₹24/m standard₹32/m L-sectionMin 4 km · GST extra

How it works · From route file to report
LT cableWater mainHT cableOFC ductDrainL-SECTION · DEPTH ALONG THE ROUTERoute startRoute end
  1. STEP 1Route file and records
  2. STEP 2Radar and EM passes
  3. STEP 3Finds marked on road
  4. STEP 4Signed report handed over
1.5 LAKH+ KMGPR Survey Completed
58Company-Owned GPR Systems
23 YEARSUnderground Since 2003
₹24/MStandard GPR Rate · Min 4 km
Quick answer

An underground utility survey in Patna finds the cables, pipes, drains and ducts lying under a planned trench, bore or foundation before excavation. Mezux Touch scans with ground penetrating radar and EM locators, marks findings on the road and issues a signed report. Pricing: ₹24 per metre for a route survey, ₹32 with an L-section, GST extra.

Key points
  • An underground utility survey in Patna checks the ground beneath a planned trench, bore or foundation before excavation.
  • SBPDCL, Patna Municipal Corporation and telecom operators each hold their own records; none covers a whole street.
  • Patna Metro construction diverts existing services, so older corridor maps may not match the ground today.
  • Monsoon waterlogging shortens radar reach, so deep or critical crossings are better scanned in a drier spell.
  • Patna jobs carry two floors, 4 km and ₹1,00,000, while 6 km of standard survey costs ₹1,44,000.

Updated:

Survey crew member reviewing radar data on a tablet beside a cart
Readings are checked on site before a Patna stretch is signed off.
Layered map separating power cables, water pipes, drains and fibre ducts
Separate layers show which owner's service sits where along the route.
Ground cross-section showing radar signal weakening in wet clay soil
Saturated Gangetic soil after the rains shortens how far radar can see.
Printed utility survey report with route sketch and findings table
The report outlasts the paint marks and belongs in your project file.

What is an underground utility survey in Patna?

An underground utility survey in Patna is a non-destructive inspection of the ground beneath a proposed trench, bore path or foundation. It tells the excavation team which services cross or follow the route, roughly where and how deep each one lies, and which stretches could not be cleared with confidence.

Ground penetrating radar sends short pulses into the soil, and any object whose dielectric properties differ from the soil returns an echo, so pipes, cables, ducts, chambers and voids appear whether they are metal or plastic. A cable locator then traces metallic utilities – power cables, metal water mains and the like – through the current they carry or a signal applied to them. Each find is marked with paint or pegs and written up in a report.

A survey does not replace service records or permissions. It tests them against the ground, which matters wherever roads have been widened and resurfaced many times.

Why survey before digging in Patna?

The city stretches along the south bank of the Ganga, and its main roads carry services laid by several owners over many decades. Power distribution is the job of SBPDCL (South Bihar Power Distribution Company); civic roads, drainage and water fall to the Patna Municipal Corporation; telecom operators add copper cables and fibre ducts. Each body keeps its own records, and none holds a complete picture of any one street.

Patna Metro, now under construction, moves and diverts existing services, so a corridor mapped a few years back may not match what lies under it today.

Striking a live underground cable or water main brings repair bills, contract penalties, idle days and, with HT cables, real danger to the gang.

Mezux Touch is not affiliated with SBPDCL, the Patna Municipal Corporation, the metro project or any other authority or DISCOM; we report only to the client who commissions the survey.

Which types of survey suit Patna projects?

Route survey for a cable, pipe or duct

Continuous radar lines along the alignment, with short transverse passes at junctions, chambers and poles – the usual scope for HT/LT cabling, water lines and OFC ducts, at ₹24 per metre.

L-section survey

The same scan with a plotted depth profile for each detected service, at ₹32 per metre; our L-section GPR survey page explains what it adds.

Area or plot scan

A grid of radar lines across a plot, campus, depot or yard, billed on the total length of grid lines.

Crossing scan before HDD

A focused scan of a bore path and its launch and exit pits under a road or drain. The drilling side is on our Patna trenchless page.

Add-on tasks

Cable fault locating is a separate job. Trial pits or boreholes can be added on request wherever a depth or an identity must be proved.

What do the terms in a survey specification mean?

  • Detection – radar or EM registered a buried feature; on its own, that does not say what the feature is.
  • Identification – deciding that a feature is a water pipe rather than a cable, from its shape on the radargram, its EM response and surface clues such as valves or chambers.
  • Approximate depth – worked out from signal travel time and an estimated wave speed for the soil, so it is an estimate, never a surveyed level.
  • Penetration depth – the deepest level the radar could read on that stretch. High moisture content, waterlogged clay and salty soil cause signal attenuation and cut it short, while dry sand lets the signal travel further. It is reported section by section.
  • Running metre – the billing unit: one metre of route surveyed.

For more on why reach varies, read our note on soil conditions and GPR limits.

What should a reliable survey deliver?

  • Marks on the ground in utility colours, each carrying its approximate depth, placed before excavation.
  • A signed report listing every find, the method that picked it up, and a note wherever confidence is low.
  • Stated limits – unscanned stretches and the depth reached per section, so nobody assumes clear ground where the radar was blind.
  • Owned equipment, in-house crews. Mezux owns every one of its 58 GPR systems and 18 HDD rigs, and no work is sub-let.
  • Management systems certified to ISO 9001:2015 (quality), ISO 14001:2015 (environment) and ISO 45001:2018 (occupational health and safety).
  • Extras priced openly. CAD/GIS drawing sets carry their own quote; see CAD and GIS utility mapping.

How do you plan and budget a Patna survey?

  1. Fix the scope. Share a KML file or drawing, the route length and what is going into the ground.
  2. Choose the season where possible. Monsoon rain leaves low-lying parts of the city waterlogged; saturated ground shortens radar reach and standing water can stop scanning, so deep crossings suit a drier spell.
  3. Arrange access early. Carriageway permissions take time, and permits, traffic control and night work all sit outside the metre rate.
  4. Group the work. Mobilisation from Faridabad is its own quote line; adding other Bihar routes to the order spreads it.

The metre rate is ₹24 for a standard scan; adding the depth profile takes it to ₹32. Because Patna lies outside Delhi NCR, two floors apply: every order counts as at least 4 km, and every project as at least ₹1,00,000. A 3 km lane job therefore comes to ₹1,00,000, since 4 km at ₹24 gives ₹96,000, which is lifted to the floor. A 6 km duct route works out to ₹1,44,000 standard or ₹1,92,000 with an L-section. Long programmes get a discount on the whole order, in three slabs: a quarter off when the total tops 100 km, 40% off beyond 500 km, and half off beyond 1,000 km. GST is added on top.

Every slab is on the GPR survey price list, and our service page for the city is GPR survey in Patna.

How should survey records be kept once the work is done?

Paint fades in days on a busy road and pegs get pulled out, so the report is what lasts. Keep it with the project's as-built papers, tagged with your own road names and chainages. Add what excavation actually exposed – a pit that confirms a depth turns an estimate into a measured fact – and record the new service you lay, with its depth. If months pass and other agencies dig nearby, especially close to the metro works, survey again before fresh work.

Other capitals are listed on our state capitals GPR survey hub.

TIP 1

Collect existing records

Ask each service owner for whatever plans exist, even partial ones; the survey checks them against the ground instead of trusting them blindly.

TIP 2

Mind the monsoon

Soaked soil after heavy rain shortens radar reach, so schedule deep or critical crossings for drier weeks whenever the programme allows it.

TIP 3

Flag every crossing

Show each road, drain and planned bore crossing on the route file so the crew can run a closer grid at those spots.

TIP 4

Note recent diversions

Near metro works, tell us where services were recently shifted so both the diverted lines and the older ones are recorded properly.

TIP 5

Dig soon after marking

Let excavation follow the survey closely, before traffic, washing and rain wear away the paint laid on the carriageway.

FAQ

Questions about underground utility survey in Patna

How long does a utility survey in Patna take?

It depends on access, traffic and how crowded the ground is. Our output peaks at 100 km a day on open corridors when day and night shifts both run, but congested city lanes move far more slowly. The quote carries a programme for your route, and we fix the start date in writing when you confirm the order.

Can a survey tell a water pipe from a power cable?

Usually, by combining evidence. A live cable responds to EM locating, while a plastic water pipe does not. Radar shows the size and shape of the reflection, and surface features such as valve covers, chambers or cable markers help. Where identity stays uncertain, that uncertainty is written down, and opening a pit is the way to settle it.

Will radar pick up plastic pipes and ducts?

Radar responds to any buried object that differs enough from the soil around it, so plastic pipes and HDPE ducts can be detected, especially when they hold water or air. EM locating cannot see them unless a tracer wire runs alongside. Small plastic lines in wet ground are the hardest case, and low-confidence finds are flagged.

Is ground near the Ganga harder to survey?

Ground close to the river tends to hold more moisture, and wet soil absorbs radar energy, so the depth the radar can see is often shallower there than on drier, higher land. Scanning still works; the report simply records the reach achieved on each section, and deeper lines can be proved by trial pits if needed.

Is a survey worth it for one short house connection?

Our minimums make a single very short job relatively costly: any order is billed as at least 4 km, and a Patna project at no less than ₹1,00,000. Builders and contractors with several connections or a colony road usually combine them into one order, which makes far better use of the visit.

Who owns the survey report and findings?

The client who placed the order. We report to that client only, not to any civic body or service owner. If your contract requires you to pass findings to SBPDCL, the municipal corporation or a telecom operator, you can share the report; we keep a copy for our own records.

Get a quote

Send your Patna route for a quote

What to send for an exact quote

  • Route drawing, KML or list of roads with start and end points
  • City / district and site type (road, estate, plant)
  • Standard survey or L-section
  • Target start date and any working-hour limits
Standard GPR₹24/m
L-Section GPR₹32/m

Minimum 4 km · GST extra · ₹1,00,000 project minimum outside Delhi NCR · 25–50% off above 100 km.

What happens next

  1. Scope check – we confirm route length, crossings and L-section need.
  2. Written quote – rate, slab, minimums, extras and a day-by-day programme.
  3. Mobilisation – our own crew and systems on the agreed date.

Get a Quote

Route length, location and survey type – we reply with a written quote.

Trusted by India’s telecom & infrastructure leaders

Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks
Bharti Airtel
Tata Communications
TCIL
Reliance Jio
Gigatel Networks
RailTel
MTNL
BSNL
Vodafone Idea
P2P Networks