility over different stretches, with their own permission formats and restoration standards.

Our own delivery record here includes a 67-kilometre corridor executed across exactly this kind of multi-authority ground, and the lesson from it is straightforward: the survey drawing has to be prepared in a form each body will accept, or the file stalls regardless of how good the fieldwork was.

Our liaison desk works from the same drawing the survey crew produced, so the technical record and the permission file do not diverge.

Plant-side and effluent line work

Beyond corridors, individual units bring us in for plant-area surveys — locating process lines, buried tanks, effluent runs and power feeds before a foundation, an extension or a new machine base is excavated.

Buried tanks and disused chambers are a recurring find in industrial ground, and they matter beyond the immediate excavation: an unrecorded tank is a contamination and a structural question at once. We report these as distinct findings rather than folding them into a generic anomaly list.

Deliverables for industrial clients

Plant clients generally want a maintained record rather than a one-off clearance, so output is issued as GIS layers alongside the CAD drawing, with services attributed by type and a schedule of chambers, valves and access points. Where a unit is preparing for expansion or sale, that record becomes an asset document in its own right.

Safety controls on industrial ground

Excavation in an industrial estate carries hazards that ordinary road work does not — live heavy electrical distribution, process lines that may carry hot or aggressive fluids, and effluent runs whose contents are not always documented. The survey exists partly to prevent a strike and partly to tell the excavating crew what they would be striking.

Where a target is identified as probable process or effluent rather than utility, we say so on the drawing, because the response to breaching one is different from the response to cutting a water line. Where a plot's history suggests buried tanks, we recommend the client treat unconfirmed anomalies as suspect until physically checked.

Work inside an operating unit runs under that site's permit system with excavation and hot-work clearances obtained before scanning starts, and our crews carry the induction and PPE standards that industrial clients require as a condition of entry.

Why industrial plot surveys pay for themselves

The economics on an industrial plot are different from a road corridor. A strike on a live process line does not just cost a repair — it stops a production line, and the downtime bill dwarfs both the repair and the survey that would have prevented it. Units that have lost a shift to an unrecorded cable rarely question the scope on the next excavation.

There is a second, slower return. A plot with a properly mapped subsurface is easier to extend, easier to insure and considerably easier to sell or lease, because the buyer is not pricing in an unknown. We see this most clearly when a unit changes hands and the incoming operator commissions exactly the survey the outgoing one never did.

Track Record

Numbers we can put a project name against

1.5 LAKH+ KMGPR Survey Completed

Delivered since 2003 across every sector that puts something below ground, in 28+ States/UTs, on company equipment throughout.

UP TO 100 KMDaily Survey Output

Peak sustained daily output on open corridors running day and night shifts on our own fleet. Industrial servicing layered over decades makes interpretation the slow part rather than the fieldwork.

700 KMSurveyed in 30 Days

The month that set our record: 700 KM completed, no rented systems, no borrowed crews.

250 KMSurveyed in 30 Days

Completed in its own month on a separate contract — evidence that the first record was not a single push.

14Company-Owned GPR Systems

Owned outright and operated by our own crews, which removes the single most common cause of a survey start slipping.

22 YEARSUnderground Since 2003

Underground since 2003, across telecom backbone, civic mapping, industrial plant and utility networks — all under triple-ISO certified systems.

Related survey work in this area

The same equipment covers underground cable detection, underground pipeline detection and construction site GPR survey in this area.

Frequently asked questions

That is the normal case here and one of the main reasons to survey. Services laid by previous occupiers are frequently undocumented, and radar finds them where the material contrast allows. Anything ambiguous is flagged rather than cleared.

Yes, and we report them as specific findings rather than generic anomalies. An unrecorded tank is both a structural and a contamination question, so it deserves to be called out clearly.

We map jurisdiction along the route before drafting any application, then prepare the drawing in each body's accepted format. Our liaison desk works from the same survey drawing so the technical and permission records stay aligned.

Regularly. Work inside an operating unit runs under the site's permit system, with hot-work and excavation clearances handled before scanning begins.

Yes — HT and LT distribution is usually among the more reliably detected targets, both by radar and by electromagnetic tracing where the cable is accessible for a direct connection.

Yes, and it is the efficient way to do it. A single mobilisation across the phases costs considerably less than treating each as a separate job.

Up to 100 km in a single day is what we have sustained on open corridors, working double shifts with owned systems. Our fastest recorded delivery stands at 700 KM in a 30-day window. In total we have completed more than 1.5 lakh km of GPR survey. Actual pace on any given site is governed by utility density, access windows and the output format required.

Breaking ground in Okhla?

Send the plot or the corridor and the authorities involved — we will survey it and prepare the drawing they will accept.

Get a Survey Quote+91 99100 10209

GPR survey in Okhla — deliverables, ground data and detailed questions

Mezux Touch surveys Okhla through Delhi alluvium buried beneath industrial made ground that deepens across the older estate phases. Realistic depth is 2 to 3 metres in open areas and less over the deepest fill. The estate has been converting from manufacturing to commercial use for years, and the servicing that fed the earlier occupants was capped or built over rather than removed, which means a plot survey here finds two networks rather than one.

How the survey is run here

Grid spacing is chosen for Okhla conditions rather than lifted from a national standard. Ground that reflects on its own account gets tighter perpendicular coverage so it is not mistaken for plant. We re-calibrate as the ground changes rather than applying one velocity to a whole corridor, which is what keeps the depth figures comparable end to end. Crews and systems are ours throughout, which is why a mobilisation date does not depend on a rental yard's availability.

What you receive

Layered DWG to your standard with per-feature depth, method and confidence. GIS output as SHP or KML on request, and a PDF issue for circulation. A signed report stating coverage, depth by section, inaccessible ground and limitations. Okhla packs carry probable process and effluent routes as a separate schedule with their own confidence statement, because breaching one is a regulatory matter rather than a repair. Approvals may involve the south corporation zone, DSIIDC on estate land, the power utility, DMRC and PWD on arterials. Raw data is archived.

Beyond the basics

What is left from the earlier industries? Process, effluent and heavy electrical servicing from units that have since closed or converted. We treat it as potentially live until an owner confirms otherwise.

Are the estate phases different? Materially. Earlier phases carry deeper fill and older servicing than the later ones, so we calibrate by phase.

Do you work inside operating units? Yes, to the operator's permit and escort system, scheduled around production rather than granted on request.

Has commercial conversion changed the ground? At the frontage, yes. Offices and showrooms added shallow servicing over the industrial network beneath.

Do you need drawings from us before starting? Not to begin, but anything you hold makes the output better. We field-verify against your records and report the differences, which is usually the more valuable half.

Terms used on this page

Process route — pipework carrying industrial fluids, breaching which is a pollution matter rather than a repair. Estate phase — a numbered development stage of an industrial area, each serviced at a different period. Potentially live — a service treated as energised until an owner confirms otherwise, rather than assumed dead. Estate conversion — the change of an industrial plot to commercial use, leaving the original servicing in the ground. Attenuation — the loss of radar energy with depth, which sets the practical limit of investigation in any given ground. Chainage — distance measured along a route, used to reference findings so a site engineer can locate them.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks